Central Bryce Parking Lot and Roundabout

  • 200 Peter Bryce Boulevard
Information at a Glance

Use

Parking

Status

Active

Construction Type

Infrastructure/Utilities

Current Phase

Construction

College or Division

Barefield College of Arts and Sciences

CA Filing Code

TRN-25-4039

Bid Date

February 17, 2026

Construction Start

Spring 2026

Project Architect

Duncan Coker Associates

General Contractor

Price Civil Services

Project Manager

Heather Mitchell

Project Summary

The Central Bryce Parking Lot and Roundabout project (“Project”) will be located on the Peter Bryce Campus, directly adjacent to the Smith Family Center for the Performing Arts and Capital Hall. This Project represents an expansion of the previously completed parking lot constructed to support Capital Hall and other nearby facilities.

The Project will complete the west portion of the Central Bryce Parking Lot, adding approximately 251 new spaces and bringing the total parking capacity for the area to approximately 420 spaces. In addition, the Project will construct a new roundabout at the north entry of the Smith Family Center for the Performing Arts to improve traffic circulation, accessibility, and pedestrian safety for students, faculty, visitors, and service vehicles.

The Project scope includes University standard site lighting, pedestrian walkways, traffic control, wayfinding, and landscape enhancements to ensure consistency with existing campus design standards. It will also include stormwater management improvements, security infrastructure, and ADA-compliant access, providing long-term support for campus operations, and aligning with University design guidelines.


Information at a Glance

BOT Budget

$3,771,472

Funding Sources

  • Transportation Reserves :
    $2,262,883
  • Institutional Reserves :
    $1,508,589

Banner/Project #

91324

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Parking
College/Division Barefield College of Arts and Sciences
Parking Spaces 251
Status Active
Construction Phase Construction
Construction Type Infrastructure/Utilities
GSF
Street Address 200 Peter Bryce Boulevard
Zone
Project Number TRN-25-4039
Architect Duncan Coker Associates
Project Manager Heather Mitchell
Project Admin
Field Coordinator
General Contractor Price Civil Services
Interior Designer
Bid Date February 17, 2026
Construction Start Spring 2026
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/TRN-25-4039
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91324
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Central Bryce Parking Lot and Roundabout project (“Project”) will be located on the Peter Bryce Campus, directly adjacent to the Smith Family Center for the Performing Arts and Capital Hall. This Project represents an expansion of the previously completed parking lot constructed to support Capital Hall and other nearby facilities.

The Project will complete the west portion of the Central Bryce Parking Lot, adding approximately 251 new spaces and bringing the total parking capacity for the area to approximately 420 spaces. In addition, the Project will construct a new roundabout at the north entry of the Smith Family Center for the Performing Arts to improve traffic circulation, accessibility, and pedestrian safety for students, faculty, visitors, and service vehicles.

The Project scope includes University standard site lighting, pedestrian walkways, traffic control, wayfinding, and landscape enhancements to ensure consistency with existing campus design standards. It will also include stormwater management improvements, security infrastructure, and ADA-compliant access, providing long-term support for campus operations, and aligning with University design guidelines.

Renderings
Budget 3771472
Banner Fund Number 91324
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage