New Alumni Hall

  • 350 Campus Drive East
Information at a Glance

Use

Administrative

Status

Fundraising

Construction Type

New Construction

Current Phase

Design

College or Division

Division of University Advancement

CA Filing Code

448-17-1146

Project GSF

43,094

Bid Date

TBD

Project Architect

Davis Architects

General Contractor

TBD

Project Manager

TBD

Field Coordinator

TBD

Project Admin

TBD

Project Summary

Coming soon, the New Alumni Hall – a dedicated home for our alumni and friends to someday connect — and reconnect — with all things Bama.

Residing on the southeast corner of the historic Peter Bryce Park Preserve, the new home of UA’s Division of Advancement will enjoy picturesque views from each of the building’s three stories. The New Alumni Hall will be located on the Bryce Campus along with the new Performing Arts Academic Center and the Bryce Main, providing access to world-class theatre and dance performances as well as state-of-the-art museums. When complete, the New Alumni Hall will provide a dedicated home and sense of community for alumni, friends, and supporters of the university.

Along with offices and administrative staff spaces, the New Alumni Hall will house a 400-person ballroom, as well as other event and event support spaces. The courtyard area opening up to the Peter Bryce Park Preserve will provide an idyllic event area for alumni and friends to gather. The construction of a storm shelter will enhance not only the safety of the building, but of the surrounding Bryce campus.


Information at a Glance

BOT Budget

$21,495,321.00

Funding Sources

Banner/Project #

90777

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

DATA LABEL DATA VALUE
Category Administrative
Status Fundraising
Construction Phase Design
Construction Type New Construction
GSF 43,094
Street Address 350 Campus Drive East
Zone
Project Number 448-17-1146
Architect Davis Architects
Project Manager TBD
General Contractor TBD
Bid Date TBD
Construction Start
Scheduled Construction End
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/7M27T/448-17-1146/default.aspx
Campus Map Link https://map.concept3d.com/?id=1222#!m/348339
BIR Building Link
Project Summary

Coming soon, the New Alumni Hall – a dedicated home for our alumni and friends to someday connect — and reconnect — with all things Bama.

Residing on the southeast corner of the historic Peter Bryce Park Preserve, the new home of UA’s Division of Advancement will enjoy picturesque views from each of the building’s three stories. The New Alumni Hall will be located on the Bryce Campus along with the new Performing Arts Academic Center and the Bryce Main, providing access to world-class theatre and dance performances as well as state-of-the-art museums. When complete, the New Alumni Hall will provide a dedicated home and sense of community for alumni, friends, and supporters of the university.

Along with offices and administrative staff spaces, the New Alumni Hall will house a 400-person ballroom, as well as other event and event support spaces. The courtyard area opening up to the Peter Bryce Park Preserve will provide an idyllic event area for alumni and friends to gather. The construction of a storm shelter will enhance not only the safety of the building, but of the surrounding Bryce campus.

Renderings
Budget 21495321
Banner Fund Number 90777
Project Accountant Sonia Wilkins
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=BCC328B6-DB09-4B68-97A6-6849B8ECB408
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90777&detail=all
View Bid Tab
BOT Stage I February 2017
BOT Stage II April 2017
BOT Stage III November 2017
BOT Stage IV TBD
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-161/
College/Division Division of University Advancement
Project Admin TBD
Field Coordinator TBD
COSC Date
Year End Inspection
View Warranty Documents
AiM Link https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90777
Interior Designer
Parking Spaces
Construction Photos Link https://uafinancialaffairs.sharepoint.com/sites/7M27T/448-17-1146/Project%20Photos/Forms/AllItems.aspx
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Attachment I
CSP I PDF
CSP II PDF
BOT Info Item PDF
Stage 1 Package Fields
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Funding Source(s)
Fundraising Site https://giving.ua.edu/alumnihall/
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code
BOT Stage