Delta Kappa Epsilon Addition and Renovation

  • 976 University Boulevard
Information at a Glance

Use

Greek

Status

Active

Construction Type

Addition

Current Phase

Programming

College or Division

Division of Student Life

CA Filing Code

913-23-3075

Project GSF

1,920

Project Architect

Clark, Geer, Latham and Associates, Inc.

General Contractor

TBD

Project Manager

Michael Hand

Field Coordinator

TBD

Project Admin

Alison Langham

Project Summary

The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the
renovation and repurposing of existing interior space and the enclosure of portions of patios and
porches on the north elevation for additional square footage. This project will efficiently and
effectively meet the needs of the chapter and help bring the house in line with current trends in
Greek life and improve the student experience.

The current house is approximately 24,824 gross square feet (“GSF”) and 650 GSF will be added
for a total of 25,474 GSF. The main front porch will be expanded and additional hardscaping at
grade will be provided. The house was originally constructed in 2006 and featured 28 beds.
Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new
lounge and common areas; enclosing approximately 650sf. of the existing north patio to increase
dining and improve circulation; re-working the serving and beverage lines; reworking the 2nd
floor bedrooms to accommodate egress to the new 2nd floor porch; and removing walls in the
basement chapter room for better use of the space and adding a sink in the basement locker room.
Exterior work will include reworking the north porch and stairs to the basement to improve
circulation in and out of the chapter house; reworking the south patio and existing windows to
add new doors and a patio area with new ADA ramp access in and out of the chapter house;
reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking
landscaping to meet UA standards.

In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues
will be addressed as required. The deferred maintenance liability being addressed by the project
is approximately $1 million.


Information at a Glance

BOT Budget

$5,000,000.00

Funding Sources

  • Chapter Payables:
    $3,500,000
  • Chapter Funds:
    $1,500,000

Banner/Project #

98891

Project Accountant

Sherell McVay

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Greek
College/Division Division of Student Life
Status Active
Construction Phase Programming
Construction Type Addition
GSF 1,920
Street Address 976 University Boulevard
Zone 2
Project Number 913-23-3075
Architect Clark, Geer, Latham and Associates, Inc.
Project Manager Michael Hand
Project Admin Alison Langham
Field Coordinator TBD
General Contractor TBD
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/913-23-3075
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98891
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the
renovation and repurposing of existing interior space and the enclosure of portions of patios and
porches on the north elevation for additional square footage. This project will efficiently and
effectively meet the needs of the chapter and help bring the house in line with current trends in
Greek life and improve the student experience.

The current house is approximately 24,824 gross square feet (“GSF”) and 650 GSF will be added
for a total of 25,474 GSF. The main front porch will be expanded and additional hardscaping at
grade will be provided. The house was originally constructed in 2006 and featured 28 beds.
Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new
lounge and common areas; enclosing approximately 650sf. of the existing north patio to increase
dining and improve circulation; re-working the serving and beverage lines; reworking the 2nd
floor bedrooms to accommodate egress to the new 2nd floor porch; and removing walls in the
basement chapter room for better use of the space and adding a sink in the basement locker room.
Exterior work will include reworking the north porch and stairs to the basement to improve
circulation in and out of the chapter house; reworking the south patio and existing windows to
add new doors and a patio area with new ADA ramp access in and out of the chapter house;
reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking
landscaping to meet UA standards.

In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues
will be addressed as required. The deferred maintenance liability being addressed by the project
is approximately $1 million.

Renderings
Budget 5000000
Banner Fund Number 98891
Project Accountant Sherell McVay
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage Array