Finance Administrative Services Building
- 220 Paul W. Bryant Drive East
Use
Administrative
Status
Construction Type
Renovation
Current Phase
Design
College or Division
Division of Finance and Operations
CA Filing Code
338-23-3205
Project GSF
9,089
Bid Date
July 2024
Construction Start
TBD
Construction End
TBD
COSC Date
' TBD
Project Architect
B Group Architecture
General Contractor
TBD
Project Manager
Brittany Kyles
Field Coordinator
Chad Elliott
Interior Designer
TBD
Project Admin
Haley Tubbs
The Finance Administrative Services Building Renovation will entail a full interior renovation of the existing 9,089 gross square feet building located at 220 Paul W. Bryant Drive East.
The building will house departments within the Office of Finance including Financial Accounting and Reporting, the Tax Office, the Budget Office, and Finance Information Systems and Data Integrity, providing centralized office, meeting, and support spaces. All building systems will also be replaced as they are at the end of their useful life.
Alabama Credit Union’s new facility located on University Boulevard is currently being occupied which will enable this project to proceed Summer 2024.
BOT Budget
$6,900,000.00
Funding Sources
-
University Central Reserves :
$6,171,286 -
Finance and Operations Reserves :
$728,714
Banner/Project #
91211
Project Accountant
Elsie Smith
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Administrative |
College/Division | Division of Finance and Operations |
Status | Active |
Construction Phase | Design |
Construction Type | Renovation |
GSF | 9,089 |
Street Address | 220 Paul W. Bryant Drive East |
Zone | |
Project Number | 338-23-3205 |
Architect | B Group Architecture |
Project Manager | Brittany Kyles |
Project Admin | Haley Tubbs |
Field Coordinator | Chad Elliott |
General Contractor | TBD |
Interior Designer | TBD |
Bid Date | July 2024 |
Construction Start | TBD |
Scheduled Construction End | TBD |
COSC Date | TBD |
Year End Inspection | TBD |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/338-23-3205/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91211 |
Campus Map Link | https://map.concept3d.com/?id=1222#!ce/31483?ct/31490,31883,31890,31891?m/676659?s/?mc/33.205872000000014,-87.53384399999999?z/18.690302993531805?lvl/0?share |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Finance Administrative Services Building Renovation will entail a full interior renovation of the existing 9,089 gross square feet building located at 220 Paul W. Bryant Drive East. The building will house departments within the Office of Finance including Financial Accounting and Reporting, the Tax Office, the Budget Office, and Finance Information Systems and Data Integrity, providing centralized office, meeting, and support spaces. All building systems will also be replaced as they are at the end of their useful life. Alabama Credit Union’s new facility located on University Boulevard is currently being occupied which will enable this project to proceed Summer 2024. |
Renderings | |
Budget | 6900000 |
Banner Fund Number | 91211 |
Project Accountant | Elsie Smith |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |