McLure Library Addition and Renovation

  • 918 University Boulevard
Information at a Glance

Use

Academic

Status

Active

Construction Type

Addition

Current Phase

Design

College or Division

University Libraries

CA Filing Code

051-23-2688

Project GSF

29,137

Bid Date

February 20, 2024

Construction Start

Summer 2024

Construction End

May 2025

Project Architect

KPS Group

General Contractor

WAR Construction Inc.

Project Manager

Mary Kathryn Holt

Field Coordinator

Colby Mixon

Project Admin

Katie Crocker-Buta

Project Summary

The proposed McLure Library Addition and Renovation project will allow for the relocation of the School of Library and Information Sciences from the 7th floor of Gorgas Library to McLure in accordance with the Gorgas Library Master Plan. SLIS is part of the College of Communications and Information Sciences, and this relocation will enhance program adjacency to Reese Phifer Hall and provide additional space needed in Gorgas while maintaining the College of Education programs within the space.

McLure Library was originally constructed in 1925 and renovated in 1954 for the College of Education Library. The building has remained primarily unchanged since that time and the Project will allow for the comprehensive renovation of McLure and will fully address all deferred maintenance issues including all new mechanical, electrical, accessibility, life safety systems, technology and building envelope issues including new windows.

The existing character, detailing and quality of the building is appropriate and much in keeping with campus and the building features standard University materials including brick and solid limestone columns, cornice and window surrounds. Together with Autherine Lucy Hall, the buildings have complemented each other and been a part of the University Boulevard streetscape
for almost a century.

The addition will also provide space for code-required vertical circulation and an elevator as the building does not currently have one.

ADA access to McLure will be improved through the construction of a new entrance structure, which will also house program space below. Adjacent to the new entry will be a plaza and gathering space designed with brick pavers, precast seat walls, new landscaping, and site lighting.

The existing access plaza to the front of the building from University Boulevard will also be reconstructed as it has exceeded its service life and does not meet current structural code.

The Project will allow for the conversion of the stack space to general use and the floors will be aligned with the main building floors. The addition will not impact the University Boulevard elevation to maintain the character of the original building main elevation.


Information at a Glance

BOT Budget

$18,856,402.00

Funding Sources

  • University Central Reserves :
    $18,856,402

Banner/Project #

91209

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division University Libraries
Status Active
Construction Phase Design
Construction Type Addition
GSF 29,137
Street Address 918 University Boulevard
Zone 1
Project Number 051-23-2688
Architect KPS Group
Project Manager Mary Kathryn Holt
Project Admin Katie Crocker-Buta
Field Coordinator Colby Mixon
General Contractor WAR Construction Inc.
Interior Designer
Bid Date February 20, 2024
Construction Start Summer 2024
Scheduled Construction End May 2025
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/051-23-2688/SitePages/Home.aspx
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91209
Campus Map Link https://map.concept3d.com/?id=1222#!m/834458
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed McLure Library Addition and Renovation project will allow for the relocation of the School of Library and Information Sciences from the 7th floor of Gorgas Library to McLure in accordance with the Gorgas Library Master Plan. SLIS is part of the College of Communications and Information Sciences, and this relocation will enhance program adjacency to Reese Phifer Hall and provide additional space needed in Gorgas while maintaining the College of Education programs within the space.

McLure Library was originally constructed in 1925 and renovated in 1954 for the College of Education Library. The building has remained primarily unchanged since that time and the Project will allow for the comprehensive renovation of McLure and will fully address all deferred maintenance issues including all new mechanical, electrical, accessibility, life safety systems, technology and building envelope issues including new windows.

The existing character, detailing and quality of the building is appropriate and much in keeping with campus and the building features standard University materials including brick and solid limestone columns, cornice and window surrounds. Together with Autherine Lucy Hall, the buildings have complemented each other and been a part of the University Boulevard streetscape
for almost a century.

The addition will also provide space for code-required vertical circulation and an elevator as the building does not currently have one.

ADA access to McLure will be improved through the construction of a new entrance structure, which will also house program space below. Adjacent to the new entry will be a plaza and gathering space designed with brick pavers, precast seat walls, new landscaping, and site lighting.

The existing access plaza to the front of the building from University Boulevard will also be reconstructed as it has exceeded its service life and does not meet current structural code.

The Project will allow for the conversion of the stack space to general use and the floors will be aligned with the main building floors. The addition will not impact the University Boulevard elevation to maintain the character of the original building main elevation.

Renderings
Budget 18856402
Banner Fund Number 91209
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage