Tom Bevill Building Renovations

  • 201 7th Ave
Information at a Glance

Use

Academic

Status

Fundraising

Construction Type

Renovation

Current Phase

Design

College or Division

College of Arts and Sciences

CA Filing Code

249-23-3398

Project GSF

14,293

Bid Date

Fall 2024

Construction Start

TBD

Construction End

TBD

Project Architect

Williams Blackstock Architects

General Contractor

Package A: WAR Construction, Inc.; Package B: N.C. Morgan Construction Co., Inc.

Project Manager

Jeremy Wood

Project Admin

Bethany Fenimore

Project Summary

The Project will renovate space on the 2nd floor of the Tom Bevill Building (“Bevill Building”) to create a new office suite for the Geography Department. The completion of this suite will allow for the relocation of the Geography Department to the Bevill Building, from Farrah Hall and enable future renovations to Farrah.

The Project will also encompass renovations and export control security enhancements for the Alabama Materials Institute (“AMI”) Laboratory Corridor, AMI 0006 Laboratory and renovate the office suite spaces in the Tom Bevill Building as necessary to support additional grants AMI has received.

Renovations will encompass 14,293 square feet of existing space in the Bevill Building including research laboratory space, and faculty and staff offices. The work will include all necessary mechanical, electrical, plumbing and life safety to support the project.

The Project will also include all necessary Audiovisual and technology equipment and appropriate acoustical and sound isolation assemblies.

The Project will address campus deferred maintenance (capital renewal) liabilities in the amount of approximately $2,500,000.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges.


Information at a Glance

BOT Budget

$8,770,000

Funding Sources

  • Office of Academic Affairs Reserves :
    $4,300,000
  • Grants (Research Equipment) :
    $2,252,028
  • University Central Reserves :
    $1,067,972
  • Office of Research and Economic Development :
    $1,050,000
  • College of Arts and Sciences Reserves :
    $100,000

Banner/Project #

98998

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division College of Arts and Sciences
Status Fundraising
Construction Phase Design
Construction Type Renovation
GSF 14,293
Street Address 201 7th Ave
Zone
Project Number 249-23-3398
Architect Williams Blackstock Architects
Project Manager Jeremy Wood
Project Admin Bethany Fenimore
Field Coordinator
General Contractor Package A: WAR Construction, Inc.; Package B: N.C. Morgan Construction Co., Inc.
Interior Designer
Bid Date Fall 2024
Construction Start TBD
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/249-23-3398
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98998
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Project will renovate space on the 2nd floor of the Tom Bevill Building (“Bevill Building”) to create a new office suite for the Geography Department. The completion of this suite will allow for the relocation of the Geography Department to the Bevill Building, from Farrah Hall and enable future renovations to Farrah.

The Project will also encompass renovations and export control security enhancements for the Alabama Materials Institute (“AMI”) Laboratory Corridor, AMI 0006 Laboratory and renovate the office suite spaces in the Tom Bevill Building as necessary to support additional grants AMI has received.

Renovations will encompass 14,293 square feet of existing space in the Bevill Building including research laboratory space, and faculty and staff offices. The work will include all necessary mechanical, electrical, plumbing and life safety to support the project.

The Project will also include all necessary Audiovisual and technology equipment and appropriate acoustical and sound isolation assemblies.

The Project will address campus deferred maintenance (capital renewal) liabilities in the amount of approximately $2,500,000.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges.

Renderings
Budget 8770000
Banner Fund Number 98998
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage