University Boulevard Drive-Through Retail

  • 225 University Boulevard East
Information at a Glance

Use

Dining

Status

Closed

Construction Type

New Construction

Current Phase

Complete

College or Division

Other

CA Filing Code

339-22-2964

Project GSF

1,000

Bid Date

March 9, 2023

Construction Start

April 24, 2023

Construction End

August 2023

Project Architect

CMH Architects

General Contractor

Snow-Blakeney Construction

Project Manager

Jessie Green

Field Coordinator

Darron Hydrick

Project Admin

Alison Langham

Project Summary

The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community.

This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order at the service window. There is no interior café.

The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue.

The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area.


Information at a Glance

BOT Budget

$2,750,000.00

Funding Sources

  • Food Services Operations :
    $2,750,000

Banner/Project #

90994

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Dining
College/Division Other
Status Closed
Construction Phase Complete
Construction Type New Construction
GSF 1,000
Street Address 225 University Boulevard East
Zone
Project Number 339-22-2964
Architect CMH Architects
Project Manager Jessie Green
Project Admin Alison Langham
Field Coordinator Darron Hydrick
General Contractor Snow-Blakeney Construction
Interior Designer
Bid Date March 9, 2023
Construction Start April 24, 2023
Scheduled Construction End August 2023
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/339-22-2964
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90994
Campus Map Link https://map.concept3d.com/?id=1222#!m/607966
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community.

This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order at the service window. There is no interior café.

The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue.

The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area.

Renderings
Budget 2750000
Banner Fund Number 90994
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage