New Tutwiler Residence Hall

  • Northeast corner of 10th Avenue and 12th Street
Information at a Glance

Use

Residential

Status

Active

Construction Type

New Construction

Current Phase

Closeout

College or Division

Division of Student Life

Bed Count

1284

CA Filing Code

279-16-950

Project GSF

383,015

Bid Date

October 22, 2019

Construction Start

June 2019

Construction End

August 1, 2022

COSC Date

July 15, 2022

Project Architect

Turner Batson Architects

General Contractor

B. L. Harbert, LLC

Project Manager

Trent Hall (8-2033)

Field Coordinator

Jon Chesnut (8-1684)

Project Admin

Cassidy Largin

Project Summary

This new facility will be the third residence hall built on the University’s campus over a 100 year time span honoring Julia Tutwiler, a champion for education in Alabama. Located southwest of the current Tutwiler Hall, the New Tutwiler Residence Hall will accommodate over 1,200 freshmen female students with two-person rooms, with private bathrooms in each room, lounges, and community/traditional-style residence hall spaces.

This new residence hall has been specially designed to meet student needs, as well as support annual move-in events and summer camps. Each level of the building includes smaller, intimate community-style living and study spaces to encourage a sense of comfort and togetherness. This new residence hall will also include on-site fitness amenities and a multipurpose room that doubles as a storm shelter that will provide a space for the residents to hold group meetings and social gatherings.

We know it wouldn’t be Tutwiler without Julia’s Market — the beloved food service venue in the current Tutwiler Hall will move to the New Tutwiler Residence Hall.

 

View Progress Photos!
Information at a Glance

BOT Budget

$144,900,659.00

Funding Sources

  • 2019 General Revenue Bonds:
    $110,000,000
  • Housing & Residential Communities Reserves:
    $31,524,170
  • Food Service Reserves:
    $2,902,124
  • University Reserves:
    $474,365

Banner/Project #

90739

Project Accountant

Demon Patrick (8-8714)

DATA LABEL DATA VALUE
Category Residential
Status Active
Construction Phase Closeout
Construction Type New Construction
GSF 383,015
Bid Date October 22, 2019
Project Number 279-16-950
Architect Turner Batson Architects
Project Manager Trent Hall (8-2033)
General Contractor B. L. Harbert, LLC
Project Summary

This new facility will be the third residence hall built on the University’s campus over a 100 year time span honoring Julia Tutwiler, a champion for education in Alabama. Located southwest of the current Tutwiler Hall, the New Tutwiler Residence Hall will accommodate over 1,200 freshmen female students with two-person rooms, with private bathrooms in each room, lounges, and community/traditional-style residence hall spaces.

This new residence hall has been specially designed to meet student needs, as well as support annual move-in events and summer camps. Each level of the building includes smaller, intimate community-style living and study spaces to encourage a sense of comfort and togetherness. This new residence hall will also include on-site fitness amenities and a multipurpose room that doubles as a storm shelter that will provide a space for the residents to hold group meetings and social gatherings.

We know it wouldn’t be Tutwiler without Julia’s Market — the beloved food service venue in the current Tutwiler Hall will move to the New Tutwiler Residence Hall.

 

View Progress Photos!
Renderings Array
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/7M27T/279-16-950/default.aspx
Campus Map Link https://map.concept3d.com/?id=1222#!m/436357
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Budget 144900659
Banner Fund Number 90739
Project Accountant Demon Patrick (8-8714)
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=9736427A-3F71-448F-843B-689BAD3797B7
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90739&detail=all
BOT Stage I September 2016
BOT Stage II April 2017
BOT Stage III April 2019
BOT Stage IV Deep Foundations Package
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF Array
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-177/
Zone
Street Address Northeast corner of 10th Avenue and 12th Street
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Tutwiler-Residence-Hall-279-16-950C.pdf
Construction Start June 2019
Scheduled Construction End August 1, 2022
College/Division Division of Student Life
Project Admin Cassidy Largin
Field Coordinator Jon Chesnut (8-1684)
Interior Designer
AiM Link https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90739
Construction Photos Link
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Attachment I
CSP I PDF
CSP II PDF
BOT Info Item PDF
COSC Date July 15, 2022
Year End Inspection
View Warranty Documents
Stage 1 Package Fields Array
Bed Count 1284
Funding Source(s) Array
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s) Array
Stage 3 BOT Submittal(s) Array
Stage 4 BOT Submittal(s) Array
Fundraising Site
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents Array
Bid Tabulations Array
360 Embed Code
BOT Stage Array