Delta Kappa Epsilon Addition and Renovation
- 976 University Boulevard, Existing Chapter Location
Use
Greek
Status
Construction Type
Addition
Current Phase
Construction
College or Division
Division of Student Life
CA Filing Code
913-23-3075
Project GSF
7,931
Bid Date
September 12, 2023
Construction End
July 2024
Project Architect
Clark, Geer, Latham and Associates, Inc.
General Contractor
WAR Construction, Inc.
Project Manager
Michael Hand
Field Coordinator
Zach Green
Project Admin
Cassidy Largin
The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the renovation and repurposing of existing interior space and the enclosure of portions of patios and porches on the north elevation for additional square footage. This project will efficiently and effectively meet the needs of the chapter and help bring the house in line with current trends in Greek life and improve the student experience.
The current house is approximately 24,824 gross square feet (“GSF”) and 614 GSF will be added for a total of 25,438 GSF. The main front porch will be expanded and additional hardscaping at grade will be provided as necessary for ADA access. The house was originally constructed in 2006 and featured 28 beds.
Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new lounge and common areas; enclosing approximately 650sf of the existing north patio to increase dining and improve circulation; re-working the serving and beverage lines; reworking the second-floor bedrooms to accommodate egress to the new second-floor porch; and removing walls in the basement chapter room for better use of the space and adding a sink in the basement locker room. Additional interior work will be relocating an interior spiral staircase from the first floor to the basement to help with improved circulation on both floors.
Exterior work will include reworking the north porch and widening the front stairs and adding stairs to the east side of the porch to the basement to improve circulation in and out of the chapter house. The new north second-floor porch will extend the entire inset on the north side. A portion of this porch will be covered by the existing north portico.
The first-floor south patio will be reworked turning existing windows into new doors and a patio area with new ADA ramp access in and out of the chapter house; reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking landscaping to meet UA standards.
In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues will be addressed as required. The deferred maintenance liability being addressed by the project is approximately $1 million.
BOT Budget
$7,246,914.00
Funding Sources
-
Chapter Funds :
$750,000 -
Chapter Payables :
$6,496,914
Banner/Project #
98891
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Greek |
College/Division | Division of Student Life |
Status | Active |
Construction Phase | Construction |
Construction Type | Addition |
GSF | 7,931 |
Street Address | 976 University Boulevard, Existing Chapter Location |
Zone | 2 |
Project Number | 913-23-3075 |
Architect | Clark, Geer, Latham and Associates, Inc. |
Project Manager | Michael Hand |
Project Admin | Cassidy Largin |
Field Coordinator | Zach Green |
General Contractor | WAR Construction, Inc. |
Interior Designer | |
Bid Date | September 12, 2023 |
Construction Start | |
Scheduled Construction End | July 2024 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/913-23-3075 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98891 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The proposed Delta Kappa Epsilon Addition and Renovation project (“Project”) will include the renovation and repurposing of existing interior space and the enclosure of portions of patios and porches on the north elevation for additional square footage. This project will efficiently and effectively meet the needs of the chapter and help bring the house in line with current trends in Greek life and improve the student experience. The current house is approximately 24,824 gross square feet (“GSF”) and 614 GSF will be added for a total of 25,438 GSF. The main front porch will be expanded and additional hardscaping at grade will be provided as necessary for ADA access. The house was originally constructed in 2006 and featured 28 beds. Interior work will include repurposing six (6) bedrooms and three (3) bathrooms for use as new lounge and common areas; enclosing approximately 650sf of the existing north patio to increase dining and improve circulation; re-working the serving and beverage lines; reworking the second-floor bedrooms to accommodate egress to the new second-floor porch; and removing walls in the basement chapter room for better use of the space and adding a sink in the basement locker room. Additional interior work will be relocating an interior spiral staircase from the first floor to the basement to help with improved circulation on both floors. Exterior work will include reworking the north porch and widening the front stairs and adding stairs to the east side of the porch to the basement to improve circulation in and out of the chapter house. The new north second-floor porch will extend the entire inset on the north side. A portion of this porch will be covered by the existing north portico. The first-floor south patio will be reworked turning existing windows into new doors and a patio area with new ADA ramp access in and out of the chapter house; reworking grades at the south yard to add hard-scape and to tie into the new ramp; and reworking landscaping to meet UA standards. In addition, mechanical, electrical, plumbing, and fire protection deferred maintenance issues will be addressed as required. The deferred maintenance liability being addressed by the project is approximately $1 million. |
Renderings | |
Budget | 7246914 |
Banner Fund Number | 98891 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |