Farrah Hall Renovation

  • 513 University Boulevard
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Bid

College or Division

General Campus

CA Filing Code

054-25-4056

Project GSF

62,954

Bid Date

February 19, 2026 (Demo/Abatement); April 28, 2026 (Building Renovation)

Construction Start

May 2026

Construction End

August 2027

Project Architect

Charles Williams and Associates, Inc.

General Contractor

J. T. Harrison Construction

Project Manager

Jeremy Wood

Field Coordinator

Colby Mixon

Project Admin

Haley Tubbs

Project Summary

The proposed Farrah Hall Renovation project (“Project”), located at 513 University Boulevard, includes a complete interior and selective exterior renovation of the nearly 63,000 gross square feet (“GSF”) building. The completed Project will serve the University as a centrally located general academic space.

Farrah Hall was originally constructed in 1927, with additions in 1948 and 1963. The building has remained relatively unchanged since 1963. The Project will allow for a comprehensive interior renovation and will fully address all deferred maintenance liabilities including new mechanical, electrical, accessibility, life safety systems, technology, and building envelope as necessary.

The existing character, detailing and quality of the building is appropriate and much in keeping with the adjacent campus facilities. The building features standard University materials, including brick and solid limestone columns, cornice and window surrounds which have been a part of the University Boulevard streetscape for almost a century.

The Project will allow for better utilization of academic space, benefiting departments and colleges with the primary occupant being the School of Leadership and Policy.

ADA access to Farrah Hall will be improved through the construction of a new elevator which will service all four floors, whereas the building currently requires the use of two elevators located in different areas of the building to access all floors.

The Project will allow for the conversion of the stack space to general use, and the floors will be aligned with the main building floors.  The realignment will not impact the University Boulevard elevation.

To meet the requested Fall 2027 occupancy date, construction is expected to take place in two phases including Construction Package A – Building Renovation and Construction Package B – Demolition/Abatement and will include Owner Furnished Contractor Installed Equipment provided as necessary to meet the Project schedule.


Information at a Glance

BOT Budget

$28,624,500

Funding Sources

  • Institutional Reserves :
    $28,624,500

Banner/Project #

91329

Project Accountant

Kimberly Lee

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division General Campus
Status Active
Construction Phase Bid
Construction Type Renovation
GSF 62,954
Street Address 513 University Boulevard
Zone
Project Number 054-25-4056
Architect Charles Williams and Associates, Inc.
Project Manager Jeremy Wood
Project Admin Haley Tubbs
Field Coordinator Colby Mixon
General Contractor J. T. Harrison Construction
Interior Designer
Bid Date February 19, 2026 (Demo/Abatement); April 28, 2026 (Building Renovation)
Construction Start May 2026
Scheduled Construction End August 2027
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/054-25-4056
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91329
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed Farrah Hall Renovation project (“Project”), located at 513 University Boulevard, includes a complete interior and selective exterior renovation of the nearly 63,000 gross square feet (“GSF”) building. The completed Project will serve the University as a centrally located general academic space.

Farrah Hall was originally constructed in 1927, with additions in 1948 and 1963. The building has remained relatively unchanged since 1963. The Project will allow for a comprehensive interior renovation and will fully address all deferred maintenance liabilities including new mechanical, electrical, accessibility, life safety systems, technology, and building envelope as necessary.

The existing character, detailing and quality of the building is appropriate and much in keeping with the adjacent campus facilities. The building features standard University materials, including brick and solid limestone columns, cornice and window surrounds which have been a part of the University Boulevard streetscape for almost a century.

The Project will allow for better utilization of academic space, benefiting departments and colleges with the primary occupant being the School of Leadership and Policy.

ADA access to Farrah Hall will be improved through the construction of a new elevator which will service all four floors, whereas the building currently requires the use of two elevators located in different areas of the building to access all floors.

The Project will allow for the conversion of the stack space to general use, and the floors will be aligned with the main building floors.  The realignment will not impact the University Boulevard elevation.

To meet the requested Fall 2027 occupancy date, construction is expected to take place in two phases including Construction Package A – Building Renovation and Construction Package B – Demolition/Abatement and will include Owner Furnished Contractor Installed Equipment provided as necessary to meet the Project schedule.

Renderings
Budget 28624500
Banner Fund Number 91329
Project Accountant Kimberly Lee
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage