Kirkbride Lane Parking Lot
- Between Randall Way and Kirkbride Lane at the Northwest corner of Peter Bryce Boulevard and Randall Way Intersection
Use
Parking
Status
Construction Type
New Construction
Current Phase
Construction
College or Division
Other
CA Filing Code
P236-23-3317
Project GSF
N/A
Bid Date
Spring 2024
Construction Start
Spring 2024
Construction End
June 2024
Project Architect
Duncan Coker Associates
General Contractor
Price Construction Company, Inc.
Project Manager
David Welch
Field Coordinator
TBD
Project Admin
Katie Crocker-Buta
The Kirkbride Lane Parking Lot project (“Project”) will initially include 185 parking spaces (6 dual EV charging stations) and feature standard University decorative lighting, safety features, wayfinding and landscaping. This Project will also include adjacent work to coordinate pedestrian connectivity, roadways, improvements to stormwater drainage, and upgrades to site lighting in the area.
This Project will be closely coordinated with proposed work for the Psychology Building and Renovation project to ensure efficient execution and alignment of both Projects.
BOT Budget
$2,779,230.00
Funding Sources
-
Parking Services Reserves :
$2,779,230
Banner/Project #
91222
Project Accountant
Charles Christian
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Parking |
College/Division | Other |
Parking Spaces | 245 |
Status | Active |
Construction Phase | Construction |
Construction Type | New Construction |
GSF | N/A |
Street Address | Between Randall Way and Kirkbride Lane at the Northwest corner of Peter Bryce Boulevard and Randall Way Intersection |
Zone | |
Project Number | P236-23-3317 |
Architect | Duncan Coker Associates |
Project Manager | David Welch |
Project Admin | Katie Crocker-Buta |
Field Coordinator | TBD |
General Contractor | Price Construction Company, Inc. |
Interior Designer | |
Bid Date | Spring 2024 |
Construction Start | Spring 2024 |
Scheduled Construction End | June 2024 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/P236-23-3317 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91222 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/834400 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Kirkbride Lane Parking Lot project (“Project”) will initially include 185 parking spaces (6 dual EV charging stations) and feature standard University decorative lighting, safety features, wayfinding and landscaping. This Project will also include adjacent work to coordinate pedestrian connectivity, roadways, improvements to stormwater drainage, and upgrades to site lighting in the area. This Project will be closely coordinated with proposed work for the Psychology Building and Renovation project to ensure efficient execution and alignment of both Projects. |
Renderings | |
Budget | 2779230 |
Banner Fund Number | 91222 |
Project Accountant | Charles Christian |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |