New Alumni Hall
- 350 Campus Drive East
Use
Administrative
Status
Construction Type
New Construction
Current Phase
Design
College or Division
Division of University Advancement
CA Filing Code
448-17-1146
Project GSF
43,094
Bid Date
TBD
Project Architect
Davis Architects
General Contractor
TBD
Project Manager
TBD
Field Coordinator
TBD
Project Admin
TBD
Coming soon, the New Alumni Hall – a dedicated home for our alumni and friends to someday connect — and reconnect — with all things Bama.
Residing on the southeast corner of the historic Peter Bryce Park Preserve, the new home of UA’s Division of Advancement will enjoy picturesque views from each of the building’s three stories. The New Alumni Hall will be located on the Bryce Campus along with the new Performing Arts Academic Center and the Bryce Main, providing access to world-class theatre and dance performances as well as state-of-the-art museums. When complete, the New Alumni Hall will provide a dedicated home and sense of community for alumni, friends, and supporters of the university.
Along with offices and administrative staff spaces, the New Alumni Hall will house a 400-person ballroom, as well as other event and event support spaces. The courtyard area opening up to the Peter Bryce Park Preserve will provide an idyllic event area for alumni and friends to gather. The construction of a storm shelter will enhance not only the safety of the building, but of the surrounding Bryce campus.
BOT Budget
$21,495,321.00
Funding Sources
Banner/Project #
90777
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Administrative |
Status | Fundraising |
Construction Phase | Design |
Construction Type | New Construction |
GSF | 43,094 |
Street Address | 350 Campus Drive East |
Zone | |
Project Number | 448-17-1146 |
Architect | Davis Architects |
Project Manager | TBD |
General Contractor | TBD |
Bid Date | TBD |
Construction Start | |
Scheduled Construction End | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/7M27T/448-17-1146/default.aspx |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/348339 |
BIR Building Link | |
Project Summary |
Coming soon, the New Alumni Hall – a dedicated home for our alumni and friends to someday connect — and reconnect — with all things Bama. Residing on the southeast corner of the historic Peter Bryce Park Preserve, the new home of UA’s Division of Advancement will enjoy picturesque views from each of the building’s three stories. The New Alumni Hall will be located on the Bryce Campus along with the new Performing Arts Academic Center and the Bryce Main, providing access to world-class theatre and dance performances as well as state-of-the-art museums. When complete, the New Alumni Hall will provide a dedicated home and sense of community for alumni, friends, and supporters of the university. Along with offices and administrative staff spaces, the New Alumni Hall will house a 400-person ballroom, as well as other event and event support spaces. The courtyard area opening up to the Peter Bryce Park Preserve will provide an idyllic event area for alumni and friends to gather. The construction of a storm shelter will enhance not only the safety of the building, but of the surrounding Bryce campus. |
Renderings | |
Budget | 21495321 |
Banner Fund Number | 90777 |
Project Accountant | Sonia Wilkins |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=BCC328B6-DB09-4B68-97A6-6849B8ECB408 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90777&detail=all |
View Bid Tab | |
BOT Stage I | February 2017 |
BOT Stage II | April 2017 |
BOT Stage III | November 2017 |
BOT Stage IV | TBD |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-161/ |
College/Division | Division of University Advancement |
Project Admin | TBD |
Field Coordinator | TBD |
COSC Date | |
Year End Inspection | |
View Warranty Documents | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90777 |
Interior Designer | |
Parking Spaces | |
Construction Photos Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/448-17-1146/Project%20Photos/Forms/AllItems.aspx |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
Stage 1 Package Fields | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Funding Source(s) | |
Fundraising Site | https://giving.ua.edu/alumnihall/ |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code | |
BOT Stage |