Student Services Addition and Renovation
- 801 Campus Drive
Use
Academic
Status
Construction Type
Addition
Current Phase
Programming
College or Division
Other
CA Filing Code
021-22-3120
Project GSF
22,160
Project Architect
Chambless King Architects
General Contractor
TBD
Project Manager
Brittany Kyles
Field Coordinator
Joe Daidone
Project Admin
Haley Tubbs
The Project scope is comprised of a 16,003 gross square feet (GSF) two-story addition to the Student Services Center, to be located between Student Services and B.B. Comer Hall (home of Capstone International Center), and approximately 6,157 GSF of renovated space within the Student Services Center. The renovation will support the new addition by addressing the new circulation and connectivity on the ground level and will improve the overall efficiency of the facility by addressing deferred maintenance items such as the replacement of the existing roof.
The remainder of the addition will house the Center for Service and Leadership, currently located in the UA Student Center. This relocation will provide increased space which will be used to expand student engagement and cultivate additional community partnerships and programs.
The Project will also consist of a new amphitheater near Marrs Springs Pond, providing an outdoor area for learning, events, and student activities. These spaces will bring cohesion to this central area of campus directly off the Crimson Promenade and across from the main entrance to the Student Center, further increasing student engagement.
Finally, the Addition will include appropriate architectural and site considerations to ensure that it
complements the Crimson Promenade, enhances pedestrian connectivity and forms an appropriate
composition with both Student Services and the main promenade entrance to the University of Alabama Student Center.
BOT Budget
$22,000,000.00
Funding Sources
-
University Central Reserves :
$22,000,000
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | Other |
Status | Active |
Construction Phase | Programming |
Construction Type | Addition |
GSF | 22,160 |
Street Address | 801 Campus Drive |
Zone | |
Project Number | 021-22-3120 |
Architect | Chambless King Architects |
Project Manager | Brittany Kyles |
Project Admin | Haley Tubbs |
Field Coordinator | Joe Daidone |
General Contractor | TBD |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Project scope is comprised of a 16,003 gross square feet (GSF) two-story addition to the Student Services Center, to be located between Student Services and B.B. Comer Hall (home of Capstone International Center), and approximately 6,157 GSF of renovated space within the Student Services Center. The renovation will support the new addition by addressing the new circulation and connectivity on the ground level and will improve the overall efficiency of the facility by addressing deferred maintenance items such as the replacement of the existing roof. The remainder of the addition will house the Center for Service and Leadership, currently located in the UA Student Center. This relocation will provide increased space which will be used to expand student engagement and cultivate additional community partnerships and programs. The Project will also consist of a new amphitheater near Marrs Springs Pond, providing an outdoor area for learning, events, and student activities. These spaces will bring cohesion to this central area of campus directly off the Crimson Promenade and across from the main entrance to the Student Center, further increasing student engagement. Finally, the Addition will include appropriate architectural and site considerations to ensure that it |
Renderings | |
Budget | 22000000 |
Banner Fund Number | |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |