North Engineering Research Center Basement Fit-Out Infrastructure

  • 251 Shelby Lane
Information at a Glance

Use

Academic

Status

Active

Construction Type

Fit-Out

Current Phase

Programming

College or Division

College of Engineering

CA Filing Code

236-25-3926

Project GSF

19,636

Project Architect

Williams Blackstock Architects

Project Manager

Jessie Green

Project Summary

The original construction of the North Engineering Research Center (“NERC”), completed in 2013, included 19,636 gross square feet of basement shell space to be allocated and fit-out at the appropriate time.

The North Engineering Research Center Basement Fit-Out Infrastructure project (“Project”) will include the addition of areaways to the NERC basement. These areaways will provide daylight access to future fit-out spaces and provide access for materials and equipment enhancing the use of the facility.

A dedicated areaway for future equipment and construction access will not only enhance long term access and flexibility of the space but also minimize the impact to the building occupants during construction phase by providing a dedicated access point.

This Project will include utility relocations as necessary to maximize s121ng and location of areaways to provide valued enhancement to the basement spaces while minimizing the footprint of the project. Window placement will be optimized to provide the greatest impact to the occupied basement spaces. The Project scope includes cast-in-place concrete areaway walls, fixed aluminum windows with insulated glass lites matching the existing building, and stone veneer and coping that aligns with the adjacent building walls.

The Project will also provide an overhead door in the Northeast areaway to ensure adequate access to the basement spaces for ease of access to this level and future fit-outs and appropriate storm drainage systems.

Previous development plans for the basement provide guidance for the Project so as to ensure coordination with future fit out.


Information at a Glance

BOT Budget

$3,125,000

Funding Sources

  • University Central Reserves :
    $3,125,000

Banner/Project #

91312

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division College of Engineering
Status Active
Construction Phase Programming
Construction Type Fit-Out
GSF 19,636
Street Address 251 Shelby Lane
Zone
Project Number 236-25-3926
Architect Williams Blackstock Architects
Project Manager Jessie Green
Project Admin
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/236-25-3926
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91312
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The original construction of the North Engineering Research Center (“NERC”), completed in 2013, included 19,636 gross square feet of basement shell space to be allocated and fit-out at the appropriate time.

The North Engineering Research Center Basement Fit-Out Infrastructure project (“Project”) will include the addition of areaways to the NERC basement. These areaways will provide daylight access to future fit-out spaces and provide access for materials and equipment enhancing the use of the facility.

A dedicated areaway for future equipment and construction access will not only enhance long term access and flexibility of the space but also minimize the impact to the building occupants during construction phase by providing a dedicated access point.

This Project will include utility relocations as necessary to maximize s121ng and location of areaways to provide valued enhancement to the basement spaces while minimizing the footprint of the project. Window placement will be optimized to provide the greatest impact to the occupied basement spaces. The Project scope includes cast-in-place concrete areaway walls, fixed aluminum windows with insulated glass lites matching the existing building, and stone veneer and coping that aligns with the adjacent building walls.

The Project will also provide an overhead door in the Northeast areaway to ensure adequate access to the basement spaces for ease of access to this level and future fit-outs and appropriate storm drainage systems.

Previous development plans for the basement provide guidance for the Project so as to ensure coordination with future fit out.

Renderings
Budget 3125000
Banner Fund Number 91312
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage