Alston Hall Renovation
- 361 Stadium Drive
Use
Academic
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
College of Business
CA Filing Code
032-23-3112
Project GSF
14,350
Bid Date
March 9, 2023
Construction Start
May 8, 2023
Construction End
August 2023
Project Architect
Williams Blackstock Architects
General Contractor
Kyser Construction
Project Manager
Brittany Kyles
Field Coordinator
Zach Green
Project Admin
Haley Tubbs
The Proposed Project includes the interior renovation of select student and administrative areas
on all floors of Alston Hall. The proposed work will address deferred maintenance needs such
as replacing flooring, windows, mechanical equipment, electrical equipment, and installing fire
protection. The Project renovation will create needed space to support high-quality business
education by increasing collaboration spaces designed to prepare students for the corporate
climate they will encounter upon graduation, while also providing additional administrative
space critically necessary to managing and supporting the College’s growth.
The Project is not a comprehensive renovation of the entire interior of the building and only
addresses high impact student areas and select administrative and faculty office space.
BOT Budget
$10,700,000
Funding Sources
-
University Central Reserves :
$6,700,000 -
Gifts :
$3,600,000 -
Capstone College of Business Reserves :
$400,000
Banner/Project #
91200
Project Accountant
Elsie Smith
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
January 24, 2023
Alston Hall Renovation - Window Package -
January 24, 2023
Alston Hall Renovation - Demo Package -
March 9, 2023
Alston Hall Renovation - Main Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | College of Business |
Status | Closed |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 14,350 |
Street Address | 361 Stadium Drive |
Zone | 1 |
Project Number | 032-23-3112 |
Architect | Williams Blackstock Architects |
Project Manager | Brittany Kyles |
Project Admin | Haley Tubbs |
Field Coordinator | Zach Green |
General Contractor | Kyser Construction |
Interior Designer | |
Bid Date | March 9, 2023 |
Construction Start | May 8, 2023 |
Scheduled Construction End | August 2023 |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | https://giving.ua.edu/alston-hall/ |
SharePoint Active Project Site Link | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Proposed Project includes the interior renovation of select student and administrative areas The Project is not a comprehensive renovation of the entire interior of the building and only |
Renderings | |
Budget | 10700000 |
Banner Fund Number | 91200 |
Project Accountant | Elsie Smith |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |