Bicentennial Sculpture at Manderson Landing
- 69 Jack Warner Parkway, Tuscaloosa, Alabama 65401
CA Filing Code
LAN-18-1603
Project GSF
NA
Construction End
December 2019
COSC Date
' NA
Project Architect
University Design Team
General Contractor
University Construction Administration
Project Manager
David Welch (8-8843)
Field Coordinator
Chad Elliot (8-7563)
ARTISTS
MEDIA LINKS
UA Celebrates Tuscaloosa’s Bicentennial
City of Tuscaloosa Marks 200th Birthday with Sculpture Unveiling
Sculpture Unveiled During Tuscaloosa Bicentennial Celebration
Photos: Minerva Statue Unveiled
ABOUT
On December 13, 2019, the City of Tuscaloosa celebrated its 200th birthday, and The Bicentennial Sculpture at The Park at Manderson Landing was constructed to recognize and commemorate this significant milestone. The sculpture, a gift from the University to the community, will depict the Roman goddess of wisdom, Minerva (also featured on the University’s seal), releasing an owl. This represents the release of knowledge to the city, the state, the nation and the world. The site choice along the River Walk is especially appropriate because it is shared by the citizens of Tuscaloosa and the University community. Along with the sculpture, this project included enhancements to the area lighting and landscaping. It also includes the installation of a bronze trace, embedded in the approach sidewalks, representing the course of the Black Warrior River from Tuscaloosa to Demopolis that traces a timeline through Tuscaloosa history.
BOT Budget
$540,050.00
Funding Sources
-
Gifts :
$150,000 -
University Funds :
$390,050
Banner/Project #
90822
Project Accountant
Kimberly Lewis (8-7603)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Other |
Status | Closed |
Construction Phase | Complete |
Construction Type | Other |
GSF | NA |
Street Address | 69 Jack Warner Parkway, Tuscaloosa, Alabama 65401 |
Zone | |
Project Number | LAN-18-1603 |
Architect | University Design Team |
Project Manager | David Welch (8-8843) |
Project Admin | |
Field Coordinator | Chad Elliot (8-7563) |
General Contractor | University Construction Administration |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | December 2019 |
COSC Date | NA |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/LAN-18-1603/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90822 |
Campus Map Link | |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
ARTISTS MEDIA LINKS UA Celebrates Tuscaloosa’s Bicentennial City of Tuscaloosa Marks 200th Birthday with Sculpture Unveiling Sculpture Unveiled During Tuscaloosa Bicentennial Celebration Photos: Minerva Statue Unveiled
ABOUT On December 13, 2019, the City of Tuscaloosa celebrated its 200th birthday, and The Bicentennial Sculpture at The Park at Manderson Landing was constructed to recognize and commemorate this significant milestone. The sculpture, a gift from the University to the community, will depict the Roman goddess of wisdom, Minerva (also featured on the University’s seal), releasing an owl. This represents the release of knowledge to the city, the state, the nation and the world. The site choice along the River Walk is especially appropriate because it is shared by the citizens of Tuscaloosa and the University community. Along with the sculpture, this project included enhancements to the area lighting and landscaping. It also includes the installation of a bronze trace, embedded in the approach sidewalks, representing the course of the Black Warrior River from Tuscaloosa to Demopolis that traces a timeline through Tuscaloosa history. |
Renderings | |
Budget | 540050 |
Banner Fund Number | 90822 |
Project Accountant | Kimberly Lewis (8-7603) |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90822&detail=all |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=944F709D-2A55-4366-BE64-2D53AF7491D0 |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code |