Drummond Lyon Hall

  • Colonial Drive
Information at a Glance

Use

Academic

Status

Closed

Construction Type

New Construction

Current Phase

Complete

College or Division

College of Human and Environmental Sciences

CA Filing Code

044-21-2710

Project GSF

25,000

Bid Date

May 3, 2022

Construction Start

August 8, 2022

Construction End

August 2023

Project Architect

Davis Architects

General Contractor

WAR Construction, Inc.

Project Manager

Suzanne Webster

Field Coordinator

Colby Mixon

Project Admin

Haley Tubbs

Project Summary

The Drummond Lyon Hall Building involves the construction of a three-story brick veneer building and a full basement (four floors total), to be located at the north end of the site of the existing Harris Hall location, on Colonial Drive and south of Doster Hall.

The proposed 25,000 gross square foot (gsf) facility will support the goal of enhancing the teaching and learning experience of the Clothing, Textiles and Interior Design Department and the Fashion Archive, as well as adding the necessary features to accommodate the expected growth and teaching needs of these programs.

 

UA News!

 

View Progress Photos!
Information at a Glance

BOT Budget

$18,985,400

Funding Sources

  • Gifts :
    $4,000,000
  • University Central Reserves :
    $14,685,400
  • College of Human and Environmental Sciences Reserves :
    $300,000

Banner/Project #

90951

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
Request for Qualifications
Bid Information
Bid Package Important Dates Bid Documents
Prequalifications Due:
Mandatory Pre-bid Conference:
Mandatory Pre-bid Conference Location: Procurement Services Annex
Bid Opening:
Bid Opening Location:
PROJECT BID TABS
DATA LABEL DATA VALUE
Category Academic
College/Division College of Human and Environmental Sciences
Status Closed
Construction Phase Complete
Construction Type New Construction
GSF 25,000
Street Address Colonial Drive
Zone 7
Project Number 044-21-2710
Architect Davis Architects
Project Manager Suzanne Webster
Project Admin Haley Tubbs
Field Coordinator Colby Mixon
General Contractor WAR Construction, Inc.
Interior Designer
Bid Date May 3, 2022
Construction Start August 8, 2022
Scheduled Construction End August 2023
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/044-21-2710
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90951
Campus Map Link https://map.concept3d.com/?id=1222#!m/622182
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Drummond Lyon Hall Building involves the construction of a three-story brick veneer building and a full basement (four floors total), to be located at the north end of the site of the existing Harris Hall location, on Colonial Drive and south of Doster Hall.

The proposed 25,000 gross square foot (gsf) facility will support the goal of enhancing the teaching and learning experience of the Clothing, Textiles and Interior Design Department and the Fashion Archive, as well as adding the necessary features to accommodate the expected growth and teaching needs of these programs.

 

UA News!

 

View Progress Photos!
Renderings
Budget 18985400
Banner Fund Number 90951
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage