Science and Engineering Complex Renovation for Chemical and Biological Engineering
- 300 Hackberry Lane
Use
Academic
Status
Active
Construction Type
Renovation
Current Phase
Design
College or Division
Barefield College of Arts and Sciences
CA Filing Code
254-25-4096
Project GSF
12,981
Bid Date
TBD
Construction Start
TBD
Construction End
TBD
Project Architect
Davis Architects
Project Manager
Jessie Green
Project Admin
Allie Largin
The Science and Engineering Complex Renovation for Chemical and Biological Engineering project will enhance research capabilities by upgrading laboratory spaces, supporting institutional STEM initiatives, and improving facilities for research staff. The renovated areas will also serve as a central hub for Chemical and Biological Engineering on campus, providing space to store research materials and supporting a wide range of academic activities.
Located on the 3rd floor of the Science and Engineering Complex, the project will reconfigure multiple areas to meet departmental needs while allowing for future growth and adaptability. Existing computational offices and laboratories will be transformed into state-of-the-art wet laboratories, enabling advanced research and development in Chemical and Biological Engineering.
In addition to improving research functionality, the renovation is expected to strengthen faculty recruitment and retention, increase the effective use of academic space, and support the University’s long-term STEM mission. The project will include all necessary mechanical, electrical, plumbing, and life-safety upgrades required to fully support the enhanced laboratory environment.
BOT Budget
$6,000,000
Funding Sources
-
ETF A&T Appropriations Act#2025-269/SB114 :
$6,000,000
Banner/Project #
91333
Project Accountant
Parker Christian
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Academic |
| College/Division | Barefield College of Arts and Sciences |
| Status | Active |
| Construction Phase | Design |
| Construction Type | Renovation |
| Street Address | 300 Hackberry Lane |
| Zone | |
| GSF | 12,981 |
| Project Number | 254-25-4096 |
| Architect | Davis Architects |
| General Contractor | |
| Project Manager | Jessie Green |
| Project Admin | Allie Largin |
| Field Coordinator | |
| Interior Designer | |
| Bid Date | TBD |
| Construction Start | TBD |
| Scheduled Construction End | TBD |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/4263M/254-25-4096 |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91333 |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The Science and Engineering Complex Renovation for Chemical and Biological Engineering project will enhance research capabilities by upgrading laboratory spaces, supporting institutional STEM initiatives, and improving facilities for research staff. The renovated areas will also serve as a central hub for Chemical and Biological Engineering on campus, providing space to store research materials and supporting a wide range of academic activities. Located on the 3rd floor of the Science and Engineering Complex, the project will reconfigure multiple areas to meet departmental needs while allowing for future growth and adaptability. Existing computational offices and laboratories will be transformed into state-of-the-art wet laboratories, enabling advanced research and development in Chemical and Biological Engineering. In addition to improving research functionality, the renovation is expected to strengthen faculty recruitment and retention, increase the effective use of academic space, and support the University’s long-term STEM mission. The project will include all necessary mechanical, electrical, plumbing, and life-safety upgrades required to fully support the enhanced laboratory environment. |
| Renderings | |
| Budget | 6000000 |
| Banner Fund Number | 91333 |
| Project Accountant | Parker Christian |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |