Colonial Drive Enhancements (2019)

  • Colonial Drive, Tuscaloosa, Alabama 35487
Information at a Glance

Use

Road

Status

Active

Construction Type

Other

Current Phase

Complete

College or Division

Division of Finance and Operations

CA Filing Code

TRN-19-2159

Project GSF

NA

Bid Date

February 20, 2020

Construction Start

March 21, 2020

Construction End

July 19, 2020

Project Architect

McGiffert and Associates

General Contractor

John Plott Company, Inc.

Project Manager

Steven Mercado (8-4640)

Field Coordinator

TBD

Interior Designer

N/A

Project Admin

Brittney Fox

Project Summary

The Colonial Drive Enhancements project (“Project”) will entail the renovation of the existing Colonial Drive between University Boulevard and Bryant Drive. This proposed Project will help alleviate traffic congestion in the heart of campus and improve the quality and character of the area. The Project will allow for the elimination of bus traffic on Bryant Drive and provide an express route from the south residential area to the core of campus. By reducing traffic in this area, it will also reduce the potential for pedestrian and vehicle conflicts creating a safer pedestrian environment.

The proposed Project will allow for bus and bike traffic to go in both the north and south direction and standard vehicle traffic to continue in the south bound direction. Increased street and pedestrian lighting will provide a safer path of travel for the pedestrians in evening hours. A new valley gutter will also be installed along the west side of the street to allow for better pedestrian access to the stadium on game days. The Project pavement profile will be built to accommodate Crimson Ride transit System buses.

The project will also include the installation of both static and operable impact resistant bollards at the Colonial Drive and Bryant Drive intersection in accordance with the Bryant-Denny Stadium Gameday Security plan. Operable bollards at the intersection will allow for the elimination of large vehicles that are used as barriers on Gameday. This will greatly enhance pedestrian flow in the area.

This Project will include all necessary support infrastructure including security and safety equipment, lighting, and landscaping.


Information at a Glance

BOT Budget

$3,750,000.00

Funding Sources

  • University Plant Reserves :
    $3,750,000

Banner/Project #

90890

Project Accountant

Demon Patrick (8-8714)

Request for Qualifications
Bid Information
Bid Package Important Dates Bid Documents
Construction Package Prequalifications Due: January 21, 2020 5:00 pm
Mandatory Pre-bid Conference: January 30, 2020 2:00 pm
Mandatory Pre-bid Conference Location: Procurement Services Annex
Bid Opening: February 11, 2020 2:00 pm
Bid Opening Location: Procurement Services Annex
PROJECT BID TABS
DATA LABEL DATA VALUE
Category Road
College/Division Division of Finance and Operations
Parking Spaces
Status Active
Construction Phase Complete
Construction Type Other
GSF NA
Street Address Colonial Drive, Tuscaloosa, Alabama 35487
Zone
Project Number TRN-19-2159
Architect McGiffert and Associates
Project Manager Steven Mercado (8-4640)
Project Admin Brittney Fox
Field Coordinator TBD
General Contractor John Plott Company, Inc.
Interior Designer N/A
Bid Date February 20, 2020
Construction Start March 21, 2020
Scheduled Construction End July 19, 2020
SharePoint Active Project Site Link https://uafinancialaffairs.sharepoint.com/sites/9VD1V/LAN-19-2159/
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90890
Campus Map Link https://map.concept3d.com/?id=1222#!m/436359
BIR Building Link https://uafinancialaffairs.sharepoint.com/sites/98C3D/default.aspx
Construction Photos Link
Project Summary

The Colonial Drive Enhancements project (“Project”) will entail the renovation of the existing Colonial Drive between University Boulevard and Bryant Drive. This proposed Project will help alleviate traffic congestion in the heart of campus and improve the quality and character of the area. The Project will allow for the elimination of bus traffic on Bryant Drive and provide an express route from the south residential area to the core of campus. By reducing traffic in this area, it will also reduce the potential for pedestrian and vehicle conflicts creating a safer pedestrian environment.

The proposed Project will allow for bus and bike traffic to go in both the north and south direction and standard vehicle traffic to continue in the south bound direction. Increased street and pedestrian lighting will provide a safer path of travel for the pedestrians in evening hours. A new valley gutter will also be installed along the west side of the street to allow for better pedestrian access to the stadium on game days. The Project pavement profile will be built to accommodate Crimson Ride transit System buses.

The project will also include the installation of both static and operable impact resistant bollards at the Colonial Drive and Bryant Drive intersection in accordance with the Bryant-Denny Stadium Gameday Security plan. Operable bollards at the intersection will allow for the elimination of large vehicles that are used as barriers on Gameday. This will greatly enhance pedestrian flow in the area.

This Project will include all necessary support infrastructure including security and safety equipment, lighting, and landscaping.

Renderings
Budget 3750000
Banner Fund Number 90890
Project Accountant Demon Patrick (8-8714)
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=C05417D1-288A-44BB-81CA-A939E8A2534E
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90890&detail=all
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
BOT Stage I September 2019
BOT Stage II September 2019 (W)
BOT Stage III TBD
BOT Stage IV TBD
Attachment I
Stage 1 Submittal PDF
Stage 2 Submittal PDF
CSP I PDF
CSP II PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Info Item PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-205/
COSC Date
Year End Inspection
View Warranty Documents
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Funding Source(s)
Fundraising Site
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Closeout Documents Link
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code