High Performance Computing and Data Center

  • 709 Johnny Stallings Drive
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

New Construction

Current Phase

Construction

College or Division

Division of Research and Economic Development

CA Filing Code

008-23-3287

Project GSF

44,725

Bid Date

Package A and B: July 18, 2024; Package C: September 25, 2024

Project Architect

Davis Architects, Inc.

General Contractor

CivilCON, LLC (Package A and B); J.T. Harrison Construction Co. (Package C)

Project Manager

Joshua Bollinger

Project Admin

Cassidy Largin

Project Summary

The UA High Performance Computing and Data Center project, located at 709 Johnny Stallings Drive, Tuscaloosa, AL, will consist of new construction of an approximately 40,000 gross square feet (“gsf”) building to serve the campus academic needs, the Office of Research and Economic Development (ORED), and strategic partners.

The Project will consist of the new construction of a 2-story space for the HPC equipment that will include people space for UA staff offices and work areas as well as shell space for a future secure suite. The facility will be designed to provide for efficient expansion of computing over time by providing an accessible structure and shell space for both compute and support infrastructure.

The building will have an aesthetic and massing to complement the surrounding architecture and promote education of next generation HPC systems to staff, students, and visitors. The project includes a dedicated chiller plant located adjacent to the new building and all necessary vehicular access for deliveries, service vehicles, and emergency vehicles.

The Project will include the purchase of HPC equipment and will provide an appropriate environment for the operation thereof.

The project will also include a new approximately 22,500 gsf electrical substation yard. The proposed site is ideally located adjacent to Alabama Power high voltage transmission lines, which will provide adequate and resilient capacity for current use and projected growth. As these lines also serve a nearby hospital, their operation and reliability are considered critical and would be addressed as a priority in case of a major outage. This will help ensure the continuity of operations for the facility and support an efficient cost of initial construction due to the close proximity.

The selected site aligns with the UA Master plan. The proposed site was chosen considering multiple factors, chiefly the availability of high capacity and resilient electrical service, availability and capacity of other support infrastructure and utilities and environmental resiliency. The site and layout will also consider any needed future expansion of the Capstone College of Nursing.


Information at a Glance

BOT Budget

$96,000,000

Funding Sources

  • Federal NIST Grant (2023-NIST-CICGP-01) :
    $44,550,000
  • State Appropriation (Act #2023-378/SB-87) :
    $46,000,000
  • UA Central Reserves :
    $5,450,000

Banner/Project #

98951

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Division of Research and Economic Development
Status Active
Construction Phase Construction
Construction Type New Construction
GSF 44,725
Street Address 709 Johnny Stallings Drive
Zone
Project Number 008-23-3287
Architect Davis Architects, Inc.
Project Manager Joshua Bollinger
Project Admin Cassidy Largin
Field Coordinator
General Contractor CivilCON, LLC (Package A and B); J.T. Harrison Construction Co. (Package C)
Interior Designer
Bid Date Package A and B: July 18, 2024; Package C: September 25, 2024
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/PLN-23-3287
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98951
Campus Map Link https://map.concept3d.com/?id=1222#!m/834398
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The UA High Performance Computing and Data Center project, located at 709 Johnny Stallings Drive, Tuscaloosa, AL, will consist of new construction of an approximately 40,000 gross square feet (“gsf”) building to serve the campus academic needs, the Office of Research and Economic Development (ORED), and strategic partners.

The Project will consist of the new construction of a 2-story space for the HPC equipment that will include people space for UA staff offices and work areas as well as shell space for a future secure suite. The facility will be designed to provide for efficient expansion of computing over time by providing an accessible structure and shell space for both compute and support infrastructure.

The building will have an aesthetic and massing to complement the surrounding architecture and promote education of next generation HPC systems to staff, students, and visitors. The project includes a dedicated chiller plant located adjacent to the new building and all necessary vehicular access for deliveries, service vehicles, and emergency vehicles.

The Project will include the purchase of HPC equipment and will provide an appropriate environment for the operation thereof.

The project will also include a new approximately 22,500 gsf electrical substation yard. The proposed site is ideally located adjacent to Alabama Power high voltage transmission lines, which will provide adequate and resilient capacity for current use and projected growth. As these lines also serve a nearby hospital, their operation and reliability are considered critical and would be addressed as a priority in case of a major outage. This will help ensure the continuity of operations for the facility and support an efficient cost of initial construction due to the close proximity.

The selected site aligns with the UA Master plan. The proposed site was chosen considering multiple factors, chiefly the availability of high capacity and resilient electrical service, availability and capacity of other support infrastructure and utilities and environmental resiliency. The site and layout will also consider any needed future expansion of the Capstone College of Nursing.

Renderings
Budget 96000000
Banner Fund Number 98951
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage