University Boulevard Lot Stormwater Improvements

  • 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses,
Information at a Glance

Use

Utilities & Infrastructure

Status

Closed

Construction Type

Other

Current Phase

Complete

College or Division

Other

CA Filing Code

UTL-22-3014

Bid Date

March 9, 2023

Construction End

August 2023

Project Architect

McGiffert and Associates, LLC

Project Manager

Lane Weaver

Field Coordinator

Zach Green

Project Admin

Katie Crocker-Buta

Project Summary

The proposed University Boulevard Lot Stormwater Improvements project (“Project”), located at 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses, will consist of stormwater improvements to reroute the existing open drainage way and provide a piped drainage way from 4ᵗʰ Street to the northwest corner of 2ⁿᵈ Avenue and University Boulevard.

The existing open drainage way is unsightly, often contains standing water and is difficult to maintain given the steep sloped banks. The piping will be oversized to the extent possible to provide in-pipe detention. The drainage way will also be rerouted to provide room for development on the site.

This stormwater ultimately discharges to the Cribbs Mill Creek Tributary at the railroad tracks south of the School of Law. This work has been, and is, reflected in the Annual Consolidated Capital Projects and Facilities Report.


Information at a Glance

BOT Budget

$2,500,000.00

Funding Sources

  • University Central Reserves :
    $2,250,000
  • Kappa Sigma Chapter Reserves :
    $250,000

Banner/Project #

90983

Project Accountant

Sherell McVay

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Closed
Construction Phase Complete
Construction Type Other
GSF
Street Address 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses,
Zone 4
Project Number UTL-22-3014
Architect McGiffert and Associates, LLC
Project Manager Lane Weaver
Project Admin Katie Crocker-Buta
Field Coordinator Zach Green
General Contractor
Interior Designer
Bid Date March 9, 2023
Construction Start
Scheduled Construction End August 2023
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/UTL-22-3014
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90983
Campus Map Link https://map.concept3d.com/?id=1222#!m/643063
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed University Boulevard Lot Stormwater Improvements project (“Project”), located at 282 University Boulevard between the Sigma Phi Epsilon and Pi Kappa Alpha chapter houses, will consist of stormwater improvements to reroute the existing open drainage way and provide a piped drainage way from 4ᵗʰ Street to the northwest corner of 2ⁿᵈ Avenue and University Boulevard.

The existing open drainage way is unsightly, often contains standing water and is difficult to maintain given the steep sloped banks. The piping will be oversized to the extent possible to provide in-pipe detention. The drainage way will also be rerouted to provide room for development on the site.

This stormwater ultimately discharges to the Cribbs Mill Creek Tributary at the railroad tracks south of the School of Law. This work has been, and is, reflected in the Annual Consolidated Capital Projects and Facilities Report.

Renderings
Budget 2500000
Banner Fund Number 90983
Project Accountant Sherell McVay
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage