Delta Kappa Epsilon Addition and Renovation

  • 976 University Boulevard, Existing Chapter Location
Information at a Glance

Use

Greek

Status

Active

Construction Type

Addition

Current Phase

Construction

College or Division

Division of Student Life

CA Filing Code

913-23-3075

Project GSF

7,931

Bid Date

September 12, 2023

Construction End

July 2024

Project Architect

Clark, Geer, Latham and Associates, Inc.

General Contractor

WAR Construction, Inc.

Project Manager

Michael Hand

Field Coordinator

Zach Green

Project Admin

Cassidy Largin

Project Summary

The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the renovation and repurposing of existing interior space and the enclosure of portions of patios and porches on the north elevation for additional square footage. This project will efficiently and effectively meet the needs of the chapter and help bring the house in line with current trends in Greek life and improve the student experience.

The current house is approximately 24,824 gross square feet (“GSF”) and 614 GSF will be added for a total of 25,438 GSF. The main front porch will be expanded and additional hardscaping at grade will be provided as necessary for ADA access. The house was originally constructed in 2006 and featured 28 beds.

Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new lounge and common areas; enclosing approximately 650sf of the existing north patio to increase dining and improve circulation; re-working the serving and beverage lines; reworking the second-floor bedrooms to accommodate egress to the new second-floor porch; and removing walls in the basement chapter room for better use of the space and adding a sink in the basement locker room. Additional interior work will be relocating an interior spiral staircase from the first floor to the basement to help with improved circulation on both floors.

Exterior work will include reworking the north porch and widening the front stairs and adding stairs to the east side of the porch to the basement to improve circulation in and out of the chapter house. The new north second-floor porch will extend the entire inset on the north side. A portion of this porch will be covered by the existing north portico.

The first-floor south patio will be reworked turning existing windows into new doors and a patio area with new ADA ramp access in and out of the chapter house; reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking landscaping to meet UA standards.

In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues will be addressed as required. The deferred maintenance liability being addressed by the project is approximately $1 million.


Information at a Glance

BOT Budget

$7,246,914.00

Funding Sources

  • Chapter Funds :
    $750,000
  • Chapter Payables :
    $6,496,914

Banner/Project #

98891

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Greek
College/Division Division of Student Life
Status Active
Construction Phase Construction
Construction Type Addition
GSF 7,931
Street Address 976 University Boulevard, Existing Chapter Location
Zone 2
Project Number 913-23-3075
Architect Clark, Geer, Latham and Associates, Inc.
Project Manager Michael Hand
Project Admin Cassidy Largin
Field Coordinator Zach Green
General Contractor WAR Construction, Inc.
Interior Designer
Bid Date September 12, 2023
Construction Start
Scheduled Construction End July 2024
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/913-23-3075
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98891
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the renovation and repurposing of existing interior space and the enclosure of portions of patios and porches on the north elevation for additional square footage. This project will efficiently and effectively meet the needs of the chapter and help bring the house in line with current trends in Greek life and improve the student experience.

The current house is approximately 24,824 gross square feet (“GSF”) and 614 GSF will be added for a total of 25,438 GSF. The main front porch will be expanded and additional hardscaping at grade will be provided as necessary for ADA access. The house was originally constructed in 2006 and featured 28 beds.

Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new lounge and common areas; enclosing approximately 650sf of the existing north patio to increase dining and improve circulation; re-working the serving and beverage lines; reworking the second-floor bedrooms to accommodate egress to the new second-floor porch; and removing walls in the basement chapter room for better use of the space and adding a sink in the basement locker room. Additional interior work will be relocating an interior spiral staircase from the first floor to the basement to help with improved circulation on both floors.

Exterior work will include reworking the north porch and widening the front stairs and adding stairs to the east side of the porch to the basement to improve circulation in and out of the chapter house. The new north second-floor porch will extend the entire inset on the north side. A portion of this porch will be covered by the existing north portico.

The first-floor south patio will be reworked turning existing windows into new doors and a patio area with new ADA ramp access in and out of the chapter house; reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking landscaping to meet UA standards.

In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues will be addressed as required. The deferred maintenance liability being addressed by the project is approximately $1 million.

Renderings
Budget 7246914
Banner Fund Number 98891
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage