University Medical Center – Northport Clinic

Information at a Glance

Use

Other

Status

Closed

Construction Type

New Construction

Current Phase

Complete

College or Division

Other

CA Filing Code

820-21-2643

Project GSF

15,000

Bid Date

December 2021

Construction Start

February 15, 2022

Construction End

November 2022

COSC Date

' September 19, 2022

Project Architect

Lucy Design Associates, Inc.

General Contractor

WAR Construction, Inc.

Project Manager

Joshua Bollinger

Field Coordinator

Joe Daidone

Project Admin

Cassidy Largin

Project Summary

The University Medical Center-Northport Clinic, a primary care medical center, project (“Project”) involves construction of a 1-story, 15,000 square foot (sf) facility on the 11.6 acre property recently purchased by the University from the 1871 L.L.C. The facility will provide the Northport, Tuscaloosa and other west Alabama communities with family and internal medicine, OBGYN, neurology and behavioral health services. The space will also be utilized to support the current operations and future growth of The University of Alabama (“University”) family medicine residency program as well as other medical education programs.

The proposed Project will provide 19 examination rooms; two (2) nursing stations; two (2) large procedure rooms; an isolation room, restrooms for patients and staff, treatment rooms, doctor’s offices, a break room, and conference rooms. The entry lobby will seat 52 with a small wellchild waiting area for eight (8). The lobby will also include a large check-in desk with adjacent work area and two (2) separate check-out areas. Additionally, the clinic will feature a separate surge/off hours clinic with a separate entry and waiting area and three (3) examination rooms.

View Progress Photos!
Information at a Glance

BOT Budget

$7,000,000.00

Funding Sources

  • Capstone Health Services Foundation :
    $2,000,000
  • University Central Reserves :
    $4,253,645
  • CCHS College Support Fund :
    $746,355

Banner/Project #

90945

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Other
Status Closed
Construction Phase Complete
Construction Type New Construction
GSF 15,000
Street Address
Zone
Project Number 820-21-2643
Architect Lucy Design Associates, Inc.
Project Manager Joshua Bollinger
Project Admin Cassidy Largin
Field Coordinator Joe Daidone
General Contractor WAR Construction, Inc.
Interior Designer
Bid Date December 2021
Construction Start February 15, 2022
Scheduled Construction End November 2022
COSC Date September 19, 2022
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/820-21-2643
AiM Link https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90945
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The University Medical Center-Northport Clinic, a primary care medical center, project (“Project”) involves construction of a 1-story, 15,000 square foot (sf) facility on the 11.6 acre property recently purchased by the University from the 1871 L.L.C. The facility will provide the Northport, Tuscaloosa and other west Alabama communities with family and internal medicine, OBGYN, neurology and behavioral health services. The space will also be utilized to support the current operations and future growth of The University of Alabama (“University”) family medicine residency program as well as other medical education programs.

The proposed Project will provide 19 examination rooms; two (2) nursing stations; two (2) large procedure rooms; an isolation room, restrooms for patients and staff, treatment rooms, doctor’s offices, a break room, and conference rooms. The entry lobby will seat 52 with a small wellchild waiting area for eight (8). The lobby will also include a large check-in desk with adjacent work area and two (2) separate check-out areas. Additionally, the clinic will feature a separate surge/off hours clinic with a separate entry and waiting area and three (3) examination rooms.

View Progress Photos!
Renderings
Budget 7000000
Banner Fund Number 90945
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=8FCAE8EC-4BA3-45E4-91EF-73A5C2A36C61
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage