Farrah Hall Renovation
- 513 University Boulevard
Use
Academic
Status
Active
Construction Type
Renovation
Current Phase
Bid
College or Division
General Campus
CA Filing Code
054-25-4056
Project GSF
62,954
Bid Date
February 19, 2026 (Demo/Abatement); April 28, 2026 (Building Renovation)
Construction Start
May 2026
Construction End
August 2027
Project Architect
Charles Williams and Associates, Inc.
General Contractor
J. T. Harrison Construction
Project Manager
Jeremy Wood
Field Coordinator
Colby Mixon
Project Admin
Haley Tubbs
The proposed Farrah Hall Renovation project (“Project”), located at 513 University Boulevard, includes a complete interior and selective exterior renovation of the nearly 63,000 gross square feet (“GSF”) building. The completed Project will serve the University as a centrally located general academic space.
Farrah Hall was originally constructed in 1927, with additions in 1948 and 1963. The building has remained relatively unchanged since 1963. The Project will allow for a comprehensive interior renovation and will fully address all deferred maintenance liabilities including new mechanical, electrical, accessibility, life safety systems, technology, and building envelope as necessary.
The existing character, detailing and quality of the building is appropriate and much in keeping with the adjacent campus facilities. The building features standard University materials, including brick and solid limestone columns, cornice and window surrounds which have been a part of the University Boulevard streetscape for almost a century.
The Project will allow for better utilization of academic space, benefiting departments and colleges with the primary occupant being the School of Leadership and Policy.
ADA access to Farrah Hall will be improved through the construction of a new elevator which will service all four floors, whereas the building currently requires the use of two elevators located in different areas of the building to access all floors.
The Project will allow for the conversion of the stack space to general use, and the floors will be aligned with the main building floors. The realignment will not impact the University Boulevard elevation.
To meet the requested Fall 2027 occupancy date, construction is expected to take place in two phases including Construction Package A – Building Renovation and Construction Package B – Demolition/Abatement and will include Owner Furnished Contractor Installed Equipment provided as necessary to meet the Project schedule.
BOT Budget
$28,624,500
Funding Sources
-
Institutional Reserves :
$28,624,500
Banner/Project #
91329
Project Accountant
Kimberly Lee
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Academic |
| College/Division | General Campus |
| Status | Active |
| Construction Phase | Bid |
| Construction Type | Renovation |
| GSF | 62,954 |
| Street Address | 513 University Boulevard |
| Zone | |
| Project Number | 054-25-4056 |
| Architect | Charles Williams and Associates, Inc. |
| Project Manager | Jeremy Wood |
| Project Admin | Haley Tubbs |
| Field Coordinator | Colby Mixon |
| General Contractor | J. T. Harrison Construction |
| Interior Designer | |
| Bid Date | February 19, 2026 (Demo/Abatement); April 28, 2026 (Building Renovation) |
| Construction Start | May 2026 |
| Scheduled Construction End | August 2027 |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/054-25-4056 |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91329 |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The proposed Farrah Hall Renovation project (“Project”), located at 513 University Boulevard, includes a complete interior and selective exterior renovation of the nearly 63,000 gross square feet (“GSF”) building. The completed Project will serve the University as a centrally located general academic space. Farrah Hall was originally constructed in 1927, with additions in 1948 and 1963. The building has remained relatively unchanged since 1963. The Project will allow for a comprehensive interior renovation and will fully address all deferred maintenance liabilities including new mechanical, electrical, accessibility, life safety systems, technology, and building envelope as necessary. The existing character, detailing and quality of the building is appropriate and much in keeping with the adjacent campus facilities. The building features standard University materials, including brick and solid limestone columns, cornice and window surrounds which have been a part of the University Boulevard streetscape for almost a century. The Project will allow for better utilization of academic space, benefiting departments and colleges with the primary occupant being the School of Leadership and Policy. ADA access to Farrah Hall will be improved through the construction of a new elevator which will service all four floors, whereas the building currently requires the use of two elevators located in different areas of the building to access all floors. The Project will allow for the conversion of the stack space to general use, and the floors will be aligned with the main building floors. The realignment will not impact the University Boulevard elevation. To meet the requested Fall 2027 occupancy date, construction is expected to take place in two phases including Construction Package A – Building Renovation and Construction Package B – Demolition/Abatement and will include Owner Furnished Contractor Installed Equipment provided as necessary to meet the Project schedule. |
| Renderings | |
| Budget | 28624500 |
| Banner Fund Number | 91329 |
| Project Accountant | Kimberly Lee |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |