Coleman Coliseum Basketball Training and Player Development Facility Expansion and Renovation

  • 1201 Coliseum Drive
Information at a Glance

Use

Athletics

Status

Active

Construction Type

Renovation

Current Phase

Construction

College or Division

Intercollegiate Athletics

CA Filing Code

082-24-3669

Project GSF

67,942

Bid Date

Early Sitework Package: July 25, 2024; Foundation Package: September 24, 2024; Building Expansion and Renovation: February 20, 2025

Construction Start

August 5, 2024

Construction End

June 1, 2026

Project Architect

Davis Architects

General Contractor

Early Sitework Package: CivilCON; Foundation Package: WAR Construction; Building Expansion and Renovation: J.T. Harrison Construction

Project Manager

Jake Chapman

Project Admin

Allie Price

Project Summary

The project will consist of a new 48,883 GSF Basketball Training Facility Expansion in the southeast corner of Coleman Coliseum and 19,059 GSF renovation of the existing facility. The project will include a new practice facility and weight room for the men’s basketball team, and the women’s basketball team will move into the current men’s practice facility and weight room, following finish and graphics upgrades.

The expansion will house player development areas for both teams, including a lobby, locker rooms, lounges, film rooms, equipment room, and sports medicine spaces.

The Project will also include an extension of the stormwater piping from the 2nd Avenue Overpass along the north side of the tracks to approximately inline with the southwest corner of Coleman Coliseum. This is necessary to stabilize the bank and to provide additional space for the rerouting of the road and utilities.

The site plan will be carefully coordinated to ensure effective bus service for fans.

The proposed project includes an early Site and Utility package to mitigate disruptions to the facility usage and a Building Expansion and Renovation package that will be phased around the Basketball season.


Information at a Glance

BOT Budget

$54,603,372

Funding Sources

  • General Revenue Bonds Series 2024B :
    $32,369,024
  • Crimson Standard Cash :
    $20,509,348
  • University Central Reserves :
    $1,725,000

Banner/Project #

91272

DATA LABEL DATA VALUE
Category Athletics
College/Division Intercollegiate Athletics
Status Active
Construction Phase Construction
Construction Type Renovation
GSF 67,942
Street Address 1201 Coliseum Drive
Zone
Project Number 082-24-3669
Architect Davis Architects
Project Manager Jake Chapman
Project Admin Allie Price
Field Coordinator
General Contractor Early Sitework Package: CivilCON; Foundation Package: WAR Construction; Building Expansion and Renovation: J.T. Harrison Construction
Interior Designer
Bid Date Early Sitework Package: July 25, 2024; Foundation Package: September 24, 2024; Building Expansion and Renovation: February 20, 2025
Construction Start August 5, 2024
Scheduled Construction End June 1, 2026
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/082-24-3669
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91272
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The project will consist of a new 48,883 GSF Basketball Training Facility Expansion in the southeast corner of Coleman Coliseum and 19,059 GSF renovation of the existing facility. The project will include a new practice facility and weight room for the men’s basketball team, and the women’s basketball team will move into the current men’s practice facility and weight room, following finish and graphics upgrades.

The expansion will house player development areas for both teams, including a lobby, locker rooms, lounges, film rooms, equipment room, and sports medicine spaces.

The Project will also include an extension of the stormwater piping from the 2nd Avenue Overpass along the north side of the tracks to approximately inline with the southwest corner of Coleman Coliseum. This is necessary to stabilize the bank and to provide additional space for the rerouting of the road and utilities.

The site plan will be carefully coordinated to ensure effective bus service for fans.

The proposed project includes an early Site and Utility package to mitigate disruptions to the facility usage and a Building Expansion and Renovation package that will be phased around the Basketball season.

Renderings
Budget 54603372
Banner Fund Number 91272
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage