University Boulevard Improvements
- University Boulevard, Tuscaloosa, Alabama 35487
Information at a Glance
Use
Road
Status
Construction Type
Other
Current Phase
Complete
College or Division
Division of Finance and Operations
CA Filing Code
TRN-16-758
Project GSF
NA
Bid Date
TBD
Construction Start
TBD
Construction End
TBD
Project Architect
McGiffert and Associates
General Contractor
GFC Construction
Project Manager
David Welch (8-8843)
Field Coordinator
Hilton McClain
Interior Designer
NA
Project Admin
TBD
Information at a Glance
BOT Budget
$17,336,943.00
Funding Sources
-
ALDOT Transportation Enhancement Grant :
$8,617,288 -
ALDOT Reimbursement :
$473,192 -
ALDOT Phase III Reimbursement :
$274,754 -
City of Tuscaloosa Phase III Reimbursement :
$417,715 -
University Funds :
$7,553,994
Banner/Project #
90701
Project Accountant
Cindy Fowler (8-5460)
BOT Submissions
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
Request for Qualifications
Bid Information
PROJECT BID TABS
-
April 2, 2016
Phase I Improvements -
February 23, 2017
Phase II Improvements -
September 28, 2017
Tree Relocations -
March 1, 2018
Phase III Improvements
DATA LABEL | DATA VALUE |
---|---|
Category | Road |
College/Division | Division of Finance and Operations |
Status | Closed |
Construction Phase | Complete |
Construction Type | Other |
GSF | NA |
Street Address | University Boulevard, Tuscaloosa, Alabama 35487 |
Zone | |
Project Number | TRN-16-758 |
Architect | McGiffert and Associates |
Project Manager | David Welch (8-8843) |
Project Admin | TBD |
Field Coordinator | Hilton McClain |
General Contractor | GFC Construction |
Interior Designer | NA |
Bid Date | TBD |
Construction Start | TBD |
Scheduled Construction End | TBD |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/9VD1V/TRN-16-758 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90701 |
Campus Map Link | |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | |
Renderings | |
Budget | 17336943 |
Banner Fund Number | 90701 |
Project Accountant | Cindy Fowler (8-5460) |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90701&detail=all |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=80D4E1C3-B2DC-4461-9E8A-D648A9B1A44B |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code |