New Tutwiler Residence Hall

  • Northeast corner of 10th Avenue and 12th Street
Information at a Glance

Use

Residential

Status

Active

Construction Type

New Construction

Current Phase

Closeout

College or Division

Division of Student Life

Bed Count

1284

CA Filing Code

279-16-950

Project GSF

383,015

Bid Date

October 22, 2019

Construction Start

June 2019

Construction End

August 1, 2022

COSC Date

' July 15, 2022

Project Architect

Turner Batson Architects

General Contractor

B. L. Harbert, LLC

Project Manager

Trent Hall (8-2033)

Field Coordinator

Jon Chesnut (8-1684)

Project Admin

Cassidy Largin

Project Summary

This new facility will be the third residence hall built on the University’s campus over a 100 year time span honoring Julia Tutwiler, a champion for education in Alabama. Located southwest of the current Tutwiler Hall, the New Tutwiler Residence Hall will accommodate over 1,200 freshmen female students with two-person rooms, with private bathrooms in each room, lounges, and community/traditional-style residence hall spaces.

This new residence hall has been specially designed to meet student needs, as well as support annual move-in events and summer camps. Each level of the building includes smaller, intimate community-style living and study spaces to encourage a sense of comfort and togetherness. This new residence hall will also include on-site fitness amenities and a multipurpose room that doubles as a storm shelter that will provide a space for the residents to hold group meetings and social gatherings.

We know it wouldn’t be Tutwiler without Julia’s Market — the beloved food service venue in the current Tutwiler Hall will move to the New Tutwiler Residence Hall.

 

View Progress Photos!
Information at a Glance

BOT Budget

$144,900,659

Funding Sources

  • 2019 General Revenue Bonds :
    $110,000,000
  • Housing & Residential Communities Reserves :
    $31,524,170
  • Food Service Reserves :
    $2,902,124
  • University Reserves :
    $474,365

Banner/Project #

90739

Project Accountant

Demon Patrick (8-8714)

DATA LABEL DATA VALUE
Category Residential
Status Active
Construction Phase Closeout
Construction Type New Construction
GSF 383,015
Bid Date October 22, 2019
Project Number 279-16-950
Architect Turner Batson Architects
Project Manager Trent Hall (8-2033)
General Contractor B. L. Harbert, LLC
Project Summary

This new facility will be the third residence hall built on the University’s campus over a 100 year time span honoring Julia Tutwiler, a champion for education in Alabama. Located southwest of the current Tutwiler Hall, the New Tutwiler Residence Hall will accommodate over 1,200 freshmen female students with two-person rooms, with private bathrooms in each room, lounges, and community/traditional-style residence hall spaces.

This new residence hall has been specially designed to meet student needs, as well as support annual move-in events and summer camps. Each level of the building includes smaller, intimate community-style living and study spaces to encourage a sense of comfort and togetherness. This new residence hall will also include on-site fitness amenities and a multipurpose room that doubles as a storm shelter that will provide a space for the residents to hold group meetings and social gatherings.

We know it wouldn’t be Tutwiler without Julia’s Market — the beloved food service venue in the current Tutwiler Hall will move to the New Tutwiler Residence Hall.

 

View Progress Photos!
Renderings
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/7M27T/279-16-950/default.aspx
Campus Map Link https://map.concept3d.com/?id=1222#!m/436357
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Budget 144900659
Banner Fund Number 90739
Project Accountant Demon Patrick (8-8714)
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=9736427A-3F71-448F-843B-689BAD3797B7
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90739&detail=all
BOT Stage I September 2016
BOT Stage II April 2017
BOT Stage III April 2019
BOT Stage IV Deep Foundations Package
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-177/
Zone
Street Address Northeast corner of 10th Avenue and 12th Street
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Tutwiler-Residence-Hall-279-16-950C.pdf
Construction Start June 2019
Scheduled Construction End August 1, 2022
College/Division Division of Student Life
Project Admin Cassidy Largin
Field Coordinator Jon Chesnut (8-1684)
Interior Designer
AiM Link https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90739
Construction Photos Link
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Attachment I
CSP I PDF
CSP II PDF
BOT Info Item PDF
COSC Date July 15, 2022
Year End Inspection
View Warranty Documents
Stage 1 Package Fields
Bed Count 1284
Funding Source(s)
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Fundraising Site
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code
BOT Stage