University Boulevard Drive-Through Retail
- 225 University Boulevard East
Use
Dining
Status
Construction Type
New Construction
Current Phase
Complete
College or Division
Other
CA Filing Code
339-22-2964
Project GSF
1,000
Bid Date
March 9, 2023
Construction Start
April 24, 2023
Construction End
August 2023
Project Architect
CMH Architects
General Contractor
Snow-Blakeney Construction
Project Manager
Jessie Green
Field Coordinator
Darron Hydrick
Project Admin
Alison Langham
The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community.
This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order at the service window. There is no interior café.
The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue.
The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area.
BOT Budget
$2,750,000.00
Funding Sources
-
Food Services Operations :
$2,750,000
Banner/Project #
90994
Project Accountant
Parker Christian
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
February 2, 2023
University Boulevard Drive-Through Retail - Site Package -
March 9, 2023
University Boulevard Drive-Through Retail - Main Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Dining |
College/Division | Other |
Status | Closed |
Construction Phase | Complete |
Construction Type | New Construction |
GSF | 1,000 |
Street Address | 225 University Boulevard East |
Zone | |
Project Number | 339-22-2964 |
Architect | CMH Architects |
Project Manager | Jessie Green |
Project Admin | Alison Langham |
Field Coordinator | Darron Hydrick |
General Contractor | Snow-Blakeney Construction |
Interior Designer | |
Bid Date | March 9, 2023 |
Construction Start | April 24, 2023 |
Scheduled Construction End | August 2023 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/339-22-2964 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90994 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/607966 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The retail facility on University Boulevard will consist of the construction of a new Starbucks drive-through facility to serve the University community. This Project will be a 1,000 square foot Starbucks coffee facility, with drive-through service only. The building will be a one-story, traditional appearance Starbucks designed to serve customers through the drive-through window and with an alternative pick-up option for customers who choose to order at the service window. There is no interior café. The facility will include an appropriate surface lot, drive-through queueing, loading dock, and service facilities to support the venue. The lot is currently vacant and highly accessible, and the proposed use is consistent with the retail and commercial nature of the area. |
Renderings | |
Budget | 2750000 |
Banner Fund Number | 90994 |
Project Accountant | Parker Christian |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |