University Boulevard Hackberry to 6th Ave Infrastructure & Security Improvements
Use
Utilities & Infrastructure
Status
Construction Type
Other
Current Phase
Bid
College or Division
Other
CA Filing Code
TRN-23-3296
Project GSF
N/A
Bid Date
May 2023
Project Architect
Thompson Engineering
General Contractor
TBD
Project Manager
David Welch
Field Coordinator
TBD
Project Admin
Katie Crocker-Buta
The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard.
This Project will also provide a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter.
This Project will provide enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus.
BOT Budget
$3,590,543.00
Funding Sources
-
University Central Reserves:
$3,590,543
Banner/Project #
98881
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Utilities & Infrastructure |
College/Division | Other |
Status | Active |
Construction Phase | Bid |
Construction Type | Other |
GSF | N/A |
Street Address | |
Zone | |
Project Number | TRN-23-3296 |
Architect | Thompson Engineering |
Project Manager | David Welch |
Project Admin | Katie Crocker-Buta |
Field Coordinator | TBD |
General Contractor | TBD |
Interior Designer | |
Bid Date | May 2023 |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard. This Project will also provide a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter. This Project will provide enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus. |
Renderings | |
Budget | 3590543 |
Banner Fund Number | 98881 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | Array |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | Array |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | Array |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage | Array |