Smith Family Center for the Performing Arts

  • Peter Bryce Campus
Information at a Glance

Use

Academic

Status

Active

Construction Type

New Construction

Current Phase

Construction

College or Division

College of Arts and Sciences

CA Filing Code

432-15-599

Project GSF

130,088

Bid Date

April 30, 2024

Construction Start

August 2024

Construction End

2026

COSC Date

' TBD

Project Architect

TurnerBatson Architects

General Contractor

M.J. Harris Construction Services, LLC

Project Manager

Jackson Cross

Field Coordinator

Jon Chesnut

Interior Designer

TBD

Project Admin

Allie Price

Project Summary

The Smith Family Center for the Performing Arts will consist of the construction of an approximately 130,088 square foot performing arts center for the Department of Theatre and Dance. The Project will provide a multifunctioning, state-of-the-art venue for performances and infrastructure. This facility will allow the department to combine all performance and academic functions in a single area of campus.

The Project will provide a 350-seat drama theater, 450-seat dance theater, and a 250-seat studio theater that will address the Department’s growing needs and demands for performance space, seating capacity, and functionality. The building will also contain support spaces such as a scenery shop, various control rooms and rehearsal halls. In addition, faculty offices and classrooms will be relocated to the connected Peter Bryce Main building.

Prominently located on axis with the Bryce Central pavilion and the intersection of Randall Way and Peter Bryce Boulevard, the Project will provide a grand entry for performance events. The facility will also connect to the Bryce Main building via a new lobby. Connecting the old and new will provide two main entry and exit points for productions allowing for smooth transitions. Additionally, courtyards created between the buildings have the potential to be developed to serve as event support areas for outdoor venues and programming.

The relocation of the Department of Theatre and Dance will make the vacated space in the English Building and Rowand-Johnson Hall available for other pressing academic needs.

Space will also be provided for the Opera Department to relocate from Bryant-Jordan Hall so that facility can be decommissioned in accordance with the plan for the Peter Bryce Preserve.

 


Information at a Glance

BOT Budget

$177,002,282.00

Funding Sources

  • Future General Revenue Bonds :
    $121,000,000
  • Arts and Sciences Reserves and Future Gifts :
    $20,750,000
  • Gift (Realized through April 2024) :
    $25,136,927
  • University Central Reserves to be Repaid Through Current Pledges :
    $10,115,355

Banner/Project #

90686

Project Accountant

Parker Christian

DATA LABEL DATA VALUE
Category Academic
Status Active
Construction Phase Construction
Construction Type New Construction
GSF 130,088
Street Address Peter Bryce Campus
Zone
Project Number 432-15-599
Architect TurnerBatson Architects
Project Manager Jackson Cross
General Contractor M.J. Harris Construction Services, LLC
Bid Date April 30, 2024
Construction Start August 2024
Scheduled Construction End 2026
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/432-15-599
Campus Map Link https://map.concept3d.com/?id=1222#!m/676518
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Project Summary

The Smith Family Center for the Performing Arts will consist of the construction of an approximately 130,088 square foot performing arts center for the Department of Theatre and Dance. The Project will provide a multifunctioning, state-of-the-art venue for performances and infrastructure. This facility will allow the department to combine all performance and academic functions in a single area of campus.

The Project will provide a 350-seat drama theater, 450-seat dance theater, and a 250-seat studio theater that will address the Department’s growing needs and demands for performance space, seating capacity, and functionality. The building will also contain support spaces such as a scenery shop, various control rooms and rehearsal halls. In addition, faculty offices and classrooms will be relocated to the connected Peter Bryce Main building.

Prominently located on axis with the Bryce Central pavilion and the intersection of Randall Way and Peter Bryce Boulevard, the Project will provide a grand entry for performance events. The facility will also connect to the Bryce Main building via a new lobby. Connecting the old and new will provide two main entry and exit points for productions allowing for smooth transitions. Additionally, courtyards created between the buildings have the potential to be developed to serve as event support areas for outdoor venues and programming.

The relocation of the Department of Theatre and Dance will make the vacated space in the English Building and Rowand-Johnson Hall available for other pressing academic needs.

Space will also be provided for the Opera Department to relocate from Bryant-Jordan Hall so that facility can be decommissioned in accordance with the plan for the Peter Bryce Preserve.

 

Renderings
Budget 177002282
Banner Fund Number 90686
Project Accountant Parker Christian
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=DB86BEC5-9F45-44A5-ADEA-CF4450DDE19D
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90686&detail=all
View Bid Tab
BOT Stage I April 2014
BOT Stage II April 2015, April 2019
BOT Stage III November 2016
BOT Stage IV
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-211/
College/Division College of Arts and Sciences
Project Admin Allie Price
Field Coordinator Jon Chesnut
COSC Date TBD
Year End Inspection TBD
View Warranty Documents
Interior Designer TBD
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90686
Construction Photos Link
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Funding Source(s)
Fundraising Site https://www.ua.edu/performingarts/
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Closeout Documents Link
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage