Alice Kidd Buildings Demolition
- 402 and 414 Campus Drive East
Use
Demolition
Status
Construction Type
Other
Current Phase
Construction
College or Division
College of Arts and Sciences
CA Filing Code
000-24-3744
Project GSF
24,433
Project Architect
Duncan Coker Associates, P.C.
Project Manager
Leila Ahmady
Demolition of the Alice Kidd Buildings (“Project”), located at the southwest corner of the intersection of Peter Bryce Boulevard and Kilgore Lane, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprints will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building. The two buildings currently housing Student Media (Building #422) and the Theater and Dance Annex (Building #423) will be demolished.
Theater & Dance will be moving into Capital Hall and Student Media will be occupying the Riverside Commons building.
In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings.
This Project will facilitate the construction of the Student Well-Being Hub.
BOT Budget
$978,350
Funding Sources
-
University Central Reserves :
$978,350
Banner/Project #
99182
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Demolition |
College/Division | College of Arts and Sciences |
Status | Active |
Construction Phase | Construction |
Construction Type | Other |
GSF | 24,433 |
Street Address | 402 and 414 Campus Drive East |
Zone | |
Project Number | 000-24-3744 |
Architect | Duncan Coker Associates, P.C. |
Project Manager | Leila Ahmady |
Project Admin | |
Field Coordinator | |
General Contractor | |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/000-24-3744 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=99182 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
Demolition of the Alice Kidd Buildings (“Project”), located at the southwest corner of the intersection of Peter Bryce Boulevard and Kilgore Lane, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprints will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building. The two buildings currently housing Student Media (Building #422) and the Theater and Dance Annex (Building #423) will be demolished. Theater & Dance will be moving into Capital Hall and Student Media will be occupying the Riverside Commons building. In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings. This Project will facilitate the construction of the Student Well-Being Hub. |
Renderings | |
Budget | 978350 |
Banner Fund Number | 99182 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |