Univ. Blvd. Rose Admin. to 6th Ave. Infrastructure Improvements and Storm Drainage Extension
- University Boulevard from Rose Administration to 6th Avenue
Use
Utilities & Infrastructure
Status
Active
Construction Type
Infrastructure/Utilities
Current Phase
Design
College or Division
General Campus
CA Filing Code
000-26-4176
Project Architect
Duncan Coker Associates
Project Manager
David Welch
The proposed University Boulevard Rose Administration to 6th Avenue Infrastructure Improvements and Storm Drainage Extension project (“Project”) will deliver essential upgrades to the storm drainage system along University Boulevard, a primary connector serving as a vital corridor into the academic core of campus. The Project includes a significant expansion of stormsewer coverage. These enhancements are designed to substantially reduce recurring roadway and sidewalk flooding that has historically impeded vehicular movement, pedestrian access, and overall circulation within this key campus corridor.
The Project will also include the removal of existing concrete paving and the installation of new asphalt, creating a smoother, more durable, and visually cohesive roadway consistent with previous phases of University Boulevard improvements. Additionally, new, wider sidewalks will be constructed on the southern side of University Boulevard, improving pedestrian comfort, accessibility, and safety along this heavily traveled route. This project will include exterior security enhancements to the north side of the yard and the entrance to the President’s Mansion.
Enhanced landscaping and hardscaping elements will further improve the aesthetics and functionality of this gateway, supporting the daily movement of students, faculty, staff, and visitors throughout the University’s central academic areas.
BOT Budget
$4,497,229
Funding Sources
-
Institutional Reserves :
$4,497,229
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Utilities & Infrastructure |
| College/Division | General Campus |
| Status | Active |
| Construction Phase | Design |
| Construction Type | Infrastructure/Utilities |
| Street Address | University Boulevard from Rose Administration to 6th Avenue |
| Zone | |
| GSF | |
| Project Number | 000-26-4176 |
| Architect | Duncan Coker Associates |
| General Contractor | |
| Project Manager | David Welch |
| Project Admin | |
| Field Coordinator | |
| Interior Designer | |
| Bid Date | |
| Construction Start | |
| Scheduled Construction End | |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The proposed University Boulevard Rose Administration to 6th Avenue Infrastructure Improvements and Storm Drainage Extension project (“Project”) will deliver essential upgrades to the storm drainage system along University Boulevard, a primary connector serving as a vital corridor into the academic core of campus. The Project includes a significant expansion of stormsewer coverage. These enhancements are designed to substantially reduce recurring roadway and sidewalk flooding that has historically impeded vehicular movement, pedestrian access, and overall circulation within this key campus corridor. The Project will also include the removal of existing concrete paving and the installation of new asphalt, creating a smoother, more durable, and visually cohesive roadway consistent with previous phases of University Boulevard improvements. Additionally, new, wider sidewalks will be constructed on the southern side of University Boulevard, improving pedestrian comfort, accessibility, and safety along this heavily traveled route. This project will include exterior security enhancements to the north side of the yard and the entrance to the President’s Mansion. Enhanced landscaping and hardscaping elements will further improve the aesthetics and functionality of this gateway, supporting the daily movement of students, faculty, staff, and visitors throughout the University’s central academic areas. |
| Renderings | |
| Budget | 4497229 |
| Banner Fund Number | |
| Project Accountant | |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |