Science and Engineering Complex Renovation for Chemical and Biological Engineering

  • 300 Hackberry Lane
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Design

College or Division

Barefield College of Arts and Sciences

CA Filing Code

254-25-4096

Project GSF

12,981

Bid Date

TBD

Construction Start

TBD

Construction End

TBD

Project Architect

Davis Architects

Project Manager

Jessie Green

Project Admin

Allie Largin

Project Summary

The Science and Engineering Complex Renovation for Chemical and Biological Engineering project will enhance research capabilities by upgrading laboratory spaces, supporting institutional STEM initiatives, and improving facilities for research staff. The renovated areas will also serve as a central hub for Chemical and Biological Engineering on campus, providing space to store research materials and supporting a wide range of academic activities.

Located on the 3rd floor of the Science and Engineering Complex, the project will reconfigure multiple areas to meet departmental needs while allowing for future growth and adaptability. Existing computational offices and laboratories will be transformed into state-of-the-art wet laboratories, enabling advanced research and development in Chemical and Biological Engineering.

In addition to improving research functionality, the renovation is expected to strengthen faculty recruitment and retention, increase the effective use of academic space, and support the University’s long-term STEM mission. The project will include all necessary mechanical, electrical, plumbing, and life-safety upgrades required to fully support the enhanced laboratory environment.


Information at a Glance

BOT Budget

$6,000,000

Funding Sources

  • ETF A&T Appropriations Act#2025-269/SB114 :
    $6,000,000

Banner/Project #

91333

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division Barefield College of Arts and Sciences
Status Active
Construction Phase Design
Construction Type Renovation
Street Address 300 Hackberry Lane
Zone
GSF 12,981
Project Number 254-25-4096
Architect Davis Architects
General Contractor
Project Manager Jessie Green
Project Admin Allie Largin
Field Coordinator
Interior Designer
Bid Date TBD
Construction Start TBD
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/4263M/254-25-4096
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91333
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Science and Engineering Complex Renovation for Chemical and Biological Engineering project will enhance research capabilities by upgrading laboratory spaces, supporting institutional STEM initiatives, and improving facilities for research staff. The renovated areas will also serve as a central hub for Chemical and Biological Engineering on campus, providing space to store research materials and supporting a wide range of academic activities.

Located on the 3rd floor of the Science and Engineering Complex, the project will reconfigure multiple areas to meet departmental needs while allowing for future growth and adaptability. Existing computational offices and laboratories will be transformed into state-of-the-art wet laboratories, enabling advanced research and development in Chemical and Biological Engineering.

In addition to improving research functionality, the renovation is expected to strengthen faculty recruitment and retention, increase the effective use of academic space, and support the University’s long-term STEM mission. The project will include all necessary mechanical, electrical, plumbing, and life-safety upgrades required to fully support the enhanced laboratory environment.

Renderings
Budget 6000000
Banner Fund Number 91333
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage