Greek Assembly Hall
- Campus Drive East
Use
Public Safety
Status
Construction Type
New Construction
Current Phase
Construction
College or Division
Other
CA Filing Code
356-21-2318
Project GSF
13,757
Bid Date
March 1, 2022
Construction Start
April 11, 2022
Construction End
Spring 2023
Project Architect
Adams Stewart Architecture, LLC
General Contractor
J.T. Harrison Construction Co., Inc.
Project Manager
Leila Ahmady (8-7241)
Field Coordinator
Chuck Hinton
Project Admin
Haley Tubbs
The Bryce Lawn Community Safe Room project will enhance safety and security during severe weather events for students, faculty and staff, and visitors in the vicinity of the Bryce Lawn area on the campus of The University of Alabama. The conveniently located and accessible multipurpose facility will also provide program space for campus groups including events, breakout meeting spaces and general use.
To be located on Campus Drive East between the Recreation Center (Rec) and Bryce Lawn Apartments, the Project will serve the overall east-central campus area as there is a high density of students in the area and in the surrounding housing complexes and fraternity houses along University Boulevard, Bryce Lawn Drive and Jefferson Avenue. The Project will also provide quick access for users of the Rec Fields during other inclement weather events.
View Progress Photos!
BOT Budget
$9,793,825.00
Funding Sources
-
Federal Emergency Management Administration-Pre-Disaster Mitigation Grant Program:
$3,565,669 -
University Central Reserves:
$6,092,302
Banner/Project #
90944
Project Accountant
Cindy Fowler
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Public Safety |
College/Division | Other |
Status | Active |
Construction Phase | Construction |
Construction Type | New Construction |
GSF | 13,757 |
Street Address | Campus Drive East |
Zone | 4 |
Project Number | 356-21-2318 |
Architect | Adams Stewart Architecture, LLC |
Project Manager | Leila Ahmady (8-7241) |
Project Admin | Haley Tubbs |
Field Coordinator | Chuck Hinton |
General Contractor | J.T. Harrison Construction Co., Inc. |
Interior Designer | |
Bid Date | March 1, 2022 |
Construction Start | April 11, 2022 |
Scheduled Construction End | Spring 2023 |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/356-21-2318 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90944 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/576102?ce/31890?bm/?ct/40824,31490?mc/33.21292070361906,-87.5374746322632?z/16?lvl/0 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | The Bryce Lawn Community Safe Room project will enhance safety and security during severe weather events for students, faculty and staff, and visitors in the vicinity of the Bryce Lawn area on the campus of The University of Alabama. The conveniently located and accessible multipurpose facility will also provide program space for campus groups including events, breakout meeting spaces and general use. To be located on Campus Drive East between the Recreation Center (Rec) and Bryce Lawn Apartments, the Project will serve the overall east-central campus area as there is a high density of students in the area and in the surrounding housing complexes and fraternity houses along University Boulevard, Bryce Lawn Drive and Jefferson Avenue. The Project will also provide quick access for users of the Rec Fields during other inclement weather events. View Progress Photos! |
Renderings | Array |
Budget | 9793825 |
Banner Fund Number | 90944 |
Project Accountant | Cindy Fowler |
Funding Source(s) | Array |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | Array |
Stage 2 BOT Submittal(s) | Array |
Stage 3 BOT Submittal(s) | Array |
Stage 4 BOT Submittal(s) | Array |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | Array |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage | Array |