University Hall Addition
- 275 Kilgore Lane
Use
Academic
Status
Construction Type
Addition
Current Phase
Complete
College or Division
College of Continuing Studies
CA Filing Code
420-20-2434
Project GSF
15,067
Bid Date
February 18, 2022
Construction Start
April 11, 2022
Construction End
July 2023
Project Architect
Williams Blackstock Architects
General Contractor
WAR Construction, Inc.
Project Manager
Suzanne Webster
Field Coordinator
Chuck Hinton
Project Admin
Haley Tubbs
The project will consist of a three-story addition to University Hall aligned with the South façade of the existing building containing approximately 15,067 gross square feet. The addition will tie into the existing building for egress and many core functions, with the intent to provide a modern fit-out character to support an educational environment. The addition will respect the historical character of the original 1938 three-story building and its single story annex, while enforcing and extending the character and image of The University of Alabama on the former Bryce campus. The project will allow the College of Continuing Studies to relocate SafeState’s staff and training programs to the First and Second Floors. The third floor will be occupied by Financial Services, Human Resources, Registration Services and an Administrative Support Staff Member for the University Faculty Senate, which will bring all members of the College of Continuing Studies College Relations group into the Dean’s Office suite.
View Progress Photos!
BOT Budget
$8,046,773
Funding Sources
-
College of Continuing Studies Reserves :
$4,000,000 -
University Central Reserves :
$4,046,773
Banner/Project #
98580
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | College of Continuing Studies |
Status | Closed |
Construction Phase | Complete |
Construction Type | Addition |
GSF | 15,067 |
Street Address | 275 Kilgore Lane |
Zone | 3 |
Project Number | 420-20-2434 |
Architect | Williams Blackstock Architects |
Project Manager | Suzanne Webster |
Project Admin | Haley Tubbs |
Field Coordinator | Chuck Hinton |
General Contractor | WAR Construction, Inc. |
Interior Designer | |
Bid Date | February 18, 2022 |
Construction Start | April 11, 2022 |
Scheduled Construction End | July 2023 |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/420-20-2434 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98580 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/576639 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The project will consist of a three-story addition to University Hall aligned with the South façade of the existing building containing approximately 15,067 gross square feet. The addition will tie into the existing building for egress and many core functions, with the intent to provide a modern fit-out character to support an educational environment. The addition will respect the historical character of the original 1938 three-story building and its single story annex, while enforcing and extending the character and image of The University of Alabama on the former Bryce campus. The project will allow the College of Continuing Studies to relocate SafeState’s staff and training programs to the First and Second Floors. The third floor will be occupied by Financial Services, Human Resources, Registration Services and an Administrative Support Staff Member for the University Faculty Senate, which will bring all members of the College of Continuing Studies College Relations group into the Dean’s Office suite. View Progress Photos! |
Renderings | |
Budget | 8046773 |
Banner Fund Number | 98580 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=98580&detail=available |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=98176205-133B-418D-8FB5-DB40D5B2D81A |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |