Existing Tutwiler Demolition and Site Redevelopment

  • 901 Paul W. Bryant Drive
Information at a Glance

Use

Residential

Status

Closed

Construction Type

Other

Current Phase

Complete

College or Division

Division of Student Life

CA Filing Code

206-20-2446

Project GSF

-270,225

Bid Date

March 3, 2022

Construction Start

May 16, 2022

Construction End

January 2023

Project Architect

Turner Batson Architects

Project Manager

Terrence Craven

Field Coordinator

Chad Elliott

Project Admin

Cassidy Largin

Project Summary

This proposed Project will include demolition of the 270,225 gross square foot existing residence hall, site development to stabilize the area impacted by the demolition of the existing residence hall, pedestrian pathways, and utilities necessary to service the area. This proposed Project will also include the construction of a drop off surface lot to serve the New Tutwiler Residence Hall and a bus loop for better traffic flow in the area. Site lighting and a traffic signal along 10th Avenue will be included to address traffic in the area. Utilities including temporary storm drainage and rerouting of existing electrical and telecommunication service will be included in the Project.

This project will be comprised of 2 packages:  Package A – Existing Tutwiler Demolition, and Package B – Site Redevelopment Phase I.  Package A – Existing Tutwiler Demolition will include abatement and demolition of the existing residence hall, disconnection of utilities, and rough grading of the site for transition to Package B – Site Redevelopment. Package B – Site Redevelopment Phase I will include pedestrian pathways to service the area from Bryant Drive only, utility improvements, road and infrastructure improvements, site lighting, and a traffic signal along 10th Avenue. Phase I will only stabilize the area of the existing residence hall and provide temporary drainage.

 

View Progress Photos!
Information at a Glance

BOT Budget

$12,740,000

Funding Sources

  • Housing and Residential Communities :
    $10,000,000
  • University Central Reserves :
    $2,740,000

Banner/Project #

98599

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Residential
College/Division Division of Student Life
Bed Count
Status Closed
Construction Phase Complete
Construction Type Other
GSF -270,225
Street Address 901 Paul W. Bryant Drive
Zone 7
Project Number 206-20-2446
Architect Turner Batson Architects
Project Manager Terrence Craven
Project Admin Cassidy Largin
Field Coordinator Chad Elliott
General Contractor
Interior Designer
Bid Date March 3, 2022
Construction Start May 16, 2022
Scheduled Construction End January 2023
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/206-20-2446/SitePages/Home.aspx
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98599
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

This proposed Project will include demolition of the 270,225 gross square foot existing residence hall, site development to stabilize the area impacted by the demolition of the existing residence hall, pedestrian pathways, and utilities necessary to service the area. This proposed Project will also include the construction of a drop off surface lot to serve the New Tutwiler Residence Hall and a bus loop for better traffic flow in the area. Site lighting and a traffic signal along 10th Avenue will be included to address traffic in the area. Utilities including temporary storm drainage and rerouting of existing electrical and telecommunication service will be included in the Project.

This project will be comprised of 2 packages:  Package A – Existing Tutwiler Demolition, and Package B – Site Redevelopment Phase I.  Package A – Existing Tutwiler Demolition will include abatement and demolition of the existing residence hall, disconnection of utilities, and rough grading of the site for transition to Package B – Site Redevelopment. Package B – Site Redevelopment Phase I will include pedestrian pathways to service the area from Bryant Drive only, utility improvements, road and infrastructure improvements, site lighting, and a traffic signal along 10th Avenue. Phase I will only stabilize the area of the existing residence hall and provide temporary drainage.

 

View Progress Photos!
Renderings
Budget 12740000
Banner Fund Number 98599
Project Accountant Parker Christian
Funding Source(s)
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=98599&detail=all
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Runtime/Form.aspx?_Name=Project%20Initiation%20Request&_State=PIR_HISTORY&GUID=8483CD27-3E8B-4055-A465-91D49222BEF6
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage