Univ. Blvd. Rose Admin. to 6th Ave. Infrastructure Improvements and Storm Drainage Extension

  • University Boulevard from Rose Administration to 6th Avenue
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

Infrastructure/Utilities

Current Phase

Design

College or Division

General Campus

CA Filing Code

000-26-4176

Project Architect

Duncan Coker Associates

Project Manager

David Welch

Project Summary

The proposed University Boulevard Rose Administration to 6th Avenue Infrastructure Improvements and Storm Drainage Extension project (“Project”) will deliver essential upgrades to the storm drainage system along University Boulevard, a primary connector serving as a vital corridor into the academic core of campus. The Project includes a significant expansion of stormsewer coverage. These enhancements are designed to substantially reduce recurring roadway and sidewalk flooding that has historically impeded vehicular movement, pedestrian access, and overall circulation within this key campus corridor.

The Project will also include the removal of existing concrete paving and the installation of new asphalt, creating a smoother, more durable, and visually cohesive roadway consistent with previous phases of University Boulevard improvements. Additionally, new, wider sidewalks will be constructed on the southern side of University Boulevard, improving pedestrian comfort, accessibility, and safety along this heavily traveled route. This project will include exterior security enhancements to the north side of the yard and the entrance to the President’s Mansion.

Enhanced landscaping and hardscaping elements will further improve the aesthetics and functionality of this gateway, supporting the daily movement of students, faculty, staff, and visitors throughout the University’s central academic areas.


Information at a Glance

BOT Budget

$4,497,229

Funding Sources

  • Institutional Reserves :
    $4,497,229
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division General Campus
Status Active
Construction Phase Design
Construction Type Infrastructure/Utilities
Street Address University Boulevard from Rose Administration to 6th Avenue
Zone
GSF
Project Number 000-26-4176
Architect Duncan Coker Associates
General Contractor
Project Manager David Welch
Project Admin
Field Coordinator
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed University Boulevard Rose Administration to 6th Avenue Infrastructure Improvements and Storm Drainage Extension project (“Project”) will deliver essential upgrades to the storm drainage system along University Boulevard, a primary connector serving as a vital corridor into the academic core of campus. The Project includes a significant expansion of stormsewer coverage. These enhancements are designed to substantially reduce recurring roadway and sidewalk flooding that has historically impeded vehicular movement, pedestrian access, and overall circulation within this key campus corridor.

The Project will also include the removal of existing concrete paving and the installation of new asphalt, creating a smoother, more durable, and visually cohesive roadway consistent with previous phases of University Boulevard improvements. Additionally, new, wider sidewalks will be constructed on the southern side of University Boulevard, improving pedestrian comfort, accessibility, and safety along this heavily traveled route. This project will include exterior security enhancements to the north side of the yard and the entrance to the President’s Mansion.

Enhanced landscaping and hardscaping elements will further improve the aesthetics and functionality of this gateway, supporting the daily movement of students, faculty, staff, and visitors throughout the University’s central academic areas.

Renderings
Budget 4497229
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage