University Hall Addition

  • 275 Kilgore Lane
Information at a Glance

Use

Academic

Status

Closed

Construction Type

Addition

Current Phase

Complete

College or Division

College of Continuing Studies

CA Filing Code

420-20-2434

Project GSF

15,067

Bid Date

February 18, 2022

Construction Start

April 11, 2022

Construction End

July 2023

Project Architect

Williams Blackstock Architects

General Contractor

WAR Construction, Inc.

Project Manager

Suzanne Webster

Field Coordinator

Chuck Hinton

Project Admin

Haley Tubbs

Project Summary

The project will consist of a three-story addition to University Hall aligned with the South façade of the existing building containing approximately 15,067 gross square feet.  The addition will tie into the existing building for egress and many core functions, with the intent to provide a modern fit-out character to support an educational environment.  The addition will respect the historical character of the original 1938 three-story building and its single story annex, while enforcing and extending the character and image of The University of Alabama on the former Bryce campus.   The project will allow the College of Continuing Studies to relocate SafeState’s staff and training programs to the First and Second Floors.  The third floor will be occupied by Financial Services, Human Resources, Registration Services and an Administrative Support Staff Member for the University Faculty Senate, which will bring all members of the College of Continuing Studies College Relations group into the Dean’s Office suite.

 

View Progress Photos!
Information at a Glance

BOT Budget

$8,046,773

Funding Sources

  • College of Continuing Studies Reserves :
    $4,000,000
  • University Central Reserves :
    $4,046,773

Banner/Project #

98580

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division College of Continuing Studies
Status Closed
Construction Phase Complete
Construction Type Addition
GSF 15,067
Street Address 275 Kilgore Lane
Zone 3
Project Number 420-20-2434
Architect Williams Blackstock Architects
Project Manager Suzanne Webster
Project Admin Haley Tubbs
Field Coordinator Chuck Hinton
General Contractor WAR Construction, Inc.
Interior Designer
Bid Date February 18, 2022
Construction Start April 11, 2022
Scheduled Construction End July 2023
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/420-20-2434
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98580
Campus Map Link https://map.concept3d.com/?id=1222#!m/576639
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The project will consist of a three-story addition to University Hall aligned with the South façade of the existing building containing approximately 15,067 gross square feet.  The addition will tie into the existing building for egress and many core functions, with the intent to provide a modern fit-out character to support an educational environment.  The addition will respect the historical character of the original 1938 three-story building and its single story annex, while enforcing and extending the character and image of The University of Alabama on the former Bryce campus.   The project will allow the College of Continuing Studies to relocate SafeState’s staff and training programs to the First and Second Floors.  The third floor will be occupied by Financial Services, Human Resources, Registration Services and an Administrative Support Staff Member for the University Faculty Senate, which will bring all members of the College of Continuing Studies College Relations group into the Dean’s Office suite.

 

View Progress Photos!
Renderings
Budget 8046773
Banner Fund Number 98580
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=98580&detail=available
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=98176205-133B-418D-8FB5-DB40D5B2D81A
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage