University Boulevard Hackberry to 6th Ave Infrastructure & Security Improvements

  • University Boulevard between Hackberry Ln and 6th Ave
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

Other

Current Phase

Complete

College or Division

Other

CA Filing Code

TRN-23-3296

Project GSF

N/A

Bid Date

February 29, 2024

Construction Start

May 2024

Construction End

August 2024

Project Architect

Thompson Engineering

General Contractor

Lavender, Inc.

Project Manager

David Welch

Project Admin

Katie Crocker-Buta

Project Summary

The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard.

Phase A of the Project, completed Summer of 2023, provided a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter. It also included replacement of the concrete paving from the Hackberry intersection to the eastern edge of 6th Avenue and provided enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus.

Phases B and C of this Project, to be completed Summer 2024, will create additional improvements to the storm drainage along 6th Ave through the intersection of University Boulevard and in the south lawn of Gallalee Hall. The Project will also include the removal of the old concrete paving and the soon to be decommissioned steam tunnel along 6th Avenue including the intersection of University Boulevard and replacement with the new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard. This Phase of work will also include improvements to 6th Avenue to facilitate integrating 6th Avenue into the Transit system as 2 way traffic.

Phase B will consist of work in 6th Avenue from south of the University Boulevard intersection to the alley between Foster Auditorium and Farrah Hall. This Phase of work will be completed prior to May.

Phase C, to be completed between May and July 2024, will include a new traffic signal for bus traffic traveling south on 6th Avenue and repaving of 6th Avenue and rework the University and 6th Avenue Intersection. The project will rework the radius curb lines on the north side of Bryant Drive at 6th Avenue to accommodate bus traffic that will now be travelling south on 6th Ave towards Bryant Drive and allow them room for turning onto Bryant Drive. The project will also include the installation of UA furnished historic Tuscaloosa Trolly Interpretive Display.


Information at a Glance

BOT Budget

$5,069,324.00

Funding Sources

  • University Central Reserves :
    $4,069,324
  • Parking Services Reserves :
    $1,000,000

Banner/Project #

91217

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Active
Construction Phase Complete
Construction Type Other
GSF N/A
Street Address University Boulevard between Hackberry Ln and 6th Ave
Zone
Project Number TRN-23-3296
Architect Thompson Engineering
Project Manager David Welch
Project Admin Katie Crocker-Buta
Field Coordinator
General Contractor Lavender, Inc.
Interior Designer
Bid Date February 29, 2024
Construction Start May 2024
Scheduled Construction End August 2024
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/TRN-23-3296
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91217
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed University Boulevard Hackberry to 6th Avenue Infrastructure and Security Improvements project (“Project”) will create much-needed improvements to the storm drainage along University Boulevard and around Farrah Hall. The Project will also include the removal of the old concrete paving in that section of University Boulevard and replacement with new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard.

Phase A of the Project, completed Summer of 2023, provided a new operable bollard system in the roadway for vehicular control to be used on University of Alabama home football game days and other special events hosted in the area to provide a secure perimeter. It also included replacement of the concrete paving from the Hackberry intersection to the eastern edge of 6th Avenue and provided enhanced landscaping and hardscaping along this highly traveled gateway to the heart of the University of Alabama campus.

Phases B and C of this Project, to be completed Summer 2024, will create additional improvements to the storm drainage along 6th Ave through the intersection of University Boulevard and in the south lawn of Gallalee Hall. The Project will also include the removal of the old concrete paving and the soon to be decommissioned steam tunnel along 6th Avenue including the intersection of University Boulevard and replacement with the new asphalt paving to create a smooth and aesthetically pleasing road surface consistent with the previous phases of University Boulevard. This Phase of work will also include improvements to 6th Avenue to facilitate integrating 6th Avenue into the Transit system as 2 way traffic.

Phase B will consist of work in 6th Avenue from south of the University Boulevard intersection to the alley between Foster Auditorium and Farrah Hall. This Phase of work will be completed prior to May.

Phase C, to be completed between May and July 2024, will include a new traffic signal for bus traffic traveling south on 6th Avenue and repaving of 6th Avenue and rework the University and 6th Avenue Intersection. The project will rework the radius curb lines on the north side of Bryant Drive at 6th Avenue to accommodate bus traffic that will now be travelling south on 6th Ave towards Bryant Drive and allow them room for turning onto Bryant Drive. The project will also include the installation of UA furnished historic Tuscaloosa Trolly Interpretive Display.

Renderings
Budget 5069324
Banner Fund Number 91217
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage