University Boulevard Hackberry to 6th Ave Infrastructure & Security Improvements

  • University Boulevard between Hackberry Ln and 6th Ave
Information at a Glance

Use

Utilities & Infrastructure

Status

Closed

Construction Type

Other

Current Phase

Complete

College or Division

Other

CA Filing Code

TRN-23-3296

Project GSF

N/A

Bid Date

May 2023

Construction End

August 2023

Project Architect

Thompson Engineering

Project Manager

David Welch

Project Admin

Katie Crocker-Buta

Project Summary

The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard.

This Project will also provide a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter.

This Project will provide enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus.


Information at a Glance

BOT Budget

$3,590,543.00

Funding Sources

  • University Central Reserves:
    $3,590,543

Banner/Project #

91217

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Closed
Construction Phase Complete
Construction Type Other
GSF N/A
Street Address University Boulevard between Hackberry Ln and 6th Ave
Zone
Project Number TRN-23-3296
Architect Thompson Engineering
Project Manager David Welch
Project Admin Katie Crocker-Buta
Field Coordinator
General Contractor
Interior Designer
Bid Date May 2023
Construction Start
Scheduled Construction End August 2023
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/TRN-23-3296
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91217
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard.

This Project will also provide a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter.

This Project will provide enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus.

Renderings
Budget 3590543
Banner Fund Number 91217
Project Accountant Sonia Wilkins
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations Array
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage Array