The Bryce House
- 315 Bryce Lawn Drive, Tuscaloosa, AL 35487
Information at a Glance
Use
Other
Status
Construction Type
Renovation
Current Phase
Closeout
College or Division
Division of Finance and Operations
CA Filing Code
417-21-2494
Project GSF
7,177
Bid Date
April 8, 2021
Construction Start
April 26, 2021
Construction End
August 2021
COSC Date
' September 10, 2021
Project Architect
UA Design Team
General Contractor
J.T. Harrison Construction Co., Inc.
Project Manager
Charles Phillips (8-2213)
Field Coordinator
Ed Sawyer
Interior Designer
Jennifer Shappley
Information at a Glance
BOT Budget
$4,378,621.00
Funding Sources
Banner/Project #
98611
BOT Submissions
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
Request for Qualifications
Bid Information
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Division of Finance and Operations |
Status | Closed |
Construction Phase | Closeout |
Construction Type | Renovation |
GSF | 7,177 |
Street Address | 315 Bryce Lawn Drive, Tuscaloosa, AL 35487 |
Zone | |
Project Number | 417-21-2494 |
Architect | UA Design Team |
Project Manager | Charles Phillips (8-2213) |
Project Admin | |
Field Coordinator | Ed Sawyer |
General Contractor | J.T. Harrison Construction Co., Inc. |
Interior Designer | Jennifer Shappley |
Bid Date | April 8, 2021 |
Construction Start | April 26, 2021 |
Scheduled Construction End | August 2021 |
COSC Date | September 10, 2021 |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/417-21-2494 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98611 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/561911 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | |
Renderings | |
Budget | 4378621 |
Banner Fund Number | 98611 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=98611&detail=all |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=372710FB-B7BB-47B9-887C-D52D9DEF4A2C |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |