University Boulevard Drive-Through Retail

  • 225 University Boulevard East
Information at a Glance

Use

Other

Status

Active

Construction Type

New Construction

Current Phase

Programming

College or Division

Other

Project GSF

1,000

Bid Date

September 2022

Project Architect

TBD

General Contractor

TBD

Project Manager

Brittany Kyles

Field Coordinator

Colby Mixon

Project Admin

Sarah Crocker-Buta

Project Summary

The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community.

This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order via Starbucks mobile ordering app. There is no interior café.

The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue.

The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area.


Information at a Glance

BOT Budget

$2,500,000.00

Funding Sources

  • Food Services Operations:
    $2,500,000
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Other
Status Active
Construction Phase Programming
Construction Type New Construction
GSF 1,000
Street Address 225 University Boulevard East
Zone
Project Number
Architect TBD
Project Manager Brittany Kyles
Project Admin Sarah Crocker-Buta
Field Coordinator Colby Mixon
General Contractor TBD
Interior Designer
Bid Date September 2022
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link https://map.concept3d.com/?id=1222#!m/607966
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community.

This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order via Starbucks mobile ordering app. There is no interior café.

The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue.

The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area.

Renderings Array
Budget 2500000
Banner Fund Number
Project Accountant
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code