EV Bus and Charging Infrastructure

  • UA Transportation Maintenance Facility, USC Campus
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

New Construction

Current Phase

Construction

College or Division

Other

CA Filing Code

TRN-23-3219

Project GSF

N/A

Bid Date

December 12, 2024

Construction Start

February 10, 2025

Construction End

June 6, 2025

Project Architect

Stewart Engineering

General Contractor

Premier Service Company

Project Manager

Jessica Green

Project Summary

The EV Bus and Charging Infrastructure Project will purchase eight (8) electric buses and purchase and install electric distribution infrastructure and charging equipment to support new electric bus charging, assisting in modernizing the campus Crimson Ride bus fleet. This modernization is a foundational stage in the UA Transportation department’s “Zero-Emission Fleet Transition Plan”.

These electric bus chargers will be located at the Transportation Maintenance Facility, adjacent to the existing bus parking area on the University Services Campus for overnight fleet charging.

The new electric vehicle charging system and the electric bus fleet will also be utilized by the Alabama Mobility and Power (AMP) Center in multiple electric vehicle Research and Development and workforce training initiatives.


Information at a Glance

BOT Budget

$10,780,164

Funding Sources

  • Grant Funds :
    $7,890,065
  • University Central Reserves :
    $2,230,644
  • Transportation Reserves :
    $479,455
  • Center for Advanced Vehicle Technologies :
    $180,000
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Active
Construction Phase Construction
Construction Type New Construction
GSF N/A
Street Address UA Transportation Maintenance Facility, USC Campus
Zone
Project Number TRN-23-3219
Architect Stewart Engineering
Project Manager Jessica Green
Project Admin
Field Coordinator
General Contractor Premier Service Company
Interior Designer
Bid Date December 12, 2024
Construction Start February 10, 2025
Scheduled Construction End June 6, 2025
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The EV Bus and Charging Infrastructure Project will purchase eight (8) electric buses and purchase and install electric distribution infrastructure and charging equipment to support new electric bus charging, assisting in modernizing the campus Crimson Ride bus fleet. This modernization is a foundational stage in the UA Transportation department’s “Zero-Emission Fleet Transition Plan”.

These electric bus chargers will be located at the Transportation Maintenance Facility, adjacent to the existing bus parking area on the University Services Campus for overnight fleet charging.

The new electric vehicle charging system and the electric bus fleet will also be utilized by the Alabama Mobility and Power (AMP) Center in multiple electric vehicle Research and Development and workforce training initiatives.

Renderings
Budget 10780164
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage