SR-215 (15th Street) and 2nd Avenue Intersection Improvements

  • SR-215 (15th Street) and 2nd Avenue Intersection and 2nd Avenue from 14th Street to 15th Street
Information at a Glance

Use

Road

Status

Active

Construction Type

New Construction

Current Phase

Design

College or Division

Other

CA Filing Code

TRN-24-3583

Project GSF

N/A

Bid Date

February 13, 2024

Construction Start

April 2024

Construction End

August 2024

Project Architect

McGiffert and Associates, LLC

General Contractor

John Plott Company (Construction B)

Project Manager

David Welch

Field Coordinator

TBD

Project Admin

Emily Lay

Project Summary

The SR-215 (15th Street) and 2nd Avenue Intersection Improvements Project (“Project”) will improve the traffic flow to the southern entrance to campus via the 2nd Avenue Overpass by widening the existing 2 lane roadway on 2nd Avenue to include turn lanes, new sidewalks and enhanced landscaping. The Project will also include a section of work to enhance the intersection of SR-215 (15th Street) and 2nd Avenue to include new decorative traffic signal poles to match the UA Standard, longer queues for the turning lane from SR-215 heading north on 2nd Avenue, and appropriate signage and wayfinding.

The SR-215 (15th Street) and 2nd Avenue Intersection Improvements Project will include the previously deferred widening of 2nd Avenue from the intersection of SR-215 (15th Street) north to 14th Street, at the southern terminus of the Overpass. The Project will also include improvements along SR-215 (15th Street) consisting of dedicated and extended turn lanes. University standard decorative traffic signal poles and signals will be installed at the intersection, and new decorative light poles and fixtures will be installed along 2nd Avenue to enhance safety for pedestrians utilizing the 2nd Ave Overpass to access the University of Alabama campus.

This project will greatly enhance event traffic flow to and from the Coleman Coliseum and the Capstone Parking Deck. The project will also support the core master plan principle of keeping traffic and parking to the perimeter of campus so as to minimize pedestrian/vehicular conflicts.


Information at a Glance

BOT Budget

$6,448,799.00

Funding Sources

  • University Central Reserves :
    $6,448,799

Banner/Project #

91250

Project Accountant

Kimberly Lee

DATA LABEL DATA VALUE
Category Road
College/Division Other
Status Active
Construction Phase Design
Construction Type New Construction
GSF N/A
Street Address SR-215 (15th Street) and 2nd Avenue Intersection and 2nd Avenue from 14th Street to 15th Street
Zone
Project Number TRN-24-3583
Architect McGiffert and Associates, LLC
Project Manager David Welch
Project Admin Emily Lay
Field Coordinator TBD
General Contractor John Plott Company (Construction B)
Interior Designer
Bid Date February 13, 2024
Construction Start April 2024
Scheduled Construction End August 2024
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/TRN-24-3583
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91250
Campus Map Link https://map.concept3d.com/?id=1222#!m/584099
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The SR-215 (15th Street) and 2nd Avenue Intersection Improvements Project (“Project”) will improve the traffic flow to the southern entrance to campus via the 2nd Avenue Overpass by widening the existing 2 lane roadway on 2nd Avenue to include turn lanes, new sidewalks and enhanced landscaping. The Project will also include a section of work to enhance the intersection of SR-215 (15th Street) and 2nd Avenue to include new decorative traffic signal poles to match the UA Standard, longer queues for the turning lane from SR-215 heading north on 2nd Avenue, and appropriate signage and wayfinding.

The SR-215 (15th Street) and 2nd Avenue Intersection Improvements Project will include the previously deferred widening of 2nd Avenue from the intersection of SR-215 (15th Street) north to 14th Street, at the southern terminus of the Overpass. The Project will also include improvements along SR-215 (15th Street) consisting of dedicated and extended turn lanes. University standard decorative traffic signal poles and signals will be installed at the intersection, and new decorative light poles and fixtures will be installed along 2nd Avenue to enhance safety for pedestrians utilizing the 2nd Ave Overpass to access the University of Alabama campus.

This project will greatly enhance event traffic flow to and from the Coleman Coliseum and the Capstone Parking Deck. The project will also support the core master plan principle of keeping traffic and parking to the perimeter of campus so as to minimize pedestrian/vehicular conflicts.

Renderings
Budget 6448799
Banner Fund Number 91250
Project Accountant Kimberly Lee
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage