Undergraduate Admissions Interior Renovations

  • 751 Campus Dr
Information at a Glance

Use

Administrative

Status

Active

Construction Type

Renovation

Current Phase

Design

College or Division

Division of Academic Affairs

CA Filing Code

021-24-3656

Project GSF

12,829

Bid Date

Summer 2025

Project Architect

Chambless King Architects

Project Manager

Brittany Kyles

Project Admin

Haley Tubbs

Project Summary

The project consists of renovating approximately 12,829 GSF of space on the second floor of Student Services to give staff and prospective students proper areas for operations and admissions. The primary scope will include finish upgrades such as new flooring, paint, and
lighting.

The renovation will include the auditorium area for prospective students, all offices, reception area, and break room to suit the department’s needs better.

Currently, the Financial Affairs and Undergraduate Admissions and Scholarships are functionally aligned but are housed within different facilities. The upgrades in the suite will allow them to operate more efficiently and effectively for their students’ needs.


Information at a Glance

BOT Budget

$1,300,000

Funding Sources

  • Enrollment Management Reserves :
    $1,300,000

Banner/Project #

91262

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Administrative
College/Division Division of Academic Affairs
Status Active
Construction Phase Design
Construction Type Renovation
GSF 12,829
Street Address 751 Campus Dr
Zone
Project Number 021-24-3656
Architect Chambless King Architects
Project Manager Brittany Kyles
Project Admin Haley Tubbs
Field Coordinator
General Contractor
Interior Designer
Bid Date Summer 2025
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/021-24-3656
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91262
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The project consists of renovating approximately 12,829 GSF of space on the second floor of Student Services to give staff and prospective students proper areas for operations and admissions. The primary scope will include finish upgrades such as new flooring, paint, and
lighting.

The renovation will include the auditorium area for prospective students, all offices, reception area, and break room to suit the department’s needs better.

Currently, the Financial Affairs and Undergraduate Admissions and Scholarships are functionally aligned but are housed within different facilities. The upgrades in the suite will allow them to operate more efficiently and effectively for their students’ needs.

Renderings
Budget 1300000
Banner Fund Number 91262
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage