Alice Kidd Buildings Demolition

  • 402 and 414 Campus Drive East
Information at a Glance

Use

Demolition

Status

Active

Construction Type

Other

Current Phase

Construction

College or Division

College of Arts and Sciences

CA Filing Code

000-24-3744

Project GSF

24,433

Project Architect

Duncan Coker Associates, P.C.

Project Manager

Leila Ahmady

Project Summary

Demolition of the Alice Kidd Buildings (“Project”), located at the southwest corner of the intersection of Peter Bryce Boulevard and Kilgore Lane, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprints will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building. The two buildings currently housing Student Media (Building #422) and the Theater and Dance Annex (Building #423) will be demolished.

Theater & Dance will be moving into Capital Hall and Student Media will be occupying the Riverside Commons building.

In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings.

This Project will facilitate the construction of the Student Well-Being Hub.


Information at a Glance

BOT Budget

$978,350

Funding Sources

  • University Central Reserves :
    $978,350

Banner/Project #

99182

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Demolition
College/Division College of Arts and Sciences
Status Active
Construction Phase Construction
Construction Type Other
GSF 24,433
Street Address 402 and 414 Campus Drive East
Zone
Project Number 000-24-3744
Architect Duncan Coker Associates, P.C.
Project Manager Leila Ahmady
Project Admin
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/000-24-3744
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=99182
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

Demolition of the Alice Kidd Buildings (“Project”), located at the southwest corner of the intersection of Peter Bryce Boulevard and Kilgore Lane, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprints will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building. The two buildings currently housing Student Media (Building #422) and the Theater and Dance Annex (Building #423) will be demolished.

Theater & Dance will be moving into Capital Hall and Student Media will be occupying the Riverside Commons building.

In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings.

This Project will facilitate the construction of the Student Well-Being Hub.

Renderings
Budget 978350
Banner Fund Number 99182
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage