University Club Restoration and Additions

  • 421 Queen City Avenue
Information at a Glance

Use

Other

Status

Active

Construction Type

Renovation

Current Phase

Design

College or Division

Other

CA Filing Code

207-22-3017

Project GSF

15,729

Project Architect

Cole & Cole Architects

General Contractor

TBD

Project Manager

Steven Mercado

Field Coordinator

Joe Daidone

Project Admin

Haley Tubbs

Project Summary

Package A Building Restoration
The University Club is a historic two-story Greek Revival structure with stucco veneer over solid masonry walls and a slate roof. Several additions have been added over the years. The scope of the proposed project involves a full restoration of the facility, excluding the kitchen, service yard and administrative wings.

The existing reception, dining and special event spaces will be renovated and will continue to be used in similar capacities following the restoration. The existing south parlor will be repurposed as a lounge, casual dining area, and bar. The future south and east additions will include enhanced vertical circulation, additional dining space, a stairwell, expanded restrooms, and event space. The existing north parlor will be repurposed as a workspace with a similar concept to a hotel lobby. A boardroom will be added to the second floor. The south elevation of the building will feature spacious with a balcony that overlooks the south garden and University Boulevard.

This Project will also provide the opportunity to bring coherence between the numerous additions to the building while providing architecturally accurate execution of the massing, exterior detailing, elements, and materials as appropriate for this significant structure.

Package B Select Interior Demolition
The select interior demolition package will open up the ceilings, walls and floors to aid in design by exposing the buildings structure for evaluation and to facilitate future work. This package will also include the protection of elements which will stay in place during construction. The interior demolition will also expedite the building restoration by allowing the contractor to start immediately on advancing work.

Package C Elevators
The elevator package is needed for early procurement of long lead time elevator equipment in order to meet the Project schedule. Two elevators will be provided in the facility so as to separate service and patron use. The Project will address significant deferred maintenance needs including building envelope and building support systems and infrastructure. The Project will include careful and appropriate attention to restoring and conserving the interior while honoring the building’s historic character.


Information at a Glance

BOT Budget

$13,000,000.00

Funding Sources

  • University Central Reserves:
    $13,000,000

Banner/Project #

90982

Project Accountant

Parker Christian

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Other
Status Active
Construction Phase Design
Construction Type Renovation
GSF 15,729
Street Address 421 Queen City Avenue
Zone 5
Project Number 207-22-3017
Architect Cole & Cole Architects
Project Manager Steven Mercado
Project Admin Haley Tubbs
Field Coordinator Joe Daidone
General Contractor TBD
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/207-22-3017
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90982
Campus Map Link https://map.concept3d.com/?id=1222#!m/643065
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

Package A Building Restoration
The University Club is a historic two-story Greek Revival structure with stucco veneer over solid masonry walls and a slate roof. Several additions have been added over the years. The scope of the proposed project involves a full restoration of the facility, excluding the kitchen, service yard and administrative wings.

The existing reception, dining and special event spaces will be renovated and will continue to be used in similar capacities following the restoration. The existing south parlor will be repurposed as a lounge, casual dining area, and bar. The future south and east additions will include enhanced vertical circulation, additional dining space, a stairwell, expanded restrooms, and event space. The existing north parlor will be repurposed as a workspace with a similar concept to a hotel lobby. A boardroom will be added to the second floor. The south elevation of the building will feature spacious with a balcony that overlooks the south garden and University Boulevard.

This Project will also provide the opportunity to bring coherence between the numerous additions to the building while providing architecturally accurate execution of the massing, exterior detailing, elements, and materials as appropriate for this significant structure.

Package B Select Interior Demolition
The select interior demolition package will open up the ceilings, walls and floors to aid in design by exposing the buildings structure for evaluation and to facilitate future work. This package will also include the protection of elements which will stay in place during construction. The interior demolition will also expedite the building restoration by allowing the contractor to start immediately on advancing work.

Package C Elevators
The elevator package is needed for early procurement of long lead time elevator equipment in order to meet the Project schedule. Two elevators will be provided in the facility so as to separate service and patron use. The Project will address significant deferred maintenance needs including building envelope and building support systems and infrastructure. The Project will include careful and appropriate attention to restoring and conserving the interior while honoring the building’s historic character.

Renderings Array
Budget 13000000
Banner Fund Number 90982
Project Accountant Parker Christian
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s) Array
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations Array
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage Array