Quad Security Enhancements
- University Boulevard
Use
Utilities & Infrastructure
Status
Active
Construction Type
Infrastructure/Utilities
Current Phase
Construction
College or Division
General Campus
CA Filing Code
000-25-4101
Project GSF
N/A
Bid Date
February 24, 2026
Construction Start
May 2026
Construction End
August 2026
Project Architect
Duncan Coker Associates
General Contractor
Lavender, Inc.
Project Manager
David Welch
Field Coordinator
Trent Morrison
Project Admin
Ambria Carter
The Quad Security Enhancements and Gateways Project (“Project”), located on University Boulevard from Colonial Drive to 6th Avenue and along the east side of the Quad from Capstone Drive to University Boulevard, will increase the overall pedestrian safety of the Quad. The Project will include bollard installation between the roadways and the exterior sidewalks for a layer of protection for pedestrians.
BOT Budget
$2,383,251
Funding Sources
-
ETF A&T Appropriations Act#2025-269/SB114 :
$2,383,251
Banner/Project #
91346
Project Accountant
Parker Christian
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Utilities & Infrastructure |
| College/Division | General Campus |
| Status | Active |
| Construction Phase | Construction |
| Construction Type | Infrastructure/Utilities |
| Street Address | University Boulevard |
| Zone | |
| GSF | N/A |
| Project Number | 000-25-4101 |
| Architect | Duncan Coker Associates |
| General Contractor | Lavender, Inc. |
| Project Manager | David Welch |
| Project Admin | Ambria Carter |
| Field Coordinator | Trent Morrison |
| Interior Designer | |
| Bid Date | February 24, 2026 |
| Construction Start | May 2026 |
| Scheduled Construction End | August 2026 |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/4263M/000-25-4101 |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=9146 |
| Campus Map Link | https://map.concept3d.com/?id=1222#!m/1187707?share |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The Quad Security Enhancements and Gateways Project (“Project”), located on University Boulevard from Colonial Drive to 6th Avenue and along the east side of the Quad from Capstone Drive to University Boulevard, will increase the overall pedestrian safety of the Quad. The Project will include bollard installation between the roadways and the exterior sidewalks for a layer of protection for pedestrians. |
| Renderings | |
| Budget | 2383251 |
| Banner Fund Number | 91346 |
| Project Accountant | Parker Christian |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |