Bidgood Hall Welcome Center Renovation
- 500 Colonial Drive
Use
Academic
Status
Active
Construction Type
Renovation
Current Phase
Design
College or Division
Culverhouse College of Business
CA Filing Code
031-25-3877
Project GSF
3,640
Bid Date
February 26, 2026
Construction Start
Spring 2026
Construction End
July 31, 2026
Project Architect
Williams Blackstock Architects
General Contractor
Snow-Blakeney Construction
Project Manager
Brittany Kyles
The Project remodels 3,600 GSF of currently underutilized space in Bidgood Hall just off the Quad to meet very specific College needs. The main (central) space would become a welcome center for prospective students and their families; adjacent to this space would be a dedicated room for recruitment meetings with prospective students and their families. Currently, these meetings are conducted on the third floor of Bidgood Hall in a classroom. Navigating to the current space requires families to traverse through several floors of older less-than-ideal spaces, and some families get lost. The Project would create a much more welcoming space and enhance the prospective student and family experience and introduction to Culverhouse and UA.
On the other side of the central welcome center would be a room dedicated to the College’s professional development program, LEAD. LEAD is required for all of the College’s nearly 10,000 undergraduate students, and a significant component of LEAD is professional coaching sessions. This would be dedicated space for coaching and would replace the teaching classrooms the College now must use.
The Project would receive the standard UA finishes and address all necessary deferred maintenance items in the area of the renovation.
BOT Budget
$1,575,000
Funding Sources
-
Culverhouse College of Business Reserves :
$1,575,000
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Academic |
| College/Division | Culverhouse College of Business |
| Status | Active |
| Construction Phase | Design |
| Construction Type | Renovation |
| GSF | 3,640 |
| Street Address | 500 Colonial Drive |
| Zone | |
| Project Number | 031-25-3877 |
| Architect | Williams Blackstock Architects |
| Project Manager | Brittany Kyles |
| Project Admin | |
| Field Coordinator | |
| General Contractor | Snow-Blakeney Construction |
| Interior Designer | |
| Bid Date | February 26, 2026 |
| Construction Start | Spring 2026 |
| Scheduled Construction End | July 31, 2026 |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/1047-25-3902 |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The Project remodels 3,600 GSF of currently underutilized space in Bidgood Hall just off the Quad to meet very specific College needs. The main (central) space would become a welcome center for prospective students and their families; adjacent to this space would be a dedicated room for recruitment meetings with prospective students and their families. Currently, these meetings are conducted on the third floor of Bidgood Hall in a classroom. Navigating to the current space requires families to traverse through several floors of older less-than-ideal spaces, and some families get lost. The Project would create a much more welcoming space and enhance the prospective student and family experience and introduction to Culverhouse and UA. On the other side of the central welcome center would be a room dedicated to the College’s professional development program, LEAD. LEAD is required for all of the College’s nearly 10,000 undergraduate students, and a significant component of LEAD is professional coaching sessions. This would be dedicated space for coaching and would replace the teaching classrooms the College now must use. The Project would receive the standard UA finishes and address all necessary deferred maintenance items in the area of the renovation. |
| Renderings | |
| Budget | 1575000 |
| Banner Fund Number | |
| Project Accountant | |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |