Chi Omega Bedroom Renovation
- 901 Magnolia Drive
Use
Greek
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
Division of Student Life
CA Filing Code
910-22-2938
Project GSF
9,438
Bid Date
September 27, 2022
Construction End
August 2023
Project Architect
TRI Architecture + Interior Design
General Contractor
Kyser Construction
Project Manager
Michael Hand
Field Coordinator
Colby Mixon
Project Admin
Alison Langham
Chi Omega is requesting to replace their existing bedroom furniture with built-in beds, dressers, storage and closets to provide more space and enhance the function of the rooms for the members. This will help bring the house up to current trends in Greek life and aid in future recruitment and chapter growth.
The Project will include replacing existing freestanding furniture with painted built-in beds, storage and updated closets.
The bedroom walls and ceilings will also be painted.
There will be no work in the facility outside of the bedrooms.
BOT Budget
$1,577,315.00
Funding Sources
-
Chapter Funds :
$1,577,315
Banner/Project #
98814
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Greek |
College/Division | Division of Student Life |
Status | Closed |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 9,438 |
Street Address | 901 Magnolia Drive |
Zone | 12 |
Project Number | 910-22-2938 |
Architect | TRI Architecture + Interior Design |
Project Manager | Michael Hand |
Project Admin | Alison Langham |
Field Coordinator | Colby Mixon |
General Contractor | Kyser Construction |
Interior Designer | |
Bid Date | September 27, 2022 |
Construction Start | |
Scheduled Construction End | August 2023 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/910-22-2938 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98814 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/643061 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
Chi Omega is requesting to replace their existing bedroom furniture with built-in beds, dressers, storage and closets to provide more space and enhance the function of the rooms for the members. This will help bring the house up to current trends in Greek life and aid in future recruitment and chapter growth. The Project will include replacing existing freestanding furniture with painted built-in beds, storage and updated closets. The bedroom walls and ceilings will also be painted. There will be no work in the facility outside of the bedrooms. |
Renderings | |
Budget | 1577315 |
Banner Fund Number | 98814 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |