Bidgood Hall Welcome Center Renovation

  • 500 Colonial Drive
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Design

College or Division

Culverhouse College of Business

CA Filing Code

031-25-3877

Project GSF

3,640

Bid Date

February 26, 2026

Construction Start

Spring 2026

Construction End

July 31, 2026

Project Architect

Williams Blackstock Architects

General Contractor

Snow-Blakeney Construction

Project Manager

Brittany Kyles

Project Summary

The Project remodels 3,600 GSF of currently underutilized space in Bidgood Hall just off the Quad to meet very specific College needs. The main (central) space would become a welcome center for prospective students and their families; adjacent to this space would be a dedicated room for recruitment meetings with prospective students and their families. Currently, these meetings are conducted on the third floor of Bidgood Hall in a classroom. Navigating to the current space requires families to traverse through several floors of older less-than-ideal spaces, and some families get lost. The Project would create a much more welcoming space and enhance the prospective student and family experience and introduction to Culverhouse and UA.

On the other side of the central welcome center would be a room dedicated to the College’s professional development program, LEAD. LEAD is required for all of the College’s nearly 10,000 undergraduate students, and a significant component of LEAD is professional coaching sessions. This would be dedicated space for coaching and would replace the teaching classrooms the College now must use.

The Project would receive the standard UA finishes and address all necessary deferred maintenance items in the area of the renovation.


Information at a Glance

BOT Budget

$1,575,000

Funding Sources

  • Culverhouse College of Business Reserves :
    $1,575,000
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division Culverhouse College of Business
Status Active
Construction Phase Design
Construction Type Renovation
GSF 3,640
Street Address 500 Colonial Drive
Zone
Project Number 031-25-3877
Architect Williams Blackstock Architects
Project Manager Brittany Kyles
Project Admin
Field Coordinator
General Contractor Snow-Blakeney Construction
Interior Designer
Bid Date February 26, 2026
Construction Start Spring 2026
Scheduled Construction End July 31, 2026
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/1047-25-3902
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Project remodels 3,600 GSF of currently underutilized space in Bidgood Hall just off the Quad to meet very specific College needs. The main (central) space would become a welcome center for prospective students and their families; adjacent to this space would be a dedicated room for recruitment meetings with prospective students and their families. Currently, these meetings are conducted on the third floor of Bidgood Hall in a classroom. Navigating to the current space requires families to traverse through several floors of older less-than-ideal spaces, and some families get lost. The Project would create a much more welcoming space and enhance the prospective student and family experience and introduction to Culverhouse and UA.

On the other side of the central welcome center would be a room dedicated to the College’s professional development program, LEAD. LEAD is required for all of the College’s nearly 10,000 undergraduate students, and a significant component of LEAD is professional coaching sessions. This would be dedicated space for coaching and would replace the teaching classrooms the College now must use.

The Project would receive the standard UA finishes and address all necessary deferred maintenance items in the area of the renovation.

Renderings
Budget 1575000
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage