University Early Childhood Development and Education Center

  • 1300 21st St East, Tuscaloosa, AL 35404
Information at a Glance

Use

Other

Status

Active

Construction Type

Renovation

Current Phase

Construction

College or Division

College of Arts and Sciences

CA Filing Code

495-23-3456

Project GSF

35,247

Bid Date

December 2023

Construction Start

Spring 2024

Construction End

May 2024

Project Architect

CCR Architecture and Interiors

General Contractor

J. T. Harrison Construction Co. - Interior; Standard Roofing of Montgomery - Roof

Project Manager

Leila Ahmady

Project Admin

Katherine Crocker-Buta

Project Summary

The University Childcare Center project, located at 1300 21st Street East, will address childcare needs for UA’s faculty, staff and students. The project will renovate approximately 23,747 gross square feet of the former Northington Elementary School to create childcare space, childcare support space, office and administrative space, as well as outdoor recreation and playground spaces. The renovated facility will accommodate 250 infants, toddlers, and children.

In addition, 11,500 gross square feet of the existing adjacent Gymnasium will be renovated to include a space for indoor play as well as provide the opportunity for the University to expand its offerings for potential summer camps and after-school care.

The Project will be constructed to accreditor standards and will be licensed through the Alabama Department of Human Resources Child Care Services Division, Office of Child Care Licensing.

The entire building will receive upgraded HVAC, plumbing and Life Safety Systems. The HVAC system within the Childcare Center will specifically have upgraded Indoor Air Quality requirements and infection prevention.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges.

The existing surface parking lot will be reconfigured to accommodate parking and safe dropoff and pick-up vehicular circulation as well as provide access to the gymnasium to accommodate potential service offering expansions. The Project will eliminate approximately $9,000,000 in campus deferred maintenance liabilities.


Information at a Glance

BOT Budget

$10,600,000

Funding Sources

  • University Central Reserves :
    $10,600,000

Banner/Project #

91238

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division College of Arts and Sciences
Status Active
Construction Phase Construction
Construction Type Renovation
GSF 35,247
Street Address 1300 21st St East, Tuscaloosa, AL 35404
Zone
Project Number 495-23-3456
Architect CCR Architecture and Interiors
Project Manager Leila Ahmady
Project Admin Katherine Crocker-Buta
Field Coordinator
General Contractor J. T. Harrison Construction Co. - Interior; Standard Roofing of Montgomery - Roof
Interior Designer
Bid Date December 2023
Construction Start Spring 2024
Scheduled Construction End May 2024
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/495-23-3456
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91238
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The University Childcare Center project, located at 1300 21st Street East, will address childcare needs for UA’s faculty, staff and students. The project will renovate approximately 23,747 gross square feet of the former Northington Elementary School to create childcare space, childcare support space, office and administrative space, as well as outdoor recreation and playground spaces. The renovated facility will accommodate 250 infants, toddlers, and children.

In addition, 11,500 gross square feet of the existing adjacent Gymnasium will be renovated to include a space for indoor play as well as provide the opportunity for the University to expand its offerings for potential summer camps and after-school care.

The Project will be constructed to accreditor standards and will be licensed through the Alabama Department of Human Resources Child Care Services Division, Office of Child Care Licensing.

The entire building will receive upgraded HVAC, plumbing and Life Safety Systems. The HVAC system within the Childcare Center will specifically have upgraded Indoor Air Quality requirements and infection prevention.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges.

The existing surface parking lot will be reconfigured to accommodate parking and safe dropoff and pick-up vehicular circulation as well as provide access to the gymnasium to accommodate potential service offering expansions. The Project will eliminate approximately $9,000,000 in campus deferred maintenance liabilities.

Renderings
Budget 10600000
Banner Fund Number 91238
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage