Reese Phifer Radio and Satellite Farm Relocation
- 901 University Boulevard & Campus Drive East
Use
Utilities & Infrastructure
Status
Construction Type
Other
Current Phase
Construction
College or Division
Division of Finance and Operations
CA Filing Code
000-18-1481
Project GSF
432
Bid Date
July 11, 2023
Construction Start
Spring 2024
Construction End
August 2024
Project Architect
LBYD, Inc.
General Contractor
Hall-Taylor Construction Co., Inc
Project Manager
Shawn Templeton
Field Coordinator
Chad Elliott
Project Admin
Cassidy Largin
The Reese Phifer Radio & Satellite Farm Relocation project (“Project”) is necessary to relocate the existing satellite dishes and antennas from the Reese Phifer area and tower to the existing University of Alabama Police Department (UAPD) tower site on Campus Drive East. The tower located adjacent to Reese Phifer was erected in 1955 and is owned by Alabama Public Television (API). Due to the age and type of the tower, recurring maintenance is required and APT is dependent on state funding and limited donations to maintain the tower. The location in the core of campus is not optimal.
The UAPD tower site, located east of campus, was constructed with space reserved on the tower to accommodate the antennas currently residing on the Reese Phifer tower. In addition, there is undeveloped land, located to the west of the UAPD tower site, available for constructing a satellite farm to house the satellite dishes being relocated and their respective supporting equipment.
This Project includes all necessary network and fiber connections, site development, infrastructure, equipment relocation, and generator required to support the facility and to maintain operational effectiveness. Following relocation, the existing radio tower and remaining satellite dishes will be removed from the area immediately adjacent to Reese Phifer and the area will be available for redevelopment. This will greatly improve the aesthetics of the Reese Phifer Hall common grounds and the Colonial Drive area as well as improve the campus visuals.
Proposed scope additions and enhancements were identified during the evaluation of the programming documents and design process after reengaging the Project. These include:
- A larger site-built equipment shelter in lieu of prefabricated at the UAPD tower site dedicated to support the equipment being located onsite. Lead times for prefabricated shelters have markedly increased due to the increase in the telecom industry related to broadband fiber deployment and the loss of a key fabricator.
- Replacement Satellite equipment (including dishes and supporting equipment) in lieu of relocating existing equipment due to technology changes during the time of suspension of the project.
- Additional consulting services required to coordinate new and existing equipment on the existing cell tower, and to complete all required tower recertifications at the conclusion of the project.
BOT Budget
$3,953,665.00
Funding Sources
-
University Central Reserves :
$3,953,665
Banner/Project #
98228
Project Accountant
Kimberly Lewis (8-7603)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
Due By: November 18, 2019 5:00 pm
RFQ Reese Phifer Radio and Satellite Farm Relocation (UA#000-18-1481) - Insurance Requirement
- Vendor Disclosure
DATA LABEL | DATA VALUE |
---|---|
Category | Utilities & Infrastructure |
College/Division | Division of Finance and Operations |
Parking Spaces | |
Status | Active |
Construction Phase | Construction |
Construction Type | Other |
GSF | 432 |
Street Address | 901 University Boulevard & Campus Drive East |
Zone | 7 |
Project Number | 000-18-1481 |
Architect | LBYD, Inc. |
Project Manager | Shawn Templeton |
Project Admin | Cassidy Largin |
Field Coordinator | Chad Elliott |
General Contractor | Hall-Taylor Construction Co., Inc |
Interior Designer | |
Bid Date | July 11, 2023 |
Construction Start | Spring 2024 |
Scheduled Construction End | August 2024 |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/7M27T/000-18-1481/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98228 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/436361 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Construction Photos Link | |
Project Summary |
The Reese Phifer Radio & Satellite Farm Relocation project (“Project”) is necessary to relocate the existing satellite dishes and antennas from the Reese Phifer area and tower to the existing University of Alabama Police Department (UAPD) tower site on Campus Drive East. The tower located adjacent to Reese Phifer was erected in 1955 and is owned by Alabama Public Television (API). Due to the age and type of the tower, recurring maintenance is required and APT is dependent on state funding and limited donations to maintain the tower. The location in the core of campus is not optimal. The UAPD tower site, located east of campus, was constructed with space reserved on the tower to accommodate the antennas currently residing on the Reese Phifer tower. In addition, there is undeveloped land, located to the west of the UAPD tower site, available for constructing a satellite farm to house the satellite dishes being relocated and their respective supporting equipment. This Project includes all necessary network and fiber connections, site development, infrastructure, equipment relocation, and generator required to support the facility and to maintain operational effectiveness. Following relocation, the existing radio tower and remaining satellite dishes will be removed from the area immediately adjacent to Reese Phifer and the area will be available for redevelopment. This will greatly improve the aesthetics of the Reese Phifer Hall common grounds and the Colonial Drive area as well as improve the campus visuals. Proposed scope additions and enhancements were identified during the evaluation of the programming documents and design process after reengaging the Project. These include:
|
Renderings | |
Budget | 3953665 |
Banner Fund Number | 98228 |
Project Accountant | Kimberly Lewis (8-7603) |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=956CCD72-583C-4AEE-9F48-43CD8F0351ED |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=98228&detail=all |
View Bid Tab | http://constructionpublicinfo.ua.edu/bid-tabs |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
BOT Stage I | |
BOT Stage II | |
BOT Stage III | |
BOT Stage IV | |
Attachment I | |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
CSP I PDF | |
CSP II PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Info Item PDF | |
BOT Site | |
COSC Date | |
Year End Inspection | |
View Warranty Documents | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Funding Source(s) | |
Fundraising Site | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code | |
BOT Stage |