Colonial Drive and University Boulevard Infrastructure & Enhancements
- Between Carmichael Hall and Judy Bonner Drive on Colonial Drive and University Boulevard
Use
Utilities & Infrastructure
Status
Construction Type
Other
Current Phase
Construction
College or Division
Other
CA Filing Code
TRN-23-3384
Project GSF
N/A
Bid Date
February 27, 2024
Construction Start
April 2024
Construction End
August 2024
Project Architect
Duncan Coker Associates, PC
General Contractor
John Plott Company, Inc.
Project Manager
Jeremy Wood
Field Coordinator
TBD
The Colonial Drive and University Boulevard Infrastructure and Enhancements Project will improve the teaching, learning, and working environments of campus constituents by providing reliable and efficient thermal energy to facilities by replacing systems which have reached the end of their functional service life. By connecting the existing facilities to the central system, which features efficient and centralized equipment in the energy plants, the Project will free campus exterior space currently occupied by existing equipment for other uses including, but not limited to, parking, landscaping, and hardscape improvements. Furthermore, reducing the cost to provide cooling and heating to buildings will support The University of Alabama in maintaining a competitive cost of attendance.
This Project will include rerouting the sanitary sewer that is currently running under Reese Phifer Hall and McClure Library, new thermal piping routed to Reese Phifer Hall and connection to the Central Thermal System, storm sewer at the intersection of University Boulevard and Colonial Drive, replacement of critical water lines, and extension of UA natural gas to create
system redundancy, as well as improvements to the roadways including paving, road markings, landscaping, bike paths, lighting and security.
Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The Project will facilitate the removal of concrete paving under University Boulevard in advance of future University Boulevard enhancement projects. The Project will also address the mitigation of flooding risk present at Doster and Reese Phifer Hall, as well as support future flood mitigation on University Boulevard and the Quad.
The Project has been separated into two (2) packages: Package A – Colonial Drive and University Boulevard 2024 (“Package A”), which includes critical infrastructure and utility improvements within Colonial Drive and 9th Avenue; and Package B – University Boulevard 2025 (“Package B”), which includes critical infrastructure and utility improvements within University Boulevard on the West side of Campus.
The Project was separated into two packages to better level and coordinate the amount of ongoing civil and infrastructure projects during the Summer and to better coordinate with the McLure Library Renovation and Addition project which requires access during the Summer of 2024 to expedite work along University so that access can be returned in time for Fall 2024 classes.
The Project is key to enhancing the pedestrian and vehicular traffic to and from the academic core of campus as a continuation of the Colonial Drive enhancements previously completed south of Judy Bonner Drive. This corridor is a key pedestrian and transportation link to the campus for both on and off campus residents and serves as a gateway for many to the University.
The Project will also address significant deferred maintenance and facility renewal liabilities for the Campus by replacing existing undersized local utility Infrastructure that serves Reese Phifer Hall and aging sanitary sewer systems with more centralized and modern equipment.
BOT Budget
$15,000,000.00
Funding Sources
-
University Central Reserves :
$15,000,000
Banner/Project #
91234
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Utilities & Infrastructure |
College/Division | Other |
Status | Active |
Construction Phase | Construction |
Construction Type | Other |
GSF | N/A |
Street Address | Between Carmichael Hall and Judy Bonner Drive on Colonial Drive and University Boulevard |
Zone | |
Project Number | TRN-23-3384 |
Architect | Duncan Coker Associates, PC |
Project Manager | Jeremy Wood |
Project Admin | |
Field Coordinator | TBD |
General Contractor | John Plott Company, Inc. |
Interior Designer | |
Bid Date | February 27, 2024 |
Construction Start | April 2024 |
Scheduled Construction End | August 2024 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/TRN-23-3384 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91234 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Colonial Drive and University Boulevard Infrastructure and Enhancements Project will improve the teaching, learning, and working environments of campus constituents by providing reliable and efficient thermal energy to facilities by replacing systems which have reached the end of their functional service life. By connecting the existing facilities to the central system, which features efficient and centralized equipment in the energy plants, the Project will free campus exterior space currently occupied by existing equipment for other uses including, but not limited to, parking, landscaping, and hardscape improvements. Furthermore, reducing the cost to provide cooling and heating to buildings will support The University of Alabama in maintaining a competitive cost of attendance. This Project will include rerouting the sanitary sewer that is currently running under Reese Phifer Hall and McClure Library, new thermal piping routed to Reese Phifer Hall and connection to the Central Thermal System, storm sewer at the intersection of University Boulevard and Colonial Drive, replacement of critical water lines, and extension of UA natural gas to create Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The Project will facilitate the removal of concrete paving under University Boulevard in advance of future University Boulevard enhancement projects. The Project will also address the mitigation of flooding risk present at Doster and Reese Phifer Hall, as well as support future flood mitigation on University Boulevard and the Quad. The Project has been separated into two (2) packages: Package A – Colonial Drive and University Boulevard 2024 (“Package A”), which includes critical infrastructure and utility improvements within Colonial Drive and 9th Avenue; and Package B – University Boulevard 2025 (“Package B”), which includes critical infrastructure and utility improvements within University Boulevard on the West side of Campus. The Project was separated into two packages to better level and coordinate the amount of ongoing civil and infrastructure projects during the Summer and to better coordinate with the McLure Library Renovation and Addition project which requires access during the Summer of 2024 to expedite work along University so that access can be returned in time for Fall 2024 classes. The Project is key to enhancing the pedestrian and vehicular traffic to and from the academic core of campus as a continuation of the Colonial Drive enhancements previously completed south of Judy Bonner Drive. This corridor is a key pedestrian and transportation link to the campus for both on and off campus residents and serves as a gateway for many to the University. The Project will also address significant deferred maintenance and facility renewal liabilities for the Campus by replacing existing undersized local utility Infrastructure that serves Reese Phifer Hall and aging sanitary sewer systems with more centralized and modern equipment. |
Renderings | |
Budget | 15000000 |
Banner Fund Number | 91234 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |