Greek Assembly Hall

  • Campus Drive East
Information at a Glance

Use

Public Safety

Status

Active

Construction Type

New Construction

Current Phase

Construction

College or Division

Other

CA Filing Code

356-21-2318

Project GSF

13,757

Bid Date

March 1, 2022

Construction Start

April 11, 2022

Construction End

Spring 2023

Project Architect

Adams Stewart Architecture, LLC

General Contractor

J.T. Harrison Construction Co., Inc.

Project Manager

Leila Ahmady (8-7241)

Field Coordinator

Chuck Hinton

Project Admin

Haley Tubbs

Project Summary

The Bryce Lawn Community Safe Room project will enhance safety and security during severe weather events for students, faculty and staff, and visitors in the vicinity of the Bryce Lawn area on the campus of The University of Alabama. The conveniently located and accessible multipurpose facility will also provide program space for campus groups including events, breakout meeting spaces and general use.

To be located on Campus Drive East between the Recreation Center (Rec) and Bryce Lawn Apartments, the Project will serve the overall east-central campus area as there is a high density of students in the area and in the surrounding housing complexes and fraternity houses along University Boulevard, Bryce Lawn Drive and Jefferson Avenue. The Project will also provide quick access for users of the Rec Fields during other inclement weather events.

 

View Progress Photos!
Information at a Glance

BOT Budget

$9,793,825.00

Funding Sources

  • Federal Emergency Management Administration-Pre-Disaster Mitigation Grant Program:
    $3,565,669
  • University Central Reserves:
    $6,092,302

Banner/Project #

90944

Project Accountant

Cindy Fowler

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2


Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Public Safety
College/Division Other
Status Active
Construction Phase Construction
Construction Type New Construction
GSF 13,757
Street Address Campus Drive East
Zone 4
Project Number 356-21-2318
Architect Adams Stewart Architecture, LLC
Project Manager Leila Ahmady (8-7241)
Project Admin Haley Tubbs
Field Coordinator Chuck Hinton
General Contractor J.T. Harrison Construction Co., Inc.
Interior Designer
Bid Date March 1, 2022
Construction Start April 11, 2022
Scheduled Construction End Spring 2023
COSC Date
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/356-21-2318
AiM Link https://fmax.fa.ua.edu/fmax/screen/WO_VIEW?proposal=90944
Campus Map Link https://map.concept3d.com/?id=1222#!m/576102?ce/31890?bm/?ct/40824,31490?mc/33.21292070361906,-87.5374746322632?z/16?lvl/0
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Bryce Lawn Community Safe Room project will enhance safety and security during severe weather events for students, faculty and staff, and visitors in the vicinity of the Bryce Lawn area on the campus of The University of Alabama. The conveniently located and accessible multipurpose facility will also provide program space for campus groups including events, breakout meeting spaces and general use.

To be located on Campus Drive East between the Recreation Center (Rec) and Bryce Lawn Apartments, the Project will serve the overall east-central campus area as there is a high density of students in the area and in the surrounding housing complexes and fraternity houses along University Boulevard, Bryce Lawn Drive and Jefferson Avenue. The Project will also provide quick access for users of the Rec Fields during other inclement weather events.

 

View Progress Photos!
Renderings Array
Budget 9793825
Banner Fund Number 90944
Project Accountant Cindy Fowler
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s) Array
Stage 3 BOT Submittal(s) Array
Stage 4 BOT Submittal(s) Array
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations Array
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage Array