Osband Hall Demolition

  • 814 6th Ave
Information at a Glance

Use

Demolition

Status

Active

Construction Type

Other

Current Phase

Design

College or Division

Other

CA Filing Code

074-24-3608

Project GSF

31,429

Bid Date

Spring 2024

Construction Start

TBD

Construction End

TBD

Project Architect

Duncan Coker Associates

General Contractor

TBD

Project Manager

Steven Mercado

Field Coordinator

TBD

Interior Designer

TBD

Project Admin

Cassidy Largin

Information at a Glance

BOT Budget

$990,000.00

Funding Sources

  • University Central Reserves :
    $990,000

Banner/Project #

99078

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Demolition
College/Division Other
Status Active
Construction Phase Design
Construction Type Other
GSF 31,429
Street Address 814 6th Ave
Zone
Project Number 074-24-3608
Architect Duncan Coker Associates
Project Manager Steven Mercado
Project Admin Cassidy Largin
Field Coordinator TBD
General Contractor TBD
Interior Designer TBD
Bid Date Spring 2024
Construction Start TBD
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/074-24-3608
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=99078
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary
Renderings
Budget 990000
Banner Fund Number 99078
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage