University Early Childhood Development and Education Center
- 1300 21st St East, Tuscaloosa, AL 35404
Use
Other
Status
Construction Type
Renovation
Current Phase
Construction
College or Division
College of Arts and Sciences
CA Filing Code
495-23-3456
Project GSF
35,247
Bid Date
December 2023
Construction Start
Spring 2024
Construction End
May 2024
Project Architect
CCR Architecture and Interiors
General Contractor
J. T. Harrison Construction Co. - Interior; Standard Roofing of Montgomery - Roof
Project Manager
Leila Ahmady
Project Admin
Katherine Crocker-Buta
The University Childcare Center project, located at 1300 21st Street East, will address childcare needs for UA’s faculty, staff and students. The project will renovate approximately 23,747 gross square feet of the former Northington Elementary School to create childcare space, childcare support space, office and administrative space, as well as outdoor recreation and playground spaces. The renovated facility will accommodate 250 infants, toddlers, and children.
In addition, 11,500 gross square feet of the existing adjacent Gymnasium will be renovated to include a space for indoor play as well as provide the opportunity for the University to expand its offerings for potential summer camps and after-school care.
The Project will be constructed to accreditor standards and will be licensed through the Alabama Department of Human Resources Child Care Services Division, Office of Child Care Licensing.
The entire building will receive upgraded HVAC, plumbing and Life Safety Systems. The HVAC system within the Childcare Center will specifically have upgraded Indoor Air Quality requirements and infection prevention.
Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges.
The existing surface parking lot will be reconfigured to accommodate parking and safe dropoff and pick-up vehicular circulation as well as provide access to the gymnasium to accommodate potential service offering expansions. The Project will eliminate approximately $9,000,000 in campus deferred maintenance liabilities.
BOT Budget
$10,600,000
Funding Sources
-
University Central Reserves :
$10,600,000
Banner/Project #
91238
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | College of Arts and Sciences |
Status | Active |
Construction Phase | Construction |
Construction Type | Renovation |
GSF | 35,247 |
Street Address | 1300 21st St East, Tuscaloosa, AL 35404 |
Zone | |
Project Number | 495-23-3456 |
Architect | CCR Architecture and Interiors |
Project Manager | Leila Ahmady |
Project Admin | Katherine Crocker-Buta |
Field Coordinator | |
General Contractor | J. T. Harrison Construction Co. - Interior; Standard Roofing of Montgomery - Roof |
Interior Designer | |
Bid Date | December 2023 |
Construction Start | Spring 2024 |
Scheduled Construction End | May 2024 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/495-23-3456 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91238 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The University Childcare Center project, located at 1300 21st Street East, will address childcare needs for UA’s faculty, staff and students. The project will renovate approximately 23,747 gross square feet of the former Northington Elementary School to create childcare space, childcare support space, office and administrative space, as well as outdoor recreation and playground spaces. The renovated facility will accommodate 250 infants, toddlers, and children. In addition, 11,500 gross square feet of the existing adjacent Gymnasium will be renovated to include a space for indoor play as well as provide the opportunity for the University to expand its offerings for potential summer camps and after-school care. The Project will be constructed to accreditor standards and will be licensed through the Alabama Department of Human Resources Child Care Services Division, Office of Child Care Licensing. The entire building will receive upgraded HVAC, plumbing and Life Safety Systems. The HVAC system within the Childcare Center will specifically have upgraded Indoor Air Quality requirements and infection prevention. Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The existing surface parking lot will be reconfigured to accommodate parking and safe dropoff and pick-up vehicular circulation as well as provide access to the gymnasium to accommodate potential service offering expansions. The Project will eliminate approximately $9,000,000 in campus deferred maintenance liabilities. |
Renderings | |
Budget | 10600000 |
Banner Fund Number | 91238 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |