Alice Kidd Buildings Demolition

  • 402 and 414 Campus Drive (Part 1); 410 Campus Drive (Part 2)
Information at a Glance

Use

Demolition

Status

Active

Construction Type

Other

Current Phase

Construction

College or Division

Barefield College of Arts and Sciences

CA Filing Code

000-24-3744

Project GSF

24,433

Project Architect

Duncan Coker Associates, P.C.

Project Manager

Lane Weaver

Field Coordinator

Zach Green

Project Admin

Bethany Fenimore

Project Summary

Demolition of the final Alice Kidd Building (“Project”), located southeast of University Hall, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprint will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building.

In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings.

This Project will facilitate the completion of the Student Well-Being Hub area.


Information at a Glance

BOT Budget

$500,000

Funding Sources

  • Institutional Reserves :
    $500,000

Banner/Project #

99182

Project Accountant

Kimberly Lee

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Demolition
College/Division Barefield College of Arts and Sciences
Status Active
Construction Phase Construction
Construction Type Other
GSF 24,433
Street Address 402 and 414 Campus Drive (Part 1); 410 Campus Drive (Part 2)
Zone
Project Number 000-24-3744
Architect Duncan Coker Associates, P.C.
Project Manager Lane Weaver
Project Admin Bethany Fenimore
Field Coordinator Zach Green
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/000-24-3744
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=99182
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

Demolition of the final Alice Kidd Building (“Project”), located southeast of University Hall, will alleviate deferred maintenance and mitigate risk by removing aging inventory from campus. The existing building footprint will be graded, prepared with structural fill, grassed, and all utilities disconnected from the building.

In accordance with standard University procedure for campus building demolition, the University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER); and a standard building commemoration pedestal and plaque will be provided for the site and buildings.

This Project will facilitate the completion of the Student Well-Being Hub area.

Renderings
Budget 500000
Banner Fund Number 99182
Project Accountant Kimberly Lee
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage