Central Bryce Parking Lot and Roundabout
- 200 Peter Bryce Boulevard
Use
Parking
Status
Active
Construction Type
Infrastructure/Utilities
Current Phase
Construction
College or Division
Barefield College of Arts and Sciences
CA Filing Code
TRN-25-4039
Bid Date
February 17, 2026
Construction Start
Spring 2026
Project Architect
Duncan Coker Associates
General Contractor
Price Civil Services
Project Manager
Heather Mitchell
The Central Bryce Parking Lot and Roundabout project (“Project”) will be located on the Peter Bryce Campus, directly adjacent to the Smith Family Center for the Performing Arts and Capital Hall. This Project represents an expansion of the previously completed parking lot constructed to support Capital Hall and other nearby facilities.
The Project will complete the west portion of the Central Bryce Parking Lot, adding approximately 251 new spaces and bringing the total parking capacity for the area to approximately 420 spaces. In addition, the Project will construct a new roundabout at the north entry of the Smith Family Center for the Performing Arts to improve traffic circulation, accessibility, and pedestrian safety for students, faculty, visitors, and service vehicles.
The Project scope includes University standard site lighting, pedestrian walkways, traffic control, wayfinding, and landscape enhancements to ensure consistency with existing campus design standards. It will also include stormwater management improvements, security infrastructure, and ADA-compliant access, providing long-term support for campus operations, and aligning with University design guidelines.
BOT Budget
$3,771,472
Funding Sources
-
Transportation Reserves :
$2,262,883 -
Institutional Reserves :
$1,508,589
Banner/Project #
91324
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Parking |
| College/Division | Barefield College of Arts and Sciences |
| Parking Spaces | 251 |
| Status | Active |
| Construction Phase | Construction |
| Construction Type | Infrastructure/Utilities |
| GSF | |
| Street Address | 200 Peter Bryce Boulevard |
| Zone | |
| Project Number | TRN-25-4039 |
| Architect | Duncan Coker Associates |
| Project Manager | Heather Mitchell |
| Project Admin | |
| Field Coordinator | |
| General Contractor | Price Civil Services |
| Interior Designer | |
| Bid Date | February 17, 2026 |
| Construction Start | Spring 2026 |
| Scheduled Construction End | |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/TRN-25-4039 |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91324 |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The Central Bryce Parking Lot and Roundabout project (“Project”) will be located on the Peter Bryce Campus, directly adjacent to the Smith Family Center for the Performing Arts and Capital Hall. This Project represents an expansion of the previously completed parking lot constructed to support Capital Hall and other nearby facilities. The Project will complete the west portion of the Central Bryce Parking Lot, adding approximately 251 new spaces and bringing the total parking capacity for the area to approximately 420 spaces. In addition, the Project will construct a new roundabout at the north entry of the Smith Family Center for the Performing Arts to improve traffic circulation, accessibility, and pedestrian safety for students, faculty, visitors, and service vehicles. The Project scope includes University standard site lighting, pedestrian walkways, traffic control, wayfinding, and landscape enhancements to ensure consistency with existing campus design standards. It will also include stormwater management improvements, security infrastructure, and ADA-compliant access, providing long-term support for campus operations, and aligning with University design guidelines. |
| Renderings | |
| Budget | 3771472 |
| Banner Fund Number | 91324 |
| Project Accountant | |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |