Clinical Services and Research MRI Addition to Student Health
- 850 Peter Bryce Boulevard
Use
Research
Status
Construction Type
Addition
Current Phase
Construction
College or Division
Division of Academic Affairs
CA Filing Code
018-20-2305
Project GSF
23,458
Bid Date
August 10, 2021
Construction Start
September 2021
COSC Date
' August 6, 2022
Project Architect
Williams Blackstock Architects
General Contractor
J.T. Harrison Construction Co., Inc.
Project Manager
David Jones (8-3712)
Field Coordinator
Zach Green
Project Admin
Alison Langham
The Project entails a two-story steel and concrete frame addition located due west of the northwest corner of Student Health set into the hillside. The first floor will accommodate the research MRI and support services. The 13,702 square foot second floor will align with the existing gabled end of Student Health to provide a seamless transition to the buildings as well as allocating space for vertical circulation needs.
View Progress Photos!
BOT Budget
$15,623,000.00
Funding Sources
-
Office of Academic Affairs Research Reserves :
$4,976,882 -
Office for Research and Economic Development Research Reserves :
$1,430,723 -
National Science Foundation (NSF) Grant :
$1,605,115 -
University Central Reserves :
$6,860,280 -
College of Community Health Sciences/Capstone Health Services Foundation Reserves :
$750,000
Banner/Project #
98534
Project Accountant
Sherell Harrison (8-6838)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
Due By: February 24, 2020 5:00 pm
UA RFQ-MRI - RFQ Insurance Requirements
- RFQ Vendor Disclosure
DATA LABEL | DATA VALUE |
---|---|
Category | Research |
College/Division | Division of Academic Affairs |
Status | Active |
Construction Phase | Construction |
Construction Type | Addition |
GSF | 23,458 |
Street Address | 850 Peter Bryce Boulevard |
Zone | 5 |
Project Number | 018-20-2305 |
Architect | Williams Blackstock Architects |
Project Manager | David Jones (8-3712) |
Project Admin | Alison Langham |
Field Coordinator | Zach Green |
General Contractor | J.T. Harrison Construction Co., Inc. |
Interior Designer | |
Bid Date | August 10, 2021 |
Construction Start | September 2021 |
Scheduled Construction End | |
COSC Date | August 6, 2022 |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/018-20-2305/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98534 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/576560?ce/31891?ct/40824,31490?mc/33.21292617348,-87.537474129349?z/16?lvl/0 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Project entails a two-story steel and concrete frame addition located due west of the northwest corner of Student Health set into the hillside. The first floor will accommodate the research MRI and support services. The 13,702 square foot second floor will align with the existing gabled end of Student Health to provide a seamless transition to the buildings as well as allocating space for vertical circulation needs. View Progress Photos! |
Renderings | |
Budget | 15623000 |
Banner Fund Number | 98534 |
Project Accountant | Sherell Harrison (8-6838) |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=98534&detail=all |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=D8B83D52-089E-4854-8DC5-580BF3E7CDD2 |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |