University Boulevard Lot Stormwater Improvements
- 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses,
Use
Utilities & Infrastructure
Status
Construction Type
Other
Current Phase
Complete
College or Division
Other
CA Filing Code
UTL-22-3014
Bid Date
March 9, 2023
Construction End
August 2023
Project Architect
McGiffert and Associates, LLC
Project Manager
Lane Weaver
Field Coordinator
Zach Green
Project Admin
Katie Crocker-Buta
The proposed University Boulevard Lot Stormwater Improvements project (“Project”), located at 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses, will consist of stormwater improvements to reroute the existing open drainage way and provide a piped drainage way from 4ᵗʰ Street to the northwest corner of 2ⁿᵈ Avenue and University Boulevard.
The existing open drainage way is unsightly, often contains standing water and is difficult to maintain given the steep sloped banks. The piping will be oversized to the extent possible to provide in-pipe detention. The drainage way will also be rerouted to provide room for development on the site.
This stormwater ultimately discharges to the Cribbs Mill Creek Tributary at the railroad tracks south of the School of Law. This work has been, and is, reflected in the Annual Consolidated Capital Projects and Facilities Report.
BOT Budget
$2,500,000
Funding Sources
-
University Central Reserves :
$2,250,000 -
Kappa Sigma Chapter Reserves :
$250,000
Banner/Project #
90983
Project Accountant
Sherell McVay
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Utilities & Infrastructure |
College/Division | Other |
Status | Closed |
Construction Phase | Complete |
Construction Type | Other |
GSF | |
Street Address | 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses, |
Zone | 4 |
Project Number | UTL-22-3014 |
Architect | McGiffert and Associates, LLC |
Project Manager | Lane Weaver |
Project Admin | Katie Crocker-Buta |
Field Coordinator | Zach Green |
General Contractor | |
Interior Designer | |
Bid Date | March 9, 2023 |
Construction Start | |
Scheduled Construction End | August 2023 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/UTL-22-3014 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90983 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/643063 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The proposed University Boulevard Lot Stormwater Improvements project (“Project”), located at 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses, will consist of stormwater improvements to reroute the existing open drainage way and provide a piped drainage way from 4ᵗʰ Street to the northwest corner of 2ⁿᵈ Avenue and University Boulevard. The existing open drainage way is unsightly, often contains standing water and is difficult to maintain given the steep sloped banks. The piping will be oversized to the extent possible to provide in-pipe detention. The drainage way will also be rerouted to provide room for development on the site. This stormwater ultimately discharges to the Cribbs Mill Creek Tributary at the railroad tracks south of the School of Law. This work has been, and is, reflected in the Annual Consolidated Capital Projects and Facilities Report. |
Renderings | |
Budget | 2500000 |
Banner Fund Number | 90983 |
Project Accountant | Sherell McVay |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |