Peter Bryce Main Renovation
- Peter Bryce Campus
Use
Academic
Status
Construction Type
Renovation
Current Phase
Construction
College or Division
College of Arts and Sciences
CA Filing Code
415-21-2548
Project GSF
117,352
Bid Date
September 7, 2023
Construction Start
February 2022
Construction End
November 2024
Project Architect
TurnerBatson Architects
General Contractor
J. T. Harrison Construction Co., Inc.
Project Manager
Austin Fisher
Field Coordinator
Lee Orr
Project Admin
Allie Price
Bryce Main – restoring the past, reimagining the future.
Recognizing the caliber of the performing arts at UA, the University is writing a new script and reimagining the role of Bryce Main. This transformation will reenergize and reimagine this historic facility, allowing it to not only be an important part in the story of how campus developed in the past but also how campus will grow in the future. Paying careful attention to replicate existing details and elements of the original architecture, the University is renovating the main hospital building to include the University welcome center, reception venue and associated office and administrative space. The building will also house faculty offices and rehearsal space for Theatre and Dance, as well as museums dedicated to both University history and the history of mental health in Alabama.
Evolutia Historic Project Video
Yellowhammer News – First Look at the Catherine and Pettus Randall Welcome Center
BOT Budget
$94,693,000
Funding Sources
-
2014 General Revenue Bonds :
$27,646,584 -
2017 General Revenue Bonds :
$998,874 -
2019 General Revenue Bonds :
$33,266,420 -
Public School and College Authority :
$21,838,122 -
University Central Reserves :
$10,943,000
Banner/Project #
90937
Project Accountant
Kimberly Lee
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
January 15, 2015
Demolition Package A - Demolition and Abatement of Hospital Wards -
April 9, 2015
Demolition Package B - Demolition Phase II -
September 29, 2015
Demolition Package C - Demo of Apparel, Laundry, Paint Shop -
November 19, 2015
Demolition Package D - Rear Demolition Package -
March 3, 2016
Demolition Package E - Selective Demolition Package -
April 2, 2015
Stabilization Package A - Interior Demolition & Abatement -
December 6, 2016
Stabilization Package B - Exterior Demo and Scaffolding -
January 18, 2018
Stabilization Package C - Masonry Repair Project -
February 18, 2020
Stabilization Package E - Miscellaneous Carpentry Package -
October 27, 2020
Stabilization Package F - Central Stair & Vertical Circulation Package -
December 2, 2021
Peter Bryce Main Stabilization and 1st Floor Fit-Out
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
Status | Active |
Construction Phase | Construction |
Construction Type | Renovation |
GSF | 117,352 |
Street Address | Peter Bryce Campus |
Zone | 3 |
Project Number | 415-21-2548 |
Architect | TurnerBatson Architects |
Project Manager | Austin Fisher |
General Contractor | J. T. Harrison Construction Co., Inc. |
Bid Date | September 7, 2023 |
Construction Start | February 2022 |
Scheduled Construction End | November 2024 |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/415-21-2548 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/500804 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Project Summary |
Bryce Main – restoring the past, reimagining the future. Recognizing the caliber of the performing arts at UA, the University is writing a new script and reimagining the role of Bryce Main. This transformation will reenergize and reimagine this historic facility, allowing it to not only be an important part in the story of how campus developed in the past but also how campus will grow in the future. Paying careful attention to replicate existing details and elements of the original architecture, the University is renovating the main hospital building to include the University welcome center, reception venue and associated office and administrative space. The building will also house faculty offices and rehearsal space for Theatre and Dance, as well as museums dedicated to both University history and the history of mental health in Alabama. Evolutia Historic Project VideoYellowhammer News – First Look at the Catherine and Pettus Randall Welcome Center |
Renderings | |
Budget | 94693000 |
Banner Fund Number | 90937 |
Project Accountant | Kimberly Lee |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=0C8A609B-63E2-436F-AA26-058D254D42B6 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90630&detail=all |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Peter-Bryce-Main-Interior-Demolition-and-Abatement-415-14-172A-4-2-15.pdf |
BOT Stage I | June 2013 |
BOT Stage II | June 2014, September 2014, February 2015 |
BOT Stage III | NA |
BOT Stage IV | April 2015 (NTE) |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-159/ |
College/Division | College of Arts and Sciences |
Project Admin | Allie Price |
Field Coordinator | Lee Orr |
COSC Date | |
Year End Inspection | |
View Warranty Documents | |
Interior Designer | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90937 |
Construction Photos Link | |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
Stage 1 Package Fields | |
Funding Source(s) | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Fundraising Site | https://www.ua.edu/performingarts/ |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Closeout Documents Link | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
360 Embed Code | |
BOT Stage |