Quad Security Enhancements

  • University Boulevard
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

Infrastructure/Utilities

Current Phase

Bid

College or Division

General Campus

CA Filing Code

000-25-4101

Project GSF

N/A

Bid Date

TBD

Construction Start

TBD

Construction End

TBD

Project Architect

Duncan Coker Associates

General Contractor

TBD

Project Manager

David Welch

Field Coordinator

Trent Morrison

Project Admin

Allie Largin

Project Summary

The Quad Security Enhancements and Gateways Project (“Project”), located on University Boulevard from Colonial Drive to 6th Avenue and along the east side of the Quad from Capstone Drive to University Boulevard, will increase the overall pedestrian safety of the Quad. The Project will include bollard installation between the roadways and the exterior sidewalks for a layer of protection for pedestrians.


Information at a Glance

BOT Budget

$2,383,251

Funding Sources

  • ETF A&T Appropriations Act#2025-269/SB114 :
    $2,383,251

Banner/Project #

91346

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division General Campus
Status Active
Construction Phase Bid
Construction Type Infrastructure/Utilities
Street Address University Boulevard
Zone
GSF N/A
Project Number 000-25-4101
Architect Duncan Coker Associates
General Contractor TBD
Project Manager David Welch
Project Admin Allie Largin
Field Coordinator Trent Morrison
Interior Designer
Bid Date TBD
Construction Start TBD
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/4263M/000-25-4101
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=9146
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Quad Security Enhancements and Gateways Project (“Project”), located on University Boulevard from Colonial Drive to 6th Avenue and along the east side of the Quad from Capstone Drive to University Boulevard, will increase the overall pedestrian safety of the Quad. The Project will include bollard installation between the roadways and the exterior sidewalks for a layer of protection for pedestrians.

Renderings
Budget 2383251
Banner Fund Number 91346
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage