University Medical Center – Northport Clinic
Use
Other
Status
Construction Type
New Construction
Current Phase
Complete
College or Division
Other
CA Filing Code
820-21-2643
Project GSF
15,000
Bid Date
December 2021
Construction Start
February 15, 2022
Construction End
November 2022
COSC Date
' September 19, 2022
Project Architect
Lucy Design Associates, Inc.
General Contractor
WAR Construction, Inc.
Project Manager
Joshua Bollinger
Field Coordinator
Joe Daidone
Project Admin
Cassidy Largin
The University Medical Center-Northport Clinic, a primary care medical center, project (“Project”) involves construction of a 1-story, 15,000 square foot (sf) facility on the 11.6 acre property recently purchased by the University from the 1871 L.L.C. The facility will provide the Northport, Tuscaloosa and other west Alabama communities with family and internal medicine, OBGYN, neurology and behavioral health services. The space will also be utilized to support the current operations and future growth of The University of Alabama (“University”) family medicine residency program as well as other medical education programs.
The proposed Project will provide 19 examination rooms; two (2) nursing stations; two (2) large procedure rooms; an isolation room, restrooms for patients and staff, treatment rooms, doctor’s offices, a break room, and conference rooms. The entry lobby will seat 52 with a small wellchild waiting area for eight (8). The lobby will also include a large check-in desk with adjacent work area and two (2) separate check-out areas. Additionally, the clinic will feature a separate surge/off hours clinic with a separate entry and waiting area and three (3) examination rooms.
View Progress Photos!BOT Budget
$7,000,000.00
Funding Sources
-
Capstone Health Services Foundation :
$2,000,000 -
University Central Reserves :
$4,253,645 -
CCHS College Support Fund :
$746,355
Banner/Project #
90945
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
November 23, 2021
University Medical Center - Northport Sitework and Utility -
December 22, 2021
University Medical Center - Building Package
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Other |
Status | Closed |
Construction Phase | Complete |
Construction Type | New Construction |
GSF | 15,000 |
Street Address | |
Zone | |
Project Number | 820-21-2643 |
Architect | Lucy Design Associates, Inc. |
Project Manager | Joshua Bollinger |
Project Admin | Cassidy Largin |
Field Coordinator | Joe Daidone |
General Contractor | WAR Construction, Inc. |
Interior Designer | |
Bid Date | December 2021 |
Construction Start | February 15, 2022 |
Scheduled Construction End | November 2022 |
COSC Date | September 19, 2022 |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/820-21-2643 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90945 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The University Medical Center-Northport Clinic, a primary care medical center, project (“Project”) involves construction of a 1-story, 15,000 square foot (sf) facility on the 11.6 acre property recently purchased by the University from the 1871 L.L.C. The facility will provide the Northport, Tuscaloosa and other west Alabama communities with family and internal medicine, OBGYN, neurology and behavioral health services. The space will also be utilized to support the current operations and future growth of The University of Alabama (“University”) family medicine residency program as well as other medical education programs. The proposed Project will provide 19 examination rooms; two (2) nursing stations; two (2) large procedure rooms; an isolation room, restrooms for patients and staff, treatment rooms, doctor’s offices, a break room, and conference rooms. The entry lobby will seat 52 with a small wellchild waiting area for eight (8). The lobby will also include a large check-in desk with adjacent work area and two (2) separate check-out areas. Additionally, the clinic will feature a separate surge/off hours clinic with a separate entry and waiting area and three (3) examination rooms. View Progress Photos! |
Renderings | |
Budget | 7000000 |
Banner Fund Number | 90945 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=8FCAE8EC-4BA3-45E4-91EF-73A5C2A36C61 |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |