Hewson Hall
- 380 Stadium Drive, Tuscaloosa, Alabama 35487
Use
Academic
Status
Construction Type
New Construction
Current Phase
Complete
College or Division
College of Business
CA Filing Code
055-18-1373
Project GSF
106,000
Bid Date
December 19, 2019
Construction Start
March 2020
Construction End
August 2021
COSC Date
' August 3, 2021
Project Architect
Williams Blackstock
General Contractor
WAR Construction
Project Manager
Josh Bollinger (8-8771)
Field Coordinator
Lee Orr
Interior Designer
Brittany Kyles (8-9001)
Project Admin
Cassidy Largin
Located next to the Stadium Drive Parking Deck and across from Alston Hall and Bruno Library, The new Hewson Hall on Stadium Drive will be a transformative addition to the business school complex.
Hewson Hall will provide classroom and office space to accommodate growth in both students and faculty. About 2/3 of the new building will be dedicated to education and training activities, and about 1/3 will be programmed for office and support space. This new facility will allow for areas in Bidgood Hall and Alston Hall to be transformed into collaborative engagement and team spaces for the benefit of students, faculty and staff.
View Progress Photos!
BOT Budget
$54,380,735.00
Funding Sources
-
2019 General Revenue Bonds - E&G :
$24,380,735 -
2019 General Revenue Bonds - CCoB :
$15,000,000 -
Gifts :
$15,000,000
Banner/Project #
90809
Project Accountant
Kimberly Lewis (8-7603)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
October 31, 2019
Utilities and Infrastructure Package -
December 19, 2019
Building Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
Status | Closed |
Construction Phase | Complete |
Construction Type | New Construction |
GSF | 106,000 |
Bid Date | December 19, 2019 |
Project Number | 055-18-1373 |
Banner Fund Number | 90809 |
Architect | Williams Blackstock |
Project Manager | Josh Bollinger (8-8771) |
General Contractor | WAR Construction |
Project Summary |
Located next to the Stadium Drive Parking Deck and across from Alston Hall and Bruno Library, The new Hewson Hall on Stadium Drive will be a transformative addition to the business school complex. Hewson Hall will provide classroom and office space to accommodate growth in both students and faculty. About 2/3 of the new building will be dedicated to education and training activities, and about 1/3 will be programmed for office and support space. This new facility will allow for areas in Bidgood Hall and Alston Hall to be transformed into collaborative engagement and team spaces for the benefit of students, faculty and staff. View Progress Photos! |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/055-18-1373/SitePages/Home.aspx |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/348340 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/Zone2/buildings/055/default.aspx |
Budget | 54380735 |
Project Accountant | Kimberly Lewis (8-7603) |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=88675AC0-F7DF-4B58-92E7-8367A3029DD3 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90809&detail=all |
BOT Stage I | November 2017 |
BOT Stage II | February 2018 |
BOT Stage III | September 21, 2018 |
BOT Stage IV | TBD |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-157/default.aspx |
Renderings | |
Zone | |
Street Address | 380 Stadium Drive, Tuscaloosa, Alabama 35487 |
View Bid Tab | |
Construction Start | March 2020 |
Scheduled Construction End | August 2021 |
College/Division | College of Business |
Project Admin | Cassidy Largin |
Field Coordinator | Lee Orr |
Interior Designer | Brittany Kyles (8-9001) |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90809 |
Construction Photos Link | |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
COSC Date | August 3, 2021 |
Year End Inspection | |
View Warranty Documents | |
Stage 1 Package Fields | |
Stage 1 BOT Submittal(s) | |
Funding Source(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Fundraising Site | https://giving.ua.edu/hewsonhall/ |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |