Drummond Lyon Hall
- Colonial Drive
Use
Academic
Status
Construction Type
New Construction
Current Phase
Complete
College or Division
College of Human and Environmental Sciences
CA Filing Code
044-21-2710
Project GSF
25,000
Bid Date
May 3, 2022
Construction Start
August 8, 2022
Construction End
August 2023
Project Architect
Davis Architects
General Contractor
WAR Construction, Inc.
Project Manager
Suzanne Webster
Field Coordinator
Colby Mixon
Project Admin
Haley Tubbs
The Drummond Lyon Hall Building involves the construction of a three-story brick veneer building and a full basement (four floors total), to be located at the north end of the site of the existing Harris Hall location, on Colonial Drive and south of Doster Hall.
The proposed 25,000 gross square foot (gsf) facility will support the goal of enhancing the teaching and learning experience of the Clothing, Textiles and Interior Design Department and the Fashion Archive, as well as adding the necessary features to accommodate the expected growth and teaching needs of these programs.
UA News!
View Progress Photos!
BOT Budget
$18,985,400.00
Funding Sources
-
Gifts :
$4,000,000 -
University Central Reserves :
$14,685,400 -
College of Human and Environmental Sciences Reserves :
$300,000
Banner/Project #
90951
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
Bid Package | Important Dates | Bid Documents | |
---|---|---|---|
Prequalifications Due:
Mandatory Pre-bid Conference: Mandatory Pre-bid Conference Location: Procurement Services Annex Bid Opening: Bid Opening Location: |
|||
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | College of Human and Environmental Sciences |
Status | Closed |
Construction Phase | Complete |
Construction Type | New Construction |
GSF | 25,000 |
Street Address | Colonial Drive |
Zone | 7 |
Project Number | 044-21-2710 |
Architect | Davis Architects |
Project Manager | Suzanne Webster |
Project Admin | Haley Tubbs |
Field Coordinator | Colby Mixon |
General Contractor | WAR Construction, Inc. |
Interior Designer | |
Bid Date | May 3, 2022 |
Construction Start | August 8, 2022 |
Scheduled Construction End | August 2023 |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/044-21-2710 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90951 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/622182 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Drummond Lyon Hall Building involves the construction of a three-story brick veneer building and a full basement (four floors total), to be located at the north end of the site of the existing Harris Hall location, on Colonial Drive and south of Doster Hall. The proposed 25,000 gross square foot (gsf) facility will support the goal of enhancing the teaching and learning experience of the Clothing, Textiles and Interior Design Department and the Fashion Archive, as well as adding the necessary features to accommodate the expected growth and teaching needs of these programs. UA News! View Progress Photos! |
Renderings | |
Budget | 18985400 |
Banner Fund Number | 90951 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |